2012-12-03 10:20:14 | ****CORRECTIONS**** |
| SAMANTHA HILL, BUILDING PLANS EXAMINER |
| 561-805-6724 [email protected] |
| FBC FLORIDA BUILDING CODE 2010 |
| FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL |
| |
| 1. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING |
| DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR |
| BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. |
| |
| SPEC SHEETS SUBMITTED STATE THAT GENERAL ASTM E90 |
| TESTING RESULTS WERE USED. CODE REQUIRES THAT THE |
| PRODUCT BE TESTED. |
| |
| 2. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN |
| DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC |
| OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN |
| IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN |
| 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH |
| ASTM E 492. |
| |
| SPEC SHEETS PROVIDE IIC RATINGS BASED ON ASTM E 2179 |
| 03, ASTM E 492 REQUIRED. |
| |
| AS DISCUSSED WITH CONTRACTOR, MANUFACTURER'S ACOUSTICAL |
| ENGINEER, AND MANUFACTURER'S REP, ALTERNATIVE MATERIALS |
| AND METHODS FBC 104.11 MAY BE REQUESTED: |
| |
| 104.11 ALTERNATIVE MATERIALS, DESIGN AND METHODS OF |
| CONSTRUCTION AND EQUIPMENT. THE |
| PROVISIONS OF THIS CODE ARE NOT INTENDED TO PREVENT THE |
| INSTALLATION OF ANY MATERIAL OR TO PROHIBIT |
| ANY DESIGN OR METHOD OF CONSTRUCTION NOT SPECIFICALLY |
| PRESCRIBED BY THIS CODE, PROVIDED THAT |
| ANY SUCH ALTERNAT IVE HAS BEEN APPROVED. AN ALTERNATIVE |
| MATERIAL, DESIGN OR METHOD OF |
| CONSTRUCTION SHALL BE APPROVED WHERE THE BUILDING |
| OFFICIAL FINDS THAT THE PROPOSED DESIGN IS |
| SATISFACTORY AND COMPLIES WITH THE INTENT OF THE |
| PROVISIONS OF THIS CODE, AND THAT THE MATERIAL, METHOD |
| OR WORK OFFERED IS, FOR THE PURPOSE INTENDED, AT LEAST |
| THE EQUIVALENT OF THAT PRESCRIBED IN THIS CODE IN |
| QUALITY, STRENGTH, EFFECTIVENESS, FIRE RESISTANCE, |
| DURABILITY AND SAFETY. WHEN ALTERNATE LIFE SAFETY |
| SYSTEMS ARE DESIGNED, THE SFPE ENGINEERING GUIDE TO |
| PERFORMANCE-BASED FIRE PROTECTION |
| ANALYSIS AND DESIGN OF BUILDINGS, OR OTHER METHODS |
| APPROVED BY THE BUILDING OFFICIAL MAY BE USED. |
| THE BUILDING OFFICIAL SHALL REQUIRE THAT SUFFICIENT |
| EVIDENCE OR PROOF BE SUBMITTED TO SUBSTANTIATE ANY |
| CLAIM MADE REGARDING THE ALTERNATIVE. |
| 104.11.1 RESEARCH REPORTS. SUPPORTING DATA, WHERE |
| NECESSARY TO ASSIST IN THE APPROVAL OF |
| MATERIALS OR ASSEMBLIES NOT SPECIFICALLY PROVIDED FOR |
| IN THIS CODE, SHALL CONSIST OF VALID |
| RESEARCH REPORTS FROM APPROVED SOURCES. |
| |
| 104.11.2 TESTS. WHENEVER THERE IS INSUFFICIENT EVIDENCE |
| OF COMPLIANCE WITH THE PROVISIONS OF |
| THIS CODE, OR EVIDENCE THAT A MATERIAL OR METHOD DOES |
| NOT CONFORM TO THE REQUIREMENTS OF THIS |
| CODE, OR IN ORDER TO SUBSTANTIATE CLAIMS FOR |
| ALTERNATIVE MATERIALS OR METHODS, THE BUILDING |
| OFFICIAL SHALL HAVE THE AUTHORITY TO REQUIRE TESTS AS |
| EVIDENCE OF COMPLIANCE TO BE MADE AT NO |
| EXPENSE TO THE JURISDICTION. TEST METHODS SHALL BE AS |
| SPECIFIED IN THIS CODE OR BY OTHER |
| RECOGNIZED TEST STANDARDS. IN THE ABSENCE OF RECOGNIZED |
| AND ACCEPTED TEST METHODS, THE |
| BUILDING OFFICIAL SHALL APPROVE THE TESTING PROCEDURES. |
| TESTS SHALL BE PERFORMED BY AN APPROVED |
| AGENCY. REPORTS OF SUCH TESTS SHALL BE RETAINED BY THE |
| BUILDING OFFICIAL FOR THE PERIOD REQUIRED |
| FOR RETENTION OF PUBLIC RECORDS. |
| |
| A POWER POINT PRESENTATION WAS SUBMITTED IN THE PAST. |
| THE POWER POINT HAD NO SUPPORTING DATA, ONLY A CLAIM |
| THAT THE PRODUCT MEETS THE CODE REQUIREMENTS. THIS IS |
| NOT SUFFICIENT DATA FOR ALTERNATIVE MATERIALS AND |
| METHODS TO BE GRANTED. |
| |