Plan Review Details - Permit 12040352
Plan Review Stops For Permit 12040352
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2012-05-01 Cont ID  
Sent By shill Date 2012-05-01 Time 10:36 Rev Time 0.00
Received By shill Date 2012-05-01 Time 10:36 Sent To  
Notes
2012-05-01 10:36:44PROVISO - SEPARATE PERMIT FOR SHUTTER
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2012-04-23 Cont ID  
Sent By shill Date 2012-04-23 Time 15:40 Rev Time 0.00
Received By shill Date 2012-04-23 Time 15:40 Sent To  
Notes
2012-04-23 15:46:55****CORRECTIONS****
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
 FBC FLORIDA BUILDING CODE 2010
 FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL
  
 COURTESY REVIEW IN RESPONSE TO EMAIL:
  
 1. REGARDING THE SHUTTER INSTALLATION, CONTRACTOR MAY
 PROVIDE A COMPLETED AND NOTARIZED APPLICATION FOR THE
 SHUTTER CONTRACTOR. THIS WILL BE ASSIGNED AS A SUB
 PERMIT (NO FEE) IF DONE PRIOR TO PERMIT ISSUANCE. THIS
 CAN BE PROVIDED AT TIME OF PERMIT PICKUP, FS489.
  
 2. SHEET 10 OF THE MULLION NOA, SELECT ANCHOR. IT
 APPEARS THAT ANCHOR CAPACITY REQUIRED IS 903. SPECIFIC
 ANCHOR, EDGE DISTANCE, AND EMBEDMENT INFORMATION
 REQUIRED TO DETERMINE CODE COMPLIANCE, FBC1609.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2012-04-20 Cont ID  
Sent By shill Date 2012-04-20 Time 13:31 Rev Time 0.00
Received By shill Date 2012-04-20 Time 13:30 Sent To  
Notes
2012-04-20 13:58:05****CORRECTIONS****
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
 FBC FLORIDA BUILDING CODE 2010
 FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL
  
  
 1. FOR THE SHUTTER, COMPLETE THE SAMPLE INSTALLATION
 SCHEDULE OR PROVIDE ALL INFORMATION TO SHOW CODE
 COMPLIANCE IN ANOTHER FORMAT, FBC*106, FBC R301,
 FBC1609. TWO SETS REQUIRED. THIS FORM IS AVAILABLE IN
 THE LOBBY OR ON THE INTERNET AT
 HTTP://WWW.CITYOFWPB.COM/CONSTRUCTION/PDF/SCHEDULE_FOR_
 INSTALLATION.PDF
  
 2. SHUTTER INSTALLATION IS NOT WITHIN THE SCOPE OF THIS
 SPECIALTY LICENSE. THIS WORK MUST BE SUBCONTRACTED.
  
 3. SHUTTER PRODUCT APPROVAL HAS A "PENDING" STATUS;
 PLEASE PRINT CURRENT COVER SHEET IF APPROVED AT THIS
 TIME. OTHERWISE, A VALID CURRENT FLORIDA STATE OR LOCAL
 PRODUCT APPROVAL IS REQUIRED.
  
 4. PROPOSED MULLION INSTALLATION NOT CLEAR. TWO
 DIFFERENT LENGTHS ARE CIRCLED ON SHEET 7, AND ONE ON
 SHEET 8, BUT IT APPEARS THAT ONLY ONE SIZE IS TO BE
 INSTALLED, 63", AND THIS SIZE IS NOT CIRCLED. PROVIDE
 CALCULATION (ANCHOR CAPACITY ADJUSTMENT FORMULA) ADVISE
 WHICH OPTIONS (MULLION TYPE, ANCHOR, SUBSTRATE) ARE
 PROPOSED.
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2012-05-01 Cont ID  
Sent By shill Date 2012-05-01 Time 10:36 Rev Time 0.00
Received By shill Date 2012-04-25 Time 14:53 Sent To  
Notes
2012-04-25 14:53:56TO SH DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2012-04-20 Cont ID  
Sent By shill Date 2012-04-20 Time 13:58 Rev Time 0.00
Received By shill Date 2012-04-12 Time 11:06 Sent To  
Notes
2012-04-13 11:06:54INCOMING SENT TO MISC BOX # 1. JW