|
 |
 |
 |
 |
 |
Plan Review Details - Permit 11040504
Plan Review Stops For Permit 11040504 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2011-05-18 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-05-18 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-05-18 |
Time |
13:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2011-05-05 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-05-05 |
Time |
17:26 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-05-05 |
Time |
17:26 |
Sent To |
|
|
Notes |
2011-05-05 17:27:55 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2007 | | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL | | | | | | 1. PLEASE CLARIFY SUBSTRATE. CONNECTION TYPE A IS | | PROPOSED FOR TOP, WHICH REQUIRES A CONCRETE SUBSTRATE, | | SEE SHEET 13 OF PRODUCT APPROVAL EVALUATION REPORT. | | "CONC BLOCK" IS SPECIFIED ON THE INSTALLATION SCHEDULE; | | DOES THIS MEAN CONCRETE ON TOP AND BLOCK ON THE BOTTOM, | | OR CONCRETE BLOCK ON TOP AND BOTTOM? | | | | 2ND REVIEW, CONTRACTOR REVISED SUBSTRATE TO CONCRETE | | BLOCK TOP AND BOTTOM. SEE PRODUCT APPROVAL, SHEET 13, | | CONNECTION TYPE A REQUIRES A CONCRETE SUBSTRATE. PLEASE | | REVISE EITHER CONNECTION TYPE OR SUBSTRATE. | | | | 2. SEE CHART ON SHEET 13. 10" ANCHOR SPACING FOR | | CONNECTION TYPE D PROPOSED DOES NOT COMPLY WITH THE | | PRODUCT APPROVAL. | | | | TOP ANCHOR SPACING WILL BE REVIEWED AFTER ISSUE #1 IS | | RESOLVED. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2011-04-27 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-04-27 |
Time |
10:30 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-04-19 |
Time |
15:59 |
Sent To |
|
|
Notes |
2011-04-27 10:33:40 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2007 | | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL | | | | 1. PLEASE CLARIFY SUBSTRATE. CONNECTION TYPE A IS | | PROPOSED FOR TOP, WHICH REQUIRES A CONCRETE SUBSTRATE, | | SEE SHEET 13 OF PRODUCT APPROVAL EVALUATION REPORT. | | "CONC BLOCK" IS SPECIFIED ON THE INSTALLATION SCHEDULE; | | DOES THIS MEAN CONCRETE ON TOP AND BLOCK ON THE BOTTOM, | | OR CONCRETE BLOCK ON TOP AND BOTTOM? | | | | 2. NO ANCHOR SPACING SPECIFIED. PLEASE COMPLETE THE | | INSTALLATION SCHEDULE. | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2011-05-05 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-05-05 |
Time |
17:28 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-05-02 |
Time |
08:45 |
Sent To |
|
|
Notes |
2011-05-02 08:45:49 | SENT TO SAMANTHA'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2011-05-05 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2011-04-27 |
Time |
17:25 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2011-04-19 |
Time |
15:59 |
Sent To |
|
|
Notes |
2011-04-19 16:00:04 | INCOMING SENT TO MISC BOX #1. JW |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |