Plan Review Details - Permit 13010247
Plan Review Stops For Permit 13010247
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2013-01-15 Cont ID  
Sent By rlecky Date 2013-01-15 Time 14:01 Rev Time 0.00
Received By rlecky Date 2013-01-15 Time 12:39 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2013-01-14 Cont ID  
Sent By lwagner Date 2013-01-14 Time 09:22 Rev Time 0.00
Received By lwagner Date 2013-01-11 Time 15:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2013-01-15 Cont ID  
Sent By rlecky Date 2013-01-15 Time 14:01 Rev Time 0.00
Received By rlecky Date 2013-01-10 Time 15:06 Sent To  
Notes
2013-01-11 15:06:35B--2

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2013-01-14 Cont ID  
Sent By tgordon Date 2013-01-14 Time 14:21 Rev Time 0.00
Received By tgordon Date 2013-01-14 Time 14:06 Sent To  
Notes
2013-01-14 14:15:40*** PROVISO ***
  
 1) COMPLY WITH, 2010 FBC/M 504.7 COMMERCIAL CLOTHES
 DRYERS.
 THE INSTALLATION OF DRYER EXHAUST DUCTS SERVING TYPE 2
 CLOTHES DRYERS SHALL COMPLY WITH THE APPLIANCE
 MANUFACTURER'S INSTALLATION INSTRUCTIONS. EXHAUST FAN
 MOTORS INSTALLED IN EXHAUST SYSTEMS SHALL BE LOCATED
 OUTSIDE OF THE AIRSTREAM. IN MULTIPLE INSTALLATIONS,
 THE FAN SHALL OPERATE CONTINUOUSLY OR BE INTERLOCKED TO
 OPERATE WHEN ANY INDIVIDUAL UNIT IS OPERATING. DUCTS
 SHALL HAVE A MINIMUM CLEARANCE OF 6 INCHES (152 MM) TO
 COMBUSTIBLE MATERIALS. CLOTHES DRYER TRANSITION DUCTS
 USED TO CONNECT THE APPLIANCE TO THE EXHAUST DUCT
 SYSTEM SHALL BE LIMITED TO SINGLE LENGTHS NOT TO EXCEED
 8 FEET (2438 MM) IN LENGTH AND SHALL BE LISTED AND
 LABELED FOR THE APPLICATION. TRANSITION DUCTS SHALL NOT
 BE CONCEALED WITHIN CONSTRUCTION.
  
 OR, 2010 FBC/M 504.6 DOMESTIC CLOTHES DRYER DUCTS.
 EXHAUST DUCTS FOR DOMESTIC CLOTHES DRYERS SHALL CONFORM
 TO THE REQUIREMENTS OF SECTIONS 504.6.1 THROUGH
 504.6.7.
 504.6.1 MATERIAL AND SIZE.
 EXHAUST DUCTS SHALL HAVE A SMOOTH INTERIOR FINISH AND
 SHALL BE CONSTRUCTED OF METAL A MINIMUM 0.016 INCH (0.4
 MM) THICK. THE EXHAUST DUCT SIZE SHALL BE 4 INCHES (102
 MM) NOMINAL IN DIAMETER.
 504.6.2 DUCT INSTALLATION.
 EXHAUST DUCTS SHALL BE SUPPORTED AT 4-FOOT (1219 MM)
 INTERVALS AND SECURED IN PLACE. THE INSERT END OF THE
 DUCT SHALL EXTEND INTO THE ADJOINING DUCT OR FITTING IN
 THE DIRECTION OF AIRFLOW. DUCTS SHALL NOT BE JOINED
 WITH SCREWS OR SIMILAR FASTENERS THAT PROTRUDE INTO THE
 INSIDE OF THE DUCT.
 504.6.3 TRANSITION DUCTS.
 TRANSITION DUCTS USED TO CONNECT THE DRYER TO THE
 EXHAUST DUCT SYSTEM SHALL BE A SINGLE LENGTH THAT IS
 LISTED AND LABELED IN ACCORDANCE WITH UL 2158A.
 TRANSITION DUCTS SHALL BE A MAXIMUM OF 8 FEET (2438 MM)
 IN LENGTH AND SHALL NOT BE CONCEALED WITHIN
 CONSTRUCTION.
 MECHANICAL PLAN REVIEW BY:
 TOM GORDON (HY-BYRD INC.) (561) 805-6732
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2013-01-14 Cont ID  
Sent By lwagner Date 2013-01-14 Time 09:22 Rev Time 0.00
Received By lwagner Date 2013-01-11 Time 15:45 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved