2011-07-08 14:17:25BUILDING PROVISO
  
 1) SUBMIT TWO SETS OF WALL DETAILS THAT SPECIFY THE
 FILE NUMBER OR DESIGN NUMBER OF THE ONE HOUR FIRE-RATED
 SEPARATION WALL BETWEEN THE TWO UNITS. ANSI/UL 263 IS
 THE TEST METHOD AND ACCEPTANCE CRITERIA.
  
 2) SUBMIT TWO SETS OF CORRECTED ENERGY CALCULATIONS.
 THE ONES THAT WERE SUBMITTED ARE INCORRECT. THE NUMBER
 OF WINDOWS AND DOORS IN EACH UNIT ARE INCORRECT. THE
 PLANS SHOW A GABLE ROOF NOT A HIP. THIS COMMENT WAS
 UNDER MECHANICAL REVIEW IN THE FIRST REVIEW. THE FORM
 DOES NOT SPECIFY TWO UNITS. THE COMMON WALL BETWEEN THE
 TWO UNITS IS NOT LISTED ON THE FORM. THERE ARE ONLY TWO
 DOORS AND THE FORM LISTS THREE. THE FORM ONLY LISTS 8
 WINDOWS AND THE ELEVATION PLANS SHOW 14.
  
 3) THE PRODUCT APPROVALS THAT WERE SUBMITTED ARE FOR
 NON-IMPACT RATED WINDOWS. IMPACT PROTECTION IS REQUIRED
 BY FBC R301.2.1.2 AND FBC EXISTING BUILDING 606.4.
 UNLESS THERE ARE EXISTING STORM PANELS, SUBMIT TWO
 COPIES OF PRODUCT APPROVALS AND AN INSTALLATION
 SCHEDULE FOR THE STORM PANELS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2011-06-15 Cont ID  
Sent By rmcdouga Date 2011-06-15 Time 16:47 Rev Time 0.00
Received By rmcdouga Date 2011-06-15 Time 16:47 Sent To  
Notes
2011-06-15 17:06:202007 FBC W/2009 REVISIONS
  
 DENIED BY BUILDING
  
 1) SPECIFY THE FILE NUMBER OR DESIGN NUMBER OF THE ONE
 HOUR FIRE-RATED SEPARATION WALL BETWEEN THE TWO UNITS.
 ANSI/UL 263 IS THE TEST METHOD AND ACCEPTANCE CRITERIA.
  
 2) THE ENERGY CALCULATIONS ARE INCORRECT. THE NUMBER OF
 WINDOWS AND DOORS IN EACH UNIT ARE INCORRECT. THE PLANS
 SHOW A GABLE ROOF NOT A HIP. THIS COMMENT WAS UNDER
 MECHANICAL REVIEW IN THE FIRST REVIEW. THE FORM DOES
 NOT SPECIFY TWO UNITS. THE COMMON WALL BETWEEN THE TWO
 UNITS IS NOT LISTED ON THE FORM. THERE ARE ONLY TWO
 DOORS AND THE FORM LISTS THREE. THE FORM ONLY LISTS 8
 WINDOWS AND THE ELEVATION PLANS SHOW 14. PLEASE
 CORRECT.
  
 3) THE PRODUCT APPROVALS THAT WERE SUBMITTED ARE FOR
 NON-IMPACT RATED WINDOWS. IMPACT PROTECTION IS REQUIRED
 BY FBC R301.2.1.2 AND FBC EXISTING BUILDING 606.4.
 UNLESS THERE ARE EXISTING STORM PANELS, SUBMIT TWO
 COPIES OF PRODUCT APPROVALS AND AN INSTALLATION
 SCHEDULE FOR THE STORM PANELS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2011-05-13 Cont ID  
Sent By rmcdouga Date 2011-05-13 Time 16:05 Rev Time 0.00
Received By rmcdouga Date 2011-04-25 Time 12:01 Sent To  
Notes
2011-05-13 16:05:042007 FBC W/2009 REVISIONS
  
 DENIED BY BUILDING
  
 1) SUBMIT DETAIL OF THE ONE HOUR FIRE-RATED SEPARATION
 WALL INCLUDE THE FILE NUMBER FOR THE TESTED ASSEMBLY
 BEING USED. SHOW COMPLIANCE WITH FBC R317.1 WHICH
 REQUIRES THE WALL TO EXTEND TO THE UNDERSIDE OF THE
 ROOF SHEATHING.
  
 2) THE STRUCTURE IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA "A-9" BFE 13'. ALL NEW EQUIPMENT SERVICING THE
 DWELLINGS WILL BE REQUIRED TO BE 6" ABOVE THE BASE
 FLOOD ELEVATION WHICH IS A MINIMUM OF 13'-6".
  
 3) THE PLANS HAVE AN AREA TABULATION THAT INDICATE 3
 UNITS AND THERE ARE ONLY 2 UNITS SHOWN. TO AVOID
 CONFUSION PLEASE REVISE. NOTE: PERMIT #09080470 TO
 CONVERT THIS STRUCTURE FROM 3 UNITS TO 2 WAS ISSUED AND
 NEVER COMPLETED.
  
 4) THERE WAS WORK DONE UNDER EXPIRED PERMIT # 09080470
 THAT WAS NOT INSPECTED. THESE ISSUES WILL NEED TO BE
 ADDRESSED BEFORE A NEW PERMIT CAN BE ISSUED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2011-07-08 Cont ID  
Sent By rmcdouga Date 2011-07-08 Time 15:14 Rev Time 0.00
Received By rmcdouga Date 2011-07-08 Time 15:14 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2011-04-25 Cont ID  
Sent By rlecky Date 2011-04-25 Time 14:02 Rev Time 0.00
Received By rlecky Date 2011-04-25 Time 12:01 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2011-07-07 Cont ID  
Sent By mgonzale Date 2011-07-07 Time   Rev Time 1.00
Received By mgonzale Date 2011-07-07 Time   Sent To  
Notes
2011-07-07 17:41:45PASSED:
  
 NO CONFLICT WITH CITY OF WPB PUBLIC UTILITIES.
  
 MANUEL JULIAN GONZALEZ
 CSD ENGINEERING REVIEW
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2011-06-14 Cont ID  
Sent By mgonzale Date 2011-06-14 Time   Rev Time 0.25
Received By mgonzale Date 2011-06-14 Time   Sent To  
Notes
2011-06-14 15:54:56PASSED
  
 NO CONFLICTS WITH CITY OF WEST PALM BEACH PUBLIC
 UTILITIES.
  
 MANUEL JULIAN GONZALEZ
 CSD ENGINEERING REVIEW
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2011-07-08 Cont ID  
Sent By rmcdouga Date 2011-07-08 Time 13:59 Rev Time 0.00
Received By rmcdouga Date 2011-06-23 Time 16:55 Sent To  
Notes
2011-07-08 13:46:207/8/11 ROUTED TO RM DESK
2011-06-24 07:24:44RESUB WAS COMBINED WITH THE PREVIOUSLY DENIED PLANS AND
 SENT TO ZONING. THE BUILDING ISSUES WILL BE ADDRESSED
 BY PROVISO AFTER ZONING HAS GIVEN APPROVAL. RM
  
  
2011-06-23 16:56:25INCOMING SENT TO MCDOUGALS DESK. JW

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2011-06-15 Cont ID  
Sent By rmcdouga Date 2011-06-15 Time 16:47 Rev Time 0.00
Received By rmcdouga Date 2011-06-07 Time 08:59 Sent To  
Notes
2011-06-07 08:59:40IN ZONING BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2011-05-13 Cont ID  
Sent By rmcdouga Date 2011-05-13 Time 16:05 Rev Time 0.00
Received By rmcdouga Date 2011-04-12 Time 11:22 Sent To  
Notes
2011-04-12 11:22:57R23
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2011-06-15 Cont ID  
Sent By rmcdouga Date 2011-06-15 Time 16:47 Rev Time 0.00
Received By rmcdouga Date 2011-06-15 Time 16:47 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2011-05-13 Cont ID  
Sent By rmcdouga Date 2011-05-13 Time 15:08 Rev Time 0.00
Received By rmcdouga Date 2011-05-13 Time 15:08 Sent To  
Notes
2011-05-13 15:33:482007 FBC W/2009 REVISIONS
  
 DENIED BY MECHANICAL
  
 1) THE SPECIFY THE DUCT SIZES, GRILL SIZES AND CFMS FOR
 EACH DROP FOR THE A/C SUPPLIES FOR UNIT B. CITY
 AMENDMENTS 106.3.5.4
  
 2) THE ENERGY CALCULATIONS ARE INCORRECT. THE NUMBER OF
 WINDOWS AND DOORS IN EACH UNIT ARE INCORRECT. THE PLANS
 SHOW A GABLE ROOF NOT A HIP. THE EXTERIOR WALLS ARE
 INCORRECT. THE ENERGY FORM SPECIFIES THE COOLING
 SYSTEMS AS 14 SEER AND ONE OF THE UNITS IS SPECIFIED AS
 13 SEER ON THE MECHANICAL PLAN. FBC 13-101.2.3 PLEASE
 CORRECT.
  
 3) THE EQUIPMENT SIZING CALCULATIONS DO NOT MATCH THE
 SPECIFIED EQUIPMENT. FBCR M1401.3
  
 4) THE STRUCTURE IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA "A-9" BFE 13'. ALL NEW EQUIPMENT SERVICING THE
 DWELLINGS WILL BE REQUIRED TO BE 6" ABOVE THE BASE
 FLOOD ELEVATION WHICH IS A MINIMUM OF 13'-6".
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop P PLUMBING
Rev No 2 Status P Date 2011-06-15 Cont ID  
Sent By rmcdouga Date 2011-06-15 Time 16:46 Rev Time 0.00
Received By rmcdouga Date 2011-06-15 Time 16:46 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2011-05-13 Cont ID  
Sent By rmcdouga Date 2011-05-13 Time 14:49 Rev Time 0.00
Received By rmcdouga Date 2011-05-13 Time 12:12 Sent To  
Notes
2011-05-13 15:08:412007 FBC W/2009 REVISIONS
  
 DENIED BY PLUMBING
  
 1) SUBMIT 2 COPIES OF A PLUMBING SANITARY ISOMETRIC
 RISER DIAGRAM.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop Z ZONING
Rev No 3 Status P Date 2011-07-07 Cont ID  
Sent By lfranco Date 2011-07-07 Time 17:59 Rev Time 1.00
Received By lfranco Date 2011-06-28 Time 14:48 Sent To ENG
Notes
2011-07-07 18:01:18PLANNING AND ZONING: **** PASSED *****
  
  
 1. RESPOND TO COMMENTS IN WRITING.
  
 2. THIS PROPERTY IS ZONED SF14 AND WAS PREVIOUSLY
 APPROVED FOR TWO UNITS. THREE UNITS WILL NOT BE
 ALLOWED. SEE COMMENTS BELOW.
 RESUBMITTAL: COMMENT ADDRESSED
  
 3. PURSUANT TO SECTION 94-303 OF THE ZONING AND LAND
 DEVELOPMENT REGULATIONS ("ZLDR"): PARKING: ONE (1)
 PARKING SPACE SHALL BE PROVIDED FOR THE APARTMENT AND
 TWO (2) FOR THE PRINCIPAL STRUCTURE ON SITE. SEE
 COMMENT #4 FOR ADDITIONAL REQUIREMENTS.
  
 4. PURSUANT TO SECTION 94-482 OF THE ZLDR: REQUIRED
 OFF-STREET PARKING SPACES FOR LESS THAN FOUR
 RESIDENTIAL DWELLING UNITS SHALL BE LOCATED ON THE
 PROPERTY ON WHICH THE UNITS ARE CONSTRUCTED. REQUIRED
 PARKING MAY BE LOCATED IN A FRONT YARD; HOWEVER, THE
 LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT
 YARD AREA MUST BE LANDSCAPED. PARKING AREAS LOCATED IN
 THE FRONT YARD SHALL BE SURFACED WITH A SMOOTH,
 NON-DUSTING SURFACE IN COMPLIANCE WITH SUBSECTION
 33-485(E). IT SHALL BE A VIOLATION OF THIS CHAPTER TO
 PARK ON ANY UNPAVED AREAS AS DESCRIBED IN THIS ARTICLE.
 RESPONSE TO RE-SUBMITTAL: SEE COMMENT #5.
  
 5. PURSUANT TO SECTION 94-313. VEHICULAR ACCESS TO
 STREETS. ONLY ONE (1) ACCESS POINT IS ALLOWED FOR
 RESIDENTIAL DEVELOPMENTS LESS THAN 75 UNITS. THE SITE
 PLAN (SP-1) AND SURVEY SHOW TWO (2) EXISTING
 APPROACHES. THE SOUTHEAST APPROACH DOES NOT HAVE A
 DRIVE WAY; PROVIDE PROOF THAT A PERMIT FOR THE ROW
 APPROACH WAS APPROVED BY THE ENGINEERING DEPARTMENT.
 REGARDLESS OF THE PERMIT, ONLY ONE (1) ACCESS POINT IS
 ALLOWED FOR THIS PROPERTY. COORDINATE WHICH APPROACH
 WILL BE KEPT AND HOW THE VEHICULAR MANEUVERING AND
 PARKING WILL BE PROVIDED ON THE PROPERTY TO MEET
 COMMENT #2.
  
 (1) NUMBER OF ACCESS POINTS.
 A. ALL PROJECTS SHALL HAVE ACCESS TO A PUBLIC
 RIGHT-OF-WAY. THE NUMBER OF ACCESS POINTS SHALL BE AS
 FOLLOWS:
 TABLE INSET:
  
 TYPE OF DEVELOPMENT NUMBER OF ACCESS POINTS PREFERRED
 TYPE OF ACCESS
 RESIDENTIAL, < 75 UNITS 1 RESIDENTIAL OR MINOR
 COLLECTOR
  
 RESUBMITTAL: ONLY ONE ACCESS POINT/APPROACH OF A
 MAXIMUM OF 20' WIDE WILL BE ALLOWED. A U-DRIVE MAY ALSO
 BE PERMITTED PER PENDING CODE AMENDMENT, THE TWO (2)
 ACCESS POINTS HAVE TO BE A MAXIMUM OF 10 FEET EACH.
 HOWEVER, COMMENT NUMBER #4 NEEDS TO BE COMPLIED WITH
 (I.E. 25 FEET DEPTH X 100' WIDTH OF PROPERTY = 2500 SQ.
 FT. X .75 (75%) = 1875 SQ.FT. OF AREA TO BE LANDSCAPING
 (PERVIOUS AREA). SINCE THE SQ. FTG. IS MORE THAN 1,000
 SQ. FT. THEN 1,000 SQ. FT. WILL BE THE MINIMUM REQUIRED
 LANDSCAPED AREA FOR THE FRONT PROPERTY AREA.
 SHOW CALCULATIONS ON SURVEY AND/OR PLANS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ME.
  
 LINDA MIA FRANCO
 SENIOR PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: (561) 822-1443
 EMAIL: [email protected]
  

Review Stop Z ZONING
Rev No 2 Status F Date 2011-06-09 Cont ID  
Sent By lfranco Date 2011-06-09 Time 18:28 Rev Time 1.00
Received By lfranco Date 2011-06-07 Time 18:20 Sent To  
Notes
2011-06-09 18:38:11PLANNING AND ZONING: **** FAILED *****
  
  
 1. RESPOND TO COMMENTS IN WRITING.
  
 2. THIS PROPERTY IS ZONED SF14 AND WAS PREVIOUSLY
 APPROVED FOR TWO UNITS. THREE UNITS WILL NOT BE
 ALLOWED. SEE COMMENTS BELOW.
 RESUBMITTAL: COMMENT ADDRESSED
  
 3. PURSUANT TO SECTION 94-303 OF THE ZONING AND LAND
 DEVELOPMENT REGULATIONS ("ZLDR"): PARKING: ONE (1)
 PARKING SPACE SHALL BE PROVIDED FOR THE APARTMENT AND
 TWO (2) FOR THE PRINCIPAL STRUCTURE ON SITE. SEE
 COMMENT #4 FOR ADDITIONAL REQUIREMENTS.
  
 4. PURSUANT TO SECTION 94-482 OF THE ZLDR: REQUIRED
 OFF-STREET PARKING SPACES FOR LESS THAN FOUR
 RESIDENTIAL DWELLING UNITS SHALL BE LOCATED ON THE
 PROPERTY ON WHICH THE UNITS ARE CONSTRUCTED. REQUIRED
 PARKING MAY BE LOCATED IN A FRONT YARD; HOWEVER, THE
 LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT
 YARD AREA MUST BE LANDSCAPED. PARKING AREAS LOCATED IN
 THE FRONT YARD SHALL BE SURFACED WITH A SMOOTH,
 NON-DUSTING SURFACE IN COMPLIANCE WITH SUBSECTION
 33-485(E). IT SHALL BE A VIOLATION OF THIS CHAPTER TO
 PARK ON ANY UNPAVED AREAS AS DESCRIBED IN THIS ARTICLE.
 RESPONSE TO RE-SUBMITTAL: SEE COMMENT #5.
  
 5. PURSUANT TO SECTION 94-313. VEHICULAR ACCESS TO
 STREETS. ONLY ONE (1) ACCESS POINT IS ALLOWED FOR
 RESIDENTIAL DEVELOPMENTS LESS THAN 75 UNITS. THE SITE
 PLAN (SP-1) AND SURVEY SHOW TWO (2) EXISTING
 APPROACHES. THE SOUTHEAST APPROACH DOES NOT HAVE A
 DRIVE WAY; PROVIDE PROOF THAT A PERMIT FOR THE ROW
 APPROACH WAS APPROVED BY THE ENGINEERING DEPARTMENT.
 REGARDLESS OF THE PERMIT, ONLY ONE (1) ACCESS POINT IS
 ALLOWED FOR THIS PROPERTY. COORDINATE WHICH APPROACH
 WILL BE KEPT AND HOW THE VEHICULAR MANEUVERING AND
 PARKING WILL BE PROVIDED ON THE PROPERTY TO MEET
 COMMENT #2.
  
 (1) NUMBER OF ACCESS POINTS.
 A. ALL PROJECTS SHALL HAVE ACCESS TO A PUBLIC
 RIGHT-OF-WAY. THE NUMBER OF ACCESS POINTS SHALL BE AS
 FOLLOWS:
 TABLE INSET:
  
 TYPE OF DEVELOPMENT NUMBER OF ACCESS POINTS PREFERRED
 TYPE OF ACCESS
 RESIDENTIAL, < 75 UNITS 1 RESIDENTIAL OR MINOR
 COLLECTOR
  
 RESUBMITTAL: ONLY ONE ACCESS POINT/APPROACH OF A
 MAXIMUM OF 20' WIDE WILL BE ALLOWED. A U-DRIVE MAY ALSO
 BE PERMITTED PER PENDING CODE AMENDMENT, THE TWO (2)
 ACCESS POINTS HAVE TO BE A MAXIMUM OF 10 FEET EACH.
 HOWEVER, COMMENT NUMBER #4 NEEDS TO BE COMPLIED WITH
 (I.E. 25 FEET DEPTH X 100' WIDTH OF PROPERTY = 2500 SQ.
 FT. X .75 (75%) = 1875 SQ.FT. OF AREA TO BE LANDSCAPING
 (PERVIOUS AREA). SINCE THE SQ. FTG. IS MORE THAN 1,000
 SQ. FT. THEN 1,000 SQ. FT. WILL BE THE MINIMUM REQUIRED
 LANDSCAPED AREA FOR THE FRONT PROPERTY AREA.
 SHOW CALCULATIONS ON SURVEY AND/OR PLANS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ME.
  
 LINDA MIA FRANCO
 SENIOR PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: (561) 822-1443
 EMAIL: [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2011-04-28 Cont ID  
Sent By lfranco Date 2011-04-28 Time 11:46 Rev Time 0.00
Received By lfranco Date 2011-04-28 Time 11:46 Sent To  
Notes
2011-04-28 11:48:21PLANNING AND ZONING: **** FAILED *****
  
  
 1. RESPOND TO COMMENTS IN WRITING.
  
 3. THIS PROPERTY IS ZONED SF14 AND WAS PREVIOUSLY
 APPROVED FOR TWO UNITS. THREE UNITS WILL NOT BE
 ALLOWED. SEE COMMENTS BELOW.
  
  
 PLANNING AND ZONING: **** PASSED WITH PROVISO-REVISED
 SHEETS FOR ONE (1) NEW APPROACH AND DRIVEWAY PLUS A
 PERMIT FROM THE ENGINEERING DEPARTMENT FOR THE WORK ON
 ROW SHALL BE SUBMITTED PRIOR TO ANY BUILDING
 INSPECTION. LMF****
  
 1. RESPOND TO COMMENTS IN WRITING. REVISIONS MAY
 GENERATE NEW COMMENTS.
  
 2. PURSUANT TO SECTION 94-303 OF THE ZONING AND LAND
 DEVELOPMENT REGULATIONS ("ZLDR"): PARKING: ONE (1)
 PARKING SPACE SHALL BE PROVIDED FOR THE APARTMENT AND
 TWO (2) FOR THE PRINCIPAL STRUCTURE ON SITE. SEE
 COMMENT #3 FOR ADDITIONAL REQUIREMENTS.
  
 3. PURSUANT TO SECTION 94-482 OF THE ZLDR: REQUIRED
 OFF-STREET PARKING SPACES FOR LESS THAN FOUR
 RESIDENTIAL DWELLING UNITS SHALL BE LOCATED ON THE
 PROPERTY ON WHICH THE UNITS ARE CONSTRUCTED. REQUIRED
 PARKING MAY BE LOCATED IN A FRONT YARD; HOWEVER, THE
 LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT
 YARD AREA MUST BE LANDSCAPED. PARKING AREAS LOCATED IN
 THE FRONT YARD SHALL BE SURFACED WITH A SMOOTH,
 NON-DUSTING SURFACE IN COMPLIANCE WITH SUBSECTION
 33-485(E). IT SHALL BE A VIOLATION OF THIS CHAPTER TO
 PARK ON ANY UNPAVED AREAS AS DESCRIBED IN THIS ARTICLE.
 RESPONSE TO RE-SUBMITTAL: SEE COMMENT #4.
  
 4. PURSUANT TO SECTION 94-313. VEHICULAR ACCESS TO
 STREETS. ONLY ONE (1) ACCESS POINT IS ALLOWED FOR
 RESIDENTIAL DEVELOPMENTS LESS THAN 75 UNITS. THE SITE
 PLAN (SP-1) AND SURVEY SHOW TWO (2) EXISTING
 APPROACHES. THE SOUTHEAST APPROACH DOES NOT HAVE A
 DRIVE WAY; PROVIDE PROOF THAT A PERMIT FOR THE ROW
 APPROACH WAS APPROVED BY THE ENGINEERING DEPARTMENT.
 REGARDLESS OF THE PERMIT, ONLY ONE (1) ACCESS POINT IS
 ALLOWED FOR THIS PROPERTY. COORDINATE WHICH APPROACH
 WILL BE KEPT AND HOW THE VEHICULAR MANEUVERING AND
 PARKING WILL BE PROVIDED ON THE PROPERTY TO MEET
 COMMENT #2.
  
 (1) NUMBER OF ACCESS POINTS.
 A. ALL PROJECTS SHALL HAVE ACCESS TO A PUBLIC
 RIGHT-OF-WAY. THE NUMBER OF ACCESS POINTS SHALL BE AS
 FOLLOWS:
 TABLE INSET:
  
 TYPE OF DEVELOPMENT NUMBER OF ACCESS POINTS PREFERRED
 TYPE OF ACCESS
 RESIDENTIAL, < 75 UNITS 1 RESIDENTIAL OR MINOR
 COLLECTOR
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ME.
  
 LINDA MIA FRANCO
 SENIOR PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: (561) 822-1443
 EMAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved