Plan Review Details - Permit 11070530
Plan Review Stops For Permit 11070530 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2011-08-05 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-08-05 |
Time |
08:58 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-08-05 |
Time |
08:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2011-08-02 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-08-02 |
Time |
13:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-08-02 |
Time |
13:45 |
Sent To |
|
|
Notes |
2011-08-02 13:50:24 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2007 | | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL | | | | 1. DESIGN PRESSURE OF -46.3 REQUIRES USE OF THE -57 | | ROW, SEE SHEET 7 OF THE PRODUCT APPROVAL. C3 REQUIRES | | 4.6" SPACING ON ALL OPENINGS OVER 6' AT THE BOTTOM, NOT | | ONLY OPENING 1. IT IS NOT CLEAR WHY OPENING 1 WAS | | CHANGED BUT NOT THE OTHER OPENINGS. | | | | 2. AS PREVIOUSLY DISCUSSED, THE PRODUCT APPROVAL IS | | HIGHLIGHTED FOR A DESIGN PRESSURE OF -73PSF. IF YOU ARE | | NOT DESIGNING TO -73PSF, PLEASE SUBMIT TWO NEW PRODUCT | | APPROVALS. TWO COMPLETE SETS OF PLANS FOR PERMIT | | ISSUANCE REQUIRED. | | | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2011-07-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-07-25 |
Time |
08:25 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-07-25 |
Time |
08:25 |
Sent To |
|
|
Notes |
2011-07-25 08:43:02 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2007 | | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL | | | | 1. TWO DIFFERENT SUBSTRATES CIRCLED. CBS CONSTRUCTION | | IS TYPICALLY CONCRETE TOP SUBSTRATE, MASONRY (USE | | HOLLOW BLOCK CHART) ON THE BOTTOM. | | | | 2. SPANS NOT CORRECT. IF THE INTENTION WAS TO SHOW | | WORST CASE, SEE OPENING 6, AND REVISE (IT APPEARS THAT | | THIS SHOULD BE 8'3" AT A MINIMUM, NOT 8'). | | | | 3. TWO COMPLETE SETS OF PERMIT DOCUMENTS REQUIRED. IF | | THIS IS NOT PROVIDED, APPLICABLE ADMIN AND COPY FEES | | WILL BE ADDED TO PERMIT. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2011-07-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-07-25 |
Time |
08:43 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-07-22 |
Time |
08:03 |
Sent To |
|
|
Notes |
2011-07-22 08:03:21 | BLDG < $5K |
|
|
|