Plan Review Details - Permit 12120578
Plan Review Stops For Permit 12120578
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date   Cont ID  
Sent By   Date 2013-01-25 Time   Rev Time 0.00
Received By tmoore Date 2013-01-25 Time 14:04 Sent To  
Notes
2013-01-25 14:10:22SPOKE WITH ALL-SITE OFFICE AGAIN TRYING TO GET THE
 SEWER LATERAL CAPPED, (3RD TIME)
 I WILL ISSUE THIS PERMIT WITH PROVISO THAT NO FINAL
 DEMO CAN BE ISSUED WITHOUT CAPPING THE LATERAL AND
 CALLING IN THE FINAL INSPECTIONS ON PERMITS
  
 PLUMB.#13010196 FINAL #703
 DEMO .#12120578 FINAL #104

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2013-01-18 Cont ID  
Sent By tmoore Date 2013-01-18 Time 09:26 Rev Time 0.00
Received By tmoore Date 2013-01-18 Time 09:22 Sent To ENG
Notes
2013-01-18 09:26:36HAVE ALL RELEASES NEEDED. SEWER LATERAL PERMIT PULLED
 BUT NOT FINALED YET. POLLUTION PREVENTION PLAN NOW IN
 APPLICATION, WILL PUT IN BOX FOR MANNY AND CALL HIM.
 LEFT MESSAGE ON ALL SITE'S VOICE MAIL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2012-12-20 Cont ID  
Sent By tmoore Date 2012-12-20 Time 09:29 Rev Time 0.00
Received By tmoore Date 2012-12-20 Time 09:26 Sent To  
Notes
2012-12-20 09:29:03CALLED CONTR. AND SPOKE TO STAFF. LET HER KNOW WE NEED
 1) GAS RELEASE CONFIRMATION, 2) ASBESTOS SURVEY, AND
 ABATEMENT IF NECESSARY, 3) SEWER LATERAL CAPPING PERMIT
 PULLED AND FINALED.
 PLAN PLACED IN ENGINEERING BOX FOR THEIR REVIEW. CALLED
 AND SPOKE TO MANNY.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2013-01-18 Cont ID  
Sent By Mgonzale Date 2014-01-18 Time   Rev Time 1.00
Received By mgonzale Date 2013-01-18 Time   Sent To B
Notes
2013-01-18 13:48:14POLLUTION PREVENTION PARAMETERS HAVE BEEN NOTED ON THE
 PLANS.
  
 CATCH BASIN PROTECTION.
 SILT FENCE AND SILF FENCE DETAIL.
  
 PPP BEST MANAGEMENT PRACTICES MUST BE IN PLACE PRIOR TO
 COMMENCING DEMO.
 THANK YOU FOR YOUR ATTENTION!
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2012-12-28 Cont ID  
Sent By Mgonzale Date 2012-12-28 Time   Rev Time 1.00
Received By mgonzale Date 2012-12-28 Time   Sent To I
Notes
2012-12-28 13:16:48REQUIRES A POLLUTION PREVENTION PLAN (SWPPP)
 AND/OR POLLUTION PREVENTION SUMMARY,
  
 DETAILS SHOULD ACCOMPANY THE PERMIT SUBMITTAL.
 HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE
 RING-STANDARDS/
 DETAIL PC1 (COULD YOU ALTERNATE SCREEN AT CATCH BASINS
 NEAR PINEWOOD.
 DETAIL PC4
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
  
 DIRECT: (561) 494-1085
  
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2012-12-19 Cont ID  
Sent By fmittner Date 2012-12-19 Time 10:34 Rev Time 0.00
Received By fmittner Date 2012-12-19 Time 10:34 Sent To  
Notes
***NONE***