Plan Review Stops For Permit 10110409 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2010-11-17 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-11-17 |
Time |
14:45 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-11-17 |
Time |
14:45 |
Sent To |
|
|
Notes |
2010-11-17 14:49:15 | PROVISO | | | | IN ORDER TO REDUCE THE OCCURRENCE OF GALVANIC CORROSION | | ROOF METAL INSTALLATION SHALL COMPLY WITH RAS 111 | | SECTION 4.3. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2010-11-17 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-11-16 |
Time |
07:55 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-11-16 |
Time |
07:55 |
Sent To |
|
|
Notes |
2010-11-16 12:21:14 | DENIED BY BUILDING | | | | 1) ITEM NUMBER 4 OF THE PROPOSED WORK ON THE ESTIMATE | | SPECIFIES COPPER DRIP EDGE, FLASHING AND VENTS AND | | GALVANIZED HIP AND RIDGE CHANNEL, BREAK AND VALLEY | | METAL. RAS 111 SECTION 4 REQUIRES ROOF METALS TO BE | | COMPATIBLE IN ORDER TO MINIMIZE GALVANIC CORRISION. THE | | COPPER AND GALVANIZED STEEL ARE NOT COMPATIBLE. PLEASE | | SPECIFY HOW COMPLIANCE WITH THIS REQUIREMENT WILL BE | | MET. | | | | 2) SPECIFY THE SLOPE OF THE PITCHED ROOF. | | | | 3) SPECIFY THE SQUARE FEET OF THE FLAT ROOF AND OF THE | | SLOPED ROOF. | | | | 4) SPECIFY THE MEAN ROOF HEIGHT OF THE STRUCTURE. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
|