Plan Review Stops For Permit 13010222 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2013-10-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-10-28 |
Time |
13:59 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-10-28 |
Time |
13:59 |
Sent To |
|
|
Notes |
2013-10-28 17:24:37 | APPROVED WITH EXCEPTION | | | | THE PRODUCT APPROVAL SUBMITTED FOR THE FRENCH DOORS IS | | NOT IMPACT RATED. THE EGRESS DOOR CAN NOT BE SHUTTERED. | | SUBMIT PRODUCT APPROVALS WITH LARGE MISSILE IMPACT | | RATING FOR THE EGRESS DOOR. FOR THE OTHER DOORS SUBMIT | | 2 SETS OF PRODUCT APPROVALS FOR STORM PANELS WITH | | INSTALLATION SCHEDULES. | | | | THE PRODUCT APPROVAL FOR THE SANTEFE CLAY BARREL TILE | | ALLOWS TWO ATTACHMENT METHODS WITH ACCEPTABLE | | ATTACHMENT RESISTANCE. THEY ARE MORTAR OR 3M AH-160 | | ROOF TILE ADHESIVE. IF THE AH-160 ADHESIVE IS USED | | SUBMIT TWO SETS OF PRODUCT APPROVALS. | | | | CORRECT REDLINED MARK-UPS ON THE PLANS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2013-10-23 |
|
|
Cont ID |
|
Sent By |
RMCDOUGA |
Date |
2013-10-23 |
Time |
08:21 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-10-23 |
Time |
07:26 |
Sent To |
|
|
Notes |
2013-10-23 08:22:53 | AWAITING REST OF PLANS FROM ZONING. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2013-09-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-09-12 |
Time |
18:41 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-09-10 |
Time |
17:17 |
Sent To |
|
|
Notes |
2013-09-12 17:51:04 | 2010 FBC | | | | DENIED BY BUILDING | | | | 1) SUBMIT TWO COPIES OF THE EVALUATION REPORT FOR THE | | ICYNENE SPRAY FOAM INSULATION. FBCR 316.3 | | | | 2) THE ROOF PLAN ON SHEET A-3 SPECIFIES A POLYGLASS | | SELF ADHERED ROOF SYSTEM AND A BASE SHEET FASTENING. | | RAS 117 CALCULATIONS FOR A GAF MODIFIED ROOF SYSTEM ( | | NOA #09-0224.01 ) WERE SUBMITTED WITHOUT THE PRODUCT | | APPROVALS WHICH ARE REQUIRED BY DCA RULE 9N-3. IF THE | | GAF SYSTEM WILL BE INSTALLED REMOVE THE NOTES FOR THE | | POLYGLASS SYSTEM FROM THE ROOF PLAN AND SUBMIT THE GAF | | PRODUCT APPROVALS WITH THE APPROVED ASSEMBLY IDENTIFIED | | AND THAT HAVE BEEN REVIEWED AND APPROVED BY THE | | DESIGNER OF RECORD. | | | | 3) SUBMIT TWO COPIES OF PRODUCT APPROVALS THAT HAVE | | BEEN REVIEWED AND APPROVED BY THE DESIGNER OF RECORD | | FOR THE CEMENT PANEL SIDING, THE TRANSOM WINDOWS (AS | | SHOWN ON THE FLOOR PLANS ON A-1), THE STRUCTURAL WINDOW | | MULLIONS, BARREL TILE ROOFING AND THE FRONT ENTRY DOOR | | AS REQUIRED BY DCA RULE 9N-3 AND CITY AMENDMENT | | 107.3.4.1 | | | | 4) THERE ARE STILL CONFLICTING NOTES ON THE PLANS IN | | REGARDS TO THE CEMENT PANEL SIDING AND STUCCO OVER | | METAL LATH AND PLYWOOD. SEE FRONT ELEVATION ON A-1 AND | | SHEET A-3 AND CLOUDED NOTE ON RIGHT ELEVATION ON SHEET | | A-1. PLEASE CORRECT. CITY AMENDMENT 107.2.1.3 | | | | 5) PROVIDE STRUCTURAL DETAILS FOR THE PATIO ROOF ABOVE | | THE DOUBLE FRENCH DOORS. SPECIFY ALL CONNECTORS AND | | ATTACHMENTS REQUIRED TO PROVIDE SUPPORT AND A | | CONTINUOUS LOAD PATH. FBCR 301.1 AND 301.2.1 | | | | 6) SPECIFY THE CONNECTORS THAT WILL BE USED TO TIE ALL | | OF THE PARAPET FRAMING TOGETHER AND PROVIDE A | | CONTINUOUS LOAD PATH.FBCR 301.1 AND 301.2.1 | | | | 7) SPECIFY THE ATTACHMENT AND CONNECTORS THAT WILL BE | | USED TO ATTACH THE 2 X 4 ROOF RAFTER FRAMING TO THE | | CONTAINERS. FBCR 301.1 AND 301.2.1 | | | | 8) SHEET A-1 HAS WHITE-OUT CORRECTION FLUID ON THE | | RIGHT ELEVATION DETAIL. WHITE-OUT SHOULD NOT BE USED TO | | MAKE CORRECTIONS TO SIGNED AND SEALED DRAWINGS | | SUBMITTED FOR PUBLIC RECORD. FS 471 AND CITY AMENDMENTS | | 107.2.1.4 | | | | 9) THE DESIGN PRESSURES FOR THE FRONT DOOR ON SHEET A-1 | | WERE NOT CORRECTED AND ARE TOO HIGH. FBCR 301.2.1 AND | | TABLE 301.2(2). | | | | 10) PROVIDE A DETAIL THAT SPECIFIES THE ATTACHMENT OF | | THE GUARD RAIL AT THE BALCONY TO THE STRUCTURE. FBCR | | 301.1 | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2013-03-26 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-03-26 |
Time |
16:46 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-03-26 |
Time |
15:35 |
Sent To |
|
|
Notes |
2013-03-26 15:37:06 | 2010 FBC | | DENIED BY BUILDING | | | | 1) SUBMIT TWO SETS OF ENERGY CALCULATIONS FOR THE | | STRUCTURE. SHOW COMPLIANCE WITH FBC ENERGY CONSERVATION | | SECTION 401.2. | | | | 2) THE UPLIFT PRESSURE OF -75 PSF FOR ROOF ZONE 3 IN | | THE TABLE ON SHEET A-1 IS TOO LOW FOR A LOW SLOPE ROOF | | WITH A MEAN ROOF HEIGHT OF 20 FEET IN EXPOSURE C. SEE | | FBCR 301.2.1, TABLES R301.2(2) AND 301.2(3) . | | | | 3) THE WINDLOAD PRESSURES ON SHEET A-1 FOR WALL ZONE 5 | | (+ 67.3, -90.1 PSF) ARE TOO HIGH. TABLES R301.2(2) AND | | 301.2(3) . | | | | 4) SUBMIT TWO COPIES OF THE EVALUATION REPORT FOR THE | | ICYNENE SPRAY FOAM INSULATION. FBCR316.3 | | | | 5) THE NOTE ON A-1 FOR THE BALCONY GUARDRAIL PICKET | | SPACING IS FOR 2XS AT 6" O.C. THIS LEAVES AN OPENING OF | | 4-1/2". FBC R312.3 STATES THAT THE OPENINGS SHALL NOT | | ALLOW THE PASSAGE OF A 4 INCH DIAMETER SPHERE. | | | | 6) THERE IS A CONFLICT WITH THE STEEL COLUMN | | INFORMATION ON SHEET A-1. THE STEEL COLUMN DETAIL | | SPECIFIES A 3-1/2" X 3-1/2" X 1/4" STEEL COLUMN AND THE | | NOTE ON THE FRONT ELEVATION CALLS OUT A 4" X 4" X 1/2" | | STEEL COLUMN. PLEASE CLARIFY. CITY AMENDMENTS 107.2.1.3 | | | | 7) SUBMIT TWO COPIES OF THE PRODUCT APPROVALS FOR THE | | POLYGLASS SELF-ADHERED ROOFING SYSTEM SPECIFIED ON | | SHEET A-3 THAT HAS BEEN REVIEWED AND APPROVED BY THE | | DESIGNER OF RECORD FOR THIS PROJECT. INDICATE THE | | DESIGN PRESSURE OF THE SYSTEM THAT WILL BE INSTALLED | | AND SUBMIT RAS 117 CALCULATIONS FOR THE ENHANCED | | FASTENING REQUIREMENTS AT THE PERIMETER AND CORNER | | AREAS.DCA RULE 9N-3 AND FBCR 903.1 | | | | 8) SHOW COMPLIANCE WITH FBCR 318.6 FOR REQUIRED GUTTERS | | AND DOWNSPOUTS ON BUILDINGS WITH EAVES WITH LESS THAN 6 | | INCH PROJECTIONS. | | | | 9) SUBMIT TWO COPIES OF PRODUCT APPROVALS THAT HAVE | | BEEN REVIEWED AN APPROVED BY THE DESIGNER OF RECORD FOR | | THE HARDI-PLANK SIDING, THE ARCHED WINDOWS, THE FIXED | | GLASS WINDOWS, THE STRUCTURAL WINDOWS AND THE COMPOSITE | | DECKING AS REQUIRED BY DCA RULE 9N-3. | | | | 10) THERE IS CONFLICTING INFORMATION ON THE PLANS WITH | | REGARD TO THE ROOF PARAPET DESIGN. THE NOTES ON SHEET | | A-1 AND A-3 SPECIFY 5/8" PLYWOOD WITH METAL LATHE AND | | STUCCO. ON THE PARAPET DETAIL ON SHEET A-2, 4' X 8' | | HARDIE CEMENT BOARD PANEL SIDING IS SPECIFIED. PLEASE | | CLARIFY. CITY AMENDMENTS 107.2.1.3 | | | | 11) PROVIDE SPECIFICATIONS FOR THE PRE-FAB AWNING OR | | APPLY UNDER A SEPARATE PERMIT. R301.1 | | | | PLEASE PROVIDE A RESPONSE LETTER INDICATING HOW THE | | REVIEW COMMENTS HAVE BEEN ADDRESSED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2013-01-17 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-01-17 |
Time |
11:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-01-16 |
Time |
15:00 |
Sent To |
|
|
Notes |
2013-01-16 15:16:45 | 2010 FBC | | | | DENIED BY BUILDING | | | | 1) THE PLANS APPEAR TO SHOW TWO SEPARATE UNITS EACH | | WITH IT'S OWN KITCHEN. FBCR 302.3 REQUIRES ONE HOUR | | FIRE-RESISTANCE BETWEEN THE TWO UNITS. SHOW COMPLIANCE. | | | | 2) SUBMIT TWO SETS OF ENERGY CALCULATIONS FOR THE | | STRUCTURE. SHOW COMPLIANCE WITH FBC ENERGY CONSERVATION | | SECTION 401.2. | | | | 3) THE MEAN ROOF HEIGHT FOR THE STRUCTURE IS 20 FEET | | PER THE PLANS. PLEASE INCREASE THE OPENING PRESSURES TO | | CORRESPOND WITH THE 20 FT MRH. FBCR 301.2.1 | | | | 4) SHOW COMPLIANCE WITH FBC R318.1 FOR TERMITE | | PROTECTION. | | | | 5) SUBMIT TWO COPIES OF THE EVALUATION REPORT FOR THE | | ICYNENE SPRAY FOAM INSULATION. FBCR316.3 | | | | 6) PROVIDE A DETAIL SHOWING HOW THE FLOOR ASSEMBLY | | ABOVE THE COVERED ENTRY WILL BE INSULATED. FBC ENERGY | | CONSERVATION AND CITY AMENDMENTS 107.2.1 | | | | 7) THE NOA NUMBERS LISTED IN THE WINDOW AND DOOR | | SCHEDULES ON SHEET A-1 DO NOT MATCH THE ONES ON THE | | PRODUCT APPROVALS THAT WERE SUBMITTED. PLEASE CORRECT. | | CITY AMENDMENTS 107.2.1 AND DCA RULE 9N-3 | | | | 8) SPECIFY HOW THE BASE OF THE 4 X 4 POSTS SUPPORTING | | THE BALCONY WILL BE ANCHORED TO THE CONCRETE | | FOUNDATION. FBCR 301.1 | | | | 9) SPECIFY HOW THE BALCONY IS ATTACHED TO THE | | STRUCTURE. CITY AMENDMENTS 107.2.1.3 | | | | 10) THE FRONT ELEVATION ON A-1 SPECIFIES A 6 X 6 POST | | AT THE BALCONY. PLEASE CLARIFY. CITY AMENDMENTS 107.2.1 | | | | 11) SHOW THAT THE SPIRAL STAIRS COMPLY WITH FBCR | | 311.7.9.1. | | | | 12) THE TYPICAL FRAME DETAIL ON A-1 APPEARS TO SHOW | | THAT THE END OF THE SHIPPING CONTAINERS WHERE THE DOORS | | HAVE BEEN REMOVED WILL BE FRAMED WITH 2 X 2 X 1/4" | | STEEL. PLEASE CLARIFY. ALSO CLARIFY HOW THESE WILL BE | | WELDED TO THE STRUCTURE AND HOW THE CORRUGATED STEEL | | SKIN WILL BE ATTACHED TO THE FRAMING. PLEASE BE | | SPECIFIC. CITY AMENDMENTS 107.2.1 | | | | 13) PROVIDE COMPLETE DETAILS OF THE FRAMING AT THE | | WINDOW AND DOOR OPENINGS AT RIGHT AND LEFT ELEVATIONS. | | FBCR 301.1 AND CITY AMENDMENTS 107.2.1 | | | | 14) INDICATE THE TYPE OF ROOF COVERING THAT WILL BE | | USED AND SUBMIT PRODUCT APPROVALS FOR IT. FBCR 903.1 | | | | 15) INDICATE HOW THE PLUMBING VENT ROOF PENETRATIONS | | THROUGH THE CORRUGATED STEEL WILL BE FLASHED. FBCR | | 903.2 | | | | 16) SHOW COMPLIANCE WITH FBCR 318.6 FOR REQUIRED | | GUTTERS AND DOWNSPOUTS ON BUILDINGS WITH EAVES WITH | | LESS THAN 6 INCH PROJECTIONS. | | | | 17) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE | | HARDI-PLANK SIDING AND THE COMPOSITE DECKING AS | | REQUIRED BY DCA RULE 9N-3. | | | | 18) PROVIDE A STRUCTURAL ANALYSIS THAT INDICATES THE | | UPPER STORAGE CONTAINER CAN BE CANTILEVERED AS | | INDICATED ON THE PLANS. CITY AMENDMENTS 107.2.1.3 | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2013-10-23 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-10-23 |
Time |
07:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-10-23 |
Time |
07:53 |
Sent To |
|
|
Notes |
2013-10-23 07:54:17 | SEE RED-LINED PLANS |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2013-01-15 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2013-01-15 |
Time |
08:47 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2013-01-14 |
Time |
15:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
4 |
Status |
P |
Date |
2013-10-25 |
|
|
Cont ID |
|
Sent By |
FMITNER |
Date |
2013-10-25 |
Time |
15:13 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-10-25 |
Time |
15:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
3 |
Status |
F |
Date |
2013-08-08 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2013-08-08 |
Time |
13:18 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-08-08 |
Time |
13:18 |
Sent To |
|
|
Notes |
2013-08-08 13:21:32 | BACK TO R6 | 2013-08-08 13:20:39 | ELEVATIONS STILL SHOW HARDIE BOARD PANELS AND CONFLICT | | BETWEEN AWNING OR BARREL TILE OVERHANG. |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
2 |
Status |
F |
Date |
2013-04-04 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2013-04-04 |
Time |
09:06 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-04-04 |
Time |
09:06 |
Sent To |
|
|
Notes |
2013-04-04 09:07:44 | REQUIRES COA APPROVAL FROM HPB FOR NEW CONSTRUCTION. FM | | SPOKE TO NICK B. 4/4/13, WAS AWARE, E-MAILED | | APPLICATION. |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
F |
Date |
2013-01-30 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2013-01-30 |
Time |
10:48 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-01-30 |
Time |
10:48 |
Sent To |
|
|
Notes |
2013-01-30 10:49:54 | NEW CONSTRUCTION WITHIN AN HISTORIC DISTRICT REQUIRES | | APPROVAL BY THE HISTORIC PRESERVATION BOARD VIA A | | CERTIFICATE OF APPROPRIATENESS APPLICATION. QUESTIONS | | CONTACT FRIEDERIKE X1457. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2013-10-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-10-28 |
Time |
13:58 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-10-03 |
Time |
19:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2013-09-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-09-12 |
Time |
18:11 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-08-05 |
Time |
09:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2013-04-05 |
|
|
Cont ID |
|
Sent By |
mdekle |
Date |
2013-04-05 |
Time |
|
Rev Time |
0.00 |
Received By |
mdekle |
Date |
2013-03-21 |
Time |
10:29 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2013-02-02 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2013-01-30 |
Time |
11:00 |
Rev Time |
0.00 |
Received By |
lmartine |
Date |
2013-01-09 |
Time |
15:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
4 |
Status |
P |
Date |
2013-11-01 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-11-01 |
Time |
16:34 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-11-01 |
Time |
16:34 |
Sent To |
|
|
Notes |
2013-11-01 16:37:06 | MU-2013-22149 |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
3 |
Status |
F |
Date |
2013-10-23 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-10-23 |
Time |
06:41 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-10-23 |
Time |
06:40 |
Sent To |
|
|
Notes |
2013-10-23 06:41:45 | NEED A COPY OF THE PAID IMPACT FEE RECIEPT. |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
F |
Date |
2013-03-26 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-03-26 |
Time |
16:48 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-03-26 |
Time |
16:48 |
Sent To |
|
|
Notes |
2013-03-26 16:50:20 | AN IMPACT FEE REVIEW BY PALM BEACH COUNTY WILL BE | | REQUIRED. |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2013-01-16 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-01-16 |
Time |
13:20 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-01-16 |
Time |
13:20 |
Sent To |
|
|
Notes |
2013-01-16 13:21:45 | AN IMPACT FEE REVIEW BY PALM BEACH COUNTY IS REQUIRED. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
N |
Date |
2013-09-10 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-09-10 |
Time |
17:15 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-09-10 |
Time |
17:15 |
Sent To |
|
|
Notes |
2013-09-10 17:16:43 | A SEPARATE PERMIT, APPLICATION AND REVIEW IS REQUIRED | | FOR A MECHANICAL PERMIT. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2013-03-27 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-03-27 |
Time |
09:34 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-03-27 |
Time |
09:34 |
Sent To |
|
|
Notes |
2013-03-27 09:35:27 | 2010 FBCR MECHANICAL | | | | 1) SUBMIT TWO COPIES OF ENERGY CALCULATIONS PER 2010 | | FBC / ENERGY 401.2. | | | | 2) ALTHOUGH NO MECHANICAL PERMIT WAS APPLIED FOR AT | | THIS TIME, THE PLANS INDICATE TWO MINI-SPLIT A/C | | SYSTEMS. PLEASE SUBMIT TWO SETS OF EQUIPMENTS SIZING | | CALCULATIONS. TWO SETS OF MECHANICAL PLANS WITH | | EQUIPMENT SCHEDULES, SHOWING THE LOCATIONS OF THE AIR | | HANDLERS AND CONDENSING UNITS. OTHERWISE A SEPARATE | | MECHANICAL PERMIT, APPLICATION AND REVIEW OF THIS | | INFORMATION WILL BE REQUIRED. FBCR M1401.3 | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
N |
Date |
2013-01-10 |
|
|
Cont ID |
|
Sent By |
tgordon |
Date |
2013-01-10 |
Time |
11:04 |
Rev Time |
0.00 |
Received By |
tgordon |
Date |
2013-01-10 |
Time |
11:04 |
Sent To |
|
|
Notes |
2013-01-10 11:26:37 | *** NOTE *** | | | | 1) SUBMIT ENERGY CALCULATIONS FOR REVIEW, PER 2010 | | FBC/ENERGY 401.2. | | | | 2) NO MECHANICAL PERMIT APPLIED FOR AT THIS TIME. A | | MECHANICAL PERMIT WILL BE REQUIRED FOR THE BATHROOM | | EXHAUST FANS, PER 2010 FBC/R M1507. | | | | 3) PLEASE STATE ON BUILDING PLANS IF THE WALL MOUNTED | | A/C UNITS HAVE PLUGS OR ARE HARD WIRED, AS THEY MAY | | NEED A MECHANICAL PERMIT ALSO, PER 2010 FBC 107.3.5. | | | | MECHANICAL PLAN REVIEW BY: | | TOM GORDON (HY-BYRD INC.) (561) 805-6732 | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
P |
Date |
2013-10-23 |
|
|
Cont ID |
|
Sent By |
RMCDOUGA |
Date |
2013-10-23 |
Time |
07:26 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-10-23 |
Time |
07:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
F |
Date |
2013-09-10 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-09-10 |
Time |
16:52 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-09-10 |
Time |
15:41 |
Sent To |
|
|
Notes |
2013-09-10 17:04:15 | 2010 FBC | | | | DENIED BY PLUMBING | | | | 1) THE FIRST FLOOR SHOWER AND WATER CLOSET ARE NOT | | VENTED. FBCR P3101.2.1, P3105.1 AND P3108 | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2013-03-25 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-03-25 |
Time |
10:49 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-03-25 |
Time |
09:04 |
Sent To |
|
|
Notes |
2013-03-25 11:18:16 | 2010 FBC | | | | DENIED BY PLUMBING | | | | 1) PLUMBING RISER DIAGRAM DOES NOT MATCH FLOOR PLAN. | | THE DIAGRAM SHOWS A SINK ON THE SECOND FLOOR AND A | | DOUBLE LAVATORY AT THE FIRST FLOOR BATHROOM. PLEASE | | CORRECT. | | | | 2) THE BATHROOM GROUP ON THE LOWER FLOOR ARE NOT | | PROPERLY VENTED. THE VERTICAL WET VENT IS ONLY | | PERMITTED TO VENT A COMBINATION OF FIXTURES LOCATED ON | | THE SAME FLOOR LEVEL PER FBCR P3108.4. ALSO SEE P3109.2 | | A VERTICAL WASTE STACK VENT CAN NOT RECEIVE THE | | DISCHARGE OF WATER CLOSETS. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2013-01-15 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-01-15 |
Time |
15:07 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-01-15 |
Time |
15:07 |
Sent To |
|
|
Notes |
2013-01-15 15:59:52 | 2010 FBC | | | | DENIED BY PLUMBING | | | | 1) PLUMBING RISER DIAGRAM DOES NOT MATCH FLOOR PLAN. | | THE DIAGRAM SHOWS TWO LAVATORIES AND NO KITCHEN SINK ON | | THE LOWER FLOOR. PLEASE CORRECT. | | | | 2) THE FIXTURES ON THE LOWER FLOOR ARE NOT VENTED. THE | | VERTICAL WET VENT IS ONLY PERMITTED TO VENT A | | COMBINATION OF FIXTURES LOCATED ON THE SAME FLOOR LEVEL | | PER FBCR P3108.4. | | | | 3) THE KITCHEN SINK ON THE UPPER FLOOR CAN NOT TIE INTO | | THE VERTICAL WET VENT FOR THE BATHROOM GROUP. THE WATER | | CLOSET IS REQUIRED TO BE THE LOWEST CONNECTION TO THE | | VERTICAL WET-VENTED SECTION PER FBCR P3108.4. | | THEREFORE, THE HORIZONTAL BRANCH FOR THE KITCHEN SINK | | IS REQUIRED TO CONNECT TO THE VERTICAL DRAIN BELOW THE | | WATER CLOSET. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
P |
Date |
2013-10-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2013-10-28 |
Time |
18:40 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2013-10-28 |
Time |
18:35 |
Sent To |
|
|
Notes |
2013-10-28 18:39:51 | ROOFING PRODUCT APPROVALS SUBMITTED : | | CLAY TILE NOA NO. 12-0529.12 | | POLYGLASS UNDERLAYMENT NOA NO. 12-0713.02 | | POLYGLASS SELF-ADHERED ROOF SYSTEM NOA NO. 12-0815.07 | | GAF MODIFIED ROOF SYSTEM WITH RAS 117 CALCS. NOA NO. | | 09-0224.01 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2013-10-25 |
|
|
Cont ID |
|
Sent By |
FMITNER |
Date |
2013-10-25 |
Time |
15:13 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-10-25 |
Time |
15:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2013-08-08 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2013-08-08 |
Time |
13:17 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-08-08 |
Time |
13:17 |
Sent To |
|
|
Notes |
2013-08-08 13:18:23 | SEE NOTE FROM4/4/13....REQUIRES LANDSCAPE PLAN. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2013-04-04 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2013-04-04 |
Time |
09:08 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-04-04 |
Time |
09:08 |
Sent To |
|
|
Notes |
2013-04-04 09:08:28 | REQUIRES LANDSCAPE PLAN. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2013-01-30 |
|
|
Cont ID |
|
Sent By |
fmitter |
Date |
2013-01-30 |
Time |
10:50 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-01-30 |
Time |
10:50 |
Sent To |
|
|
Notes |
2013-01-30 10:51:10 | ONLY ONE UNIT ALLOWED ON SITE. QUESTIONS CONTACT | | FRIEDERIKE 822-1457. | 2013-01-16 09:34:28 | 1/15/13 |
|
|