Plan Review Stops For Permit 12110270 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2013-02-19 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-02-19 |
Time |
14:19 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-02-19 |
Time |
14:19 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2013-02-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-02-11 |
Time |
15:18 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-02-11 |
Time |
15:18 |
Sent To |
|
|
Notes |
2013-02-11 15:26:05 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2010 | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | COMMENTS FROM PREVIOUS LIST, NOT ADDRESSED: | | | | 1. NOT CLEAR WHICH PRODUCT IS PROPOSED. NOA 12-0209.06 | | SUBMITTED, INSTALLATION SCHEDULE REFERS TO NOA | | 12-0209.07. THE FOLLOWING REVIEW COMMENTS ARE BASED ON | | THE NOA SUBMITTED, 12-0209.06. | | | | 2. SEE COLUMN: SHUTTER MOUNTING CONNECTION TYPE PER | | PRODUCT APPROVAL. THIS SHOULD CORRELATE WITH THE ANCHOR | | DETAILS ON SHEET 12 (FOR WOOD STRUCTURES). | | | | 4TH REVIEW, STATES LAG SCREWS. THIS IS THE FASTENER. | | PROVIDE CONNECTION TYPE PROPOSED; ALTERNATIVE 1 THROUGH | | ALTERNATIVE 8. PLEASE NOTE THAT 6" FASTENING APPEARS TO | | COMPLY FOR ALL CONNECTION TYPES BUT LAG SCREWS NOT THE | | CORRECT FASTENER FOR ALL CONNECTION TYPES. | | | | 3. OK. | | | | 4. IF NOA 12-0209.07 IS PROPOSED, PLEASE PROVIDE TWO | | SETS OF PRODUCT APPROVALS. IF NOA 12-0209.07 IS | | PROPOSED, REVISE INSTALLATION SCHEDULE AND RESUBMIT. | | | | NOT ADDRESSED. PLEASE CLARIFY WHICH PRODUCT IS TO BE | | INSTALLED. NOA #12-0209.06 SUBMITTED, BUT INSTALLATION | | SCHEDULE PROPOSES 12-0209.07. | | | | NEW COMMENT: | | | | PREVIOUS INSTALLATION SCHEDULES HAD FOUR OPENINGS, THIS | | ONE HAS TWO. PLEASE INCLUDE ALL OPENINGS OR OTHERWISE | | PROVIDE IMPACT PROTECTION FOR OPENINGS 1 AND 4 WHICH | | WERE NOT INCLUDED ON THE LATEST INSTALLATION SCHEDULE. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2013-01-23 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-01-23 |
Time |
15:19 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-01-23 |
Time |
15:19 |
Sent To |
|
|
Notes |
2013-01-23 15:23:40 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2010 | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | 1. NOT CLEAR WHICH PRODUCT IS PROPOSED. NOA 12-0209.06 | | SUBMITTED, INSTALLATION SCHEDULE REFERS TO NOA | | 12-0209.07. THE FOLLOWING REVIEW COMMENTS ARE BASED ON | | THE NOA SUBMITTED, 12-0209.06. | | | | 2. SEE COLUMN: SHUTTER MOUNTING CONNECTION TYPE PER | | PRODUCT APPROVAL. THIS SHOULD CORRELATE WITH THE ANCHOR | | DETAILS ON SHEET 12 (FOR WOOD STRUCTURES). | | | | 3. ANCHOR SPACING DOES NOT COMPLY WITH THE MAJORITY OF | | THE ANCHOR SPACING ON SHEET 12. | | | | 4. IF NOA 12-0209.07 IS PROPOSED, PLEASE PROVIDE TWO | | SETS OF PRODUCT APPROVALS. IF NOA 12-0209.07 IS | | PROPOSED, REVISE INSTALLATION SCHEDULE AND RESUBMIT. | | | | REVIEW FOR 12-0209.07 AND INSTALLATION SCHEDULE | | SUBMITTED HAS NOT BEEN DONE AS PRODUCT PROPOSED IS NOT | | CLEAR. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2012-12-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2012-12-20 |
Time |
11:24 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2012-12-20 |
Time |
11:24 |
Sent To |
|
|
Notes |
2012-12-20 11:28:39 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2010 | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | 1. FOR THE SHUTTERS, COMPLETE THE SAMPLE INSTALLATION | | SCHEDULE (AVAILABLE IN THE LOBBY AND AT HTTP://WWW.CITY | | OFWPB.COM/CONSTRUCTION/PDF/SCHEDULE_FOR_INSTALLATION.PD | | F) OR PROVIDE ALL INFORMATION IN AN ALTERNATE FORMAT. | | | | 2ND REVIEW, THE FOLLOWING INFORMATION IS REQUIRED: | | | | SHUTTER MOUNTING CONNECTION TYPE | | SHUTTER GLASS SEPARATION | | SHUTTER SPAN | | SHUTTER INSTALLED VERT/HORIZONTAL | | EDGE DISTANCE | | SUBSTRATE | | | | THIS CANNOT BE REDLINED FOR YOU AS JOB CONDITIONS WILL | | DETERMINE SHUTTER CONNECTION MOUNTING TYPE (THIS SHOULD | | CORRELATE WITH ANCHOR SCHEDULES, FOR EXAMPLE 1 TOP, | | THROUGH 11 BOTTOM, AND EITHER CONNECTION CAN BE USED ON | | HORIZONTAL APPLICATIONS). | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2012-12-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2012-12-03 |
Time |
07:48 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2012-12-03 |
Time |
07:48 |
Sent To |
|
|
Notes |
2012-12-03 07:49:37 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2010 | | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL | | | | 1. FOR THE SHUTTERS, COMPLETE THE SAMPLE INSTALLATION | | SCHEDULE (AVAILABLE IN THE LOBBY AND AT HTTP://WWW.CITY | | OFWPB.COM/CONSTRUCTION/PDF/SCHEDULE_FOR_INSTALLATION.PD | | F) OR PROVIDE ALL INFORMATION IN AN ALTERNATE FORMAT. | | | | |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
2 |
Status |
P |
Date |
2013-02-20 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2013-02-20 |
Time |
14:29 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2013-02-20 |
Time |
|
Sent To |
I |
|
Notes |
2013-02-20 09:12:09 | GAVE TO F.M. - MD |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2012-11-27 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2012-11-27 |
Time |
08:55 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2012-11-27 |
Time |
08:55 |
Sent To |
|
|
Notes |
2012-11-08 16:43:34 | FM MET WITH AHTTIE (CONTRACTOR) EXPLAINED ADDITIONAL | | INFORMATION IS REQUIRED. SHE WILL SUBMIT ASAP. PERMIT | | APPLICATION BEING HELD IN HISTORIC. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2013-02-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-02-20 |
Time |
18:30 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-02-15 |
Time |
09:58 |
Sent To |
|
|
Notes |
2013-02-19 14:19:52 | 2/19 TO ZONING BOX FOR HISTORIC REVIEW | | NEW SHUTTER PRODUCT APPROVALS AND FLOOR PLAN TO BE | | STAMPED | | | 2013-02-15 10:05:24 | GAVE TO SAMANTHA |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2013-02-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-02-11 |
Time |
15:26 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-01-29 |
Time |
17:12 |
Sent To |
|
|
Notes |
2013-01-29 17:12:31 | GAVE TO SAMANTHA |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2013-01-23 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2013-01-23 |
Time |
15:37 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2013-01-10 |
Time |
08:13 |
Sent To |
|
|
Notes |
2013-01-10 08:14:01 | SENT TO S HILL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2012-12-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2012-12-20 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2012-12-11 |
Time |
11:03 |
Sent To |
|
|
Notes |
2012-12-12 11:03:44 | SENT TO S HILL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2012-12-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2012-12-03 |
Time |
07:50 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2012-12-03 |
Time |
07:49 |
Sent To |
|
|
Notes |
|
|