Plan Review Stops For Permit 10100534 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2011-02-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2011-02-02 |
Time |
13:59 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2011-02-02 |
Time |
13:59 |
Sent To |
|
|
Notes |
2011-02-02 14:01:51 | PRODUCT APPROVALS FOR OWENS CORNING ASPHALT SHINGLES FL | | 10674-R3 WERE SUBMITTED. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2011-01-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2011-01-19 |
Time |
14:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2011-01-19 |
Time |
14:39 |
Sent To |
|
|
Notes |
2011-01-19 15:53:40 | 2007 FBC W/2009 REVISIONS | | | | DENIED BY BUILDING | | | | 1) THE STRUCTURE IS LOCATED IN EXPOSURE 'C' PER 2007 | | FBC R301.2.1.4.3. PLEASE REVISE THE PLANS AND COMPONENT | | AND CLADDING PRESSURES ACCORDINGLY. (PREVIOUS COMMENT) | | THE COMPONENT AND CLADDING PRESSURES IN THE TABLE ON | | SHEET A2 HAVE NOT BEEN INCREASED BY THE HEIGHT AND | | EXPOSURE ADJUSTMENT COEFFICIENTS IN TABLE R301.2(3) FOR | | EXPOSURE C. | | | | 2) THE PRODUCT REVIEW AFFIDAVIT FROM THE P.E. WILL NEED | | TO BE REVISED TO INCLUDE THE FIXED GLASS TRANSOM WINDOW | | AND THE INCREASED COMPONENT AND CLADDING PRESSURES. | | | | 3) THE INSTALLATION SCHEDULE FOR THE STORM PANELS | | REQUESTED IN THE FIRST REVIEW IS INCOMPLETE. PLEASE | | SPECIFY THE WALL PRESSURES AND SHUTTER SPANS. THE GLASS | | SEPARATION IS NOT REQUIRED AS LONG AS THE SPAN | | LIMITATIONS IN THE PRODUCT APPROVAL ARE FOLLOWED PER | | THE PRODUCT APPROVAL. THE SUBSTRATE SPECIFIED ON THE | | SCHEDULE IS CBS. THE ANCHOR SPACING TABLES IN THE | | PRODUCT APPROVAL ARE FOR CONCRETE OR CONCRETE BLOCK. | | PLEASE SPECIFY WHICH ONE OF THESE SUBSTRATE TYPES THE | | ANCHORS WILL BE INSTALLED INTO. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2010-11-17 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-11-17 |
Time |
13:29 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-11-03 |
Time |
11:40 |
Sent To |
|
|
Notes |
2010-11-17 13:29:57 | 2007 FBC W/2009 REVISIONS | | | | DENIED BY BUILDING | | | | 1) THE STRUCTURE IS LOCATED IN EXPOSURE 'C' PER 2007 | | FBC R301.2.1.4.3. PLEASE REVISE THE PLANS AND COMPONENT | | AND CLADDING PRESSURES ACCORDINGLY. | | | | 2) PLEASE REVISE THE DESIGN INFORMATION ON SHEET A2 TO | | REFLECT ASCE 7-05 AND EXPOSURE C. | | | | 3) PLEASE REVISE THE PRESSURES IN THE TABLE ON A2 AND | | UPDATE THE REFERENCE TO 2004 FBC TABLE 1609.6B TO 2007 | | FBCR TABLE R301.2(2). | | | | 4) SUBMIT TWO COPIES OF A ROOF FRAMING AND PERMANENT | | BRACING PLAN SPECIFYING THE ROOF TO WALL CONNECTIONS | | FROM THE DESIGNER OF RECORD FOR THE STRUCTURE AND | | SIGNED AND SEALED BY HIM. | | | | 5) UPDATE THE MASONRY NOTES ON A3 FROM SBCCI TO FBC AND | | ACI 530 AND 531 FROM THE 1995 TO THE 2005 EDITION AS | | REFERENCED BY 2007 FBC CHAPTER 43. | | | | 6) THE PRODUCT APPROVAL INSTALLATION INSTRUCTIONS FOR | | THE SINGLE HUNG WINDOWS REQUIRES 2X BUCKS AND THE PLANS | | SPECIFY 1X BUCKS. PLEASE CORRECT. | | | | 7) THE MULLION PRODUCT APPROVAL SUBMITTED IS FOR | | HORIZONTAL APPLICATION TO MULL TRANSOMS OVER WINDOWS. | | THE PLANS DO NOT SHOW ANY WINDOWS WITH TRANSOMS ABOVE | | THEM. SUBMIT PRODUCT APPROVALS FOR VERTICAL ORIENTATION | | BETWEEN WINDOWS. | | | | 8) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE FIXED | | TRANSOM WINDOW ABOVE THE DOUBLE ENTRY DOORS. | | | | 9) SPECIFY THE SIZE OF THE TRANSOM WINDOW ABOVE THE | | DOUBLE ENTRY DOORS ON THE PLANS. | | | | 10) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE | | STRUCTURAL MULLION BETWEEN THE ENTRY DOORS AND THE | | TRANSOM WINDOW ABOVE OR PROVIDE A DETAIL IF A POURED | | LINTEL OR STEEL BEAM IS USED. | | | | 11) SUBMIT 2 COPIES OF AN INSTALLATION SCHEDULE AND KEY | | PLAN FOR THE STORM PANELS. SPECIFY THE CONN TYPE, | | SUBSTRATE, ANCHOR TYPE, ANCHOR SPACING, PANEL SPANS, | | ETC ON THE SCHEDULE. | | THE SCHEDULE FOR INSTALLATION OF OPENING PROTECTIVE | | DEVICES IS AVAILABLE ON THE CONSTRUCTION SERVICES | | WEBSITE UNDER PERMIT FORMS. | | HTTP://WWW.WPB.ORG/CONSTRUCTION/PERMITS_FORMS.PHP | | | | 12) SUBMIT PRODUCT APPROVALS FOR THE TRUSS ANCHORS, | | CONNECTORS AND STRAPS OR LIST THERE FL#S OR NOAS ON THE | | PLANS. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2011-02-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2011-02-02 |
Time |
11:31 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2011-02-02 |
Time |
11:31 |
Sent To |
|
|
Notes |
2011-02-02 11:32:37 | ELECTRICAL PROVISO | | | | PROVIDE TWO COPIES OF THE PANEL SCHEDULE PER NEC 408.4 | | TO THE ELECTRICAL INSPECTOR AT THE FINAL INSPECTION. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2011-01-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2011-01-19 |
Time |
08:54 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2011-01-19 |
Time |
08:54 |
Sent To |
|
|
Notes |
2011-01-19 09:18:18 | ELECTRICAL PROVISO | | | | PROVIDE TWO COPIES OF THE PANEL SCHEDULE PER NEC 408.4 | | TO THE ELECTRICAL INSPECTOR AT THE FINAL INSPECTION. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2010-11-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-11-03 |
Time |
11:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-11-03 |
Time |
09:04 |
Sent To |
|
|
Notes |
2010-11-03 09:50:03 | 2007 FBC W/2009 REVISIONS | | 2008 NEC | | | | ELECTRICAL REVIEW DENIED | | | | 1) THE NAME AND LICENSE NUMBER OF THE PERSON | | RESPONSIBLE FOR THE ELECTRICAL DESIGN IS REQUIRED TO BE | | ON THE DRAWINGS. FS 471.003 | | | | 2) THE PLANS DO NOT COMPLY WITH 2008 NEC 210.52 FOR | | REQUIRED RECEPTACLE SPACING. | | | | 3) SHOW COMPLIANCE WITH NEC 422.31 AND 422.32 FOR | | DISCONNECTING MEANS AT A/C COMPRESSOR AND OTHER MOTOR | | DRIVEN APPLIANCES OR PERMANENTLY CONNECTED APPLIANCES. | | | | 4) SHOW COMPLIANCE WITH NEC 406.11 FOR TAMPER-RESISTANT | | RECEPTACLES. | | | | 5) SHOW COMPLIANCE WITH NEC 210.12 (B) FOR ARC-FAULT | | CIRCUIT-INTERRUPTER PROTECTION IN FAMILY ROOMS, DINING | | ROOMS, LIVING ROOMS, BEDROOMS, CLOSETS, HALLS AND OTHER | | SIMILAR ROOMS OR AREAS. | | | | 6) NEC 210.8 REQUIRES ALL 125 -VOLT, SINGLE PHASE, 15- | | AND 20- AMPERE RECEPTACLES INSTALLED IN GARAGES TO HAVE | | GROUND-FAULT CIRCUIT-INTERRUPTER PROTECTION. THE | | RECEPTACLE FOR THE GARAGE DOOR OPENER IS REQUIRED TO | | COMPLY. | | | | 7) SHOW COMPLIANCE WITH FBC R313.4 WHICH REQUIRES | | CARBON MONOXIDE ALARMS WITHIN 10 FEET OF EACH ROOM USED | | FOR SLEEPING PURPOSES. | | | | 8) A PANEL SCHEDULE IN COMPLIANCE WITH NEC 408.4 IS | | REQUIRED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2011-06-28 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2011-06-28 |
Time |
08:24 |
Rev Time |
0.00 |
Received By |
mgonzale |
Date |
2011-06-28 |
Time |
08:24 |
Sent To |
|
|
Notes |
2011-06-28 08:26:29 | PASSED | | | | PLAN SUBMITTED FOR DRIVEWAY AND APROACH IS ACCETABLE. | | NO CONFLICT WITH ANY CITY OF WPB PUBLIC UTILITIES. | | | | MANUEL JULIAN GONZALEZ | | CSD ENGINEERING REVIEW | | 401 CLEMATIS STREET, | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | MOBILE: (561) 644-7301 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2011-01-18 |
|
|
Cont ID |
|
Sent By |
|
Date |
2011-01-18 |
Time |
|
Rev Time |
1.00 |
Received By |
|
Date |
2011-01-18 |
Time |
|
Sent To |
|
|
Notes |
2011-01-18 12:48:59 | PASSED WITH PROVISO: | | | | DRIVEWAY APPROACH MUST CONFORM TO CITY OF WPB STANDARD, | | A COPY OF THAT STANDARD HAS BEEN PROVIDED WITH YOUR | | PERMIT. | | | | [email protected] | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2011-04-04 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2011-04-04 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2011-04-04 |
Time |
14:43 |
Sent To |
|
|
Notes |
2011-04-04 14:45:03 | WINDOW REVISION SENT TO MCDOUGAL'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2011-01-26 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2011-01-26 |
Time |
14:03 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2011-01-26 |
Time |
14:02 |
Sent To |
|
|
Notes |
2011-01-26 14:03:12 | SENT TO R. MCDOUGAL'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2010-12-10 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2010-12-10 |
Time |
13:42 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2010-12-10 |
Time |
13:42 |
Sent To |
|
|
Notes |
2010-12-10 13:42:53 | SENT TO R3. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2011-01-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2011-01-19 |
Time |
15:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-10-20 |
Time |
13:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2011-02-04 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2011-02-04 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2011-02-04 |
Time |
14:33 |
Sent To |
|
|
Notes |
2011-02-04 14:37:25 | MU-2011-002089-0000 |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2010-11-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-11-03 |
Time |
11:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-11-03 |
Time |
11:39 |
Sent To |
|
|
Notes |
2010-11-03 11:39:57 | IMPACT FEE REVIEW IS REQUIRED. |
|
|
Review Stop |
L |
LANDSCAPING |
Rev No |
1 |
Status |
N |
Date |
2010-12-13 |
|
|
Cont ID |
|
Sent By |
rkussner |
Date |
2010-12-13 |
Time |
12:00 |
Rev Time |
0.00 |
Received By |
rkussner |
Date |
2010-12-13 |
Time |
11:49 |
Sent To |
|
|
Notes |
2010-12-13 12:01:34 | ***LANDSCAPE REVIEW NOT REQUIRED*** | | | | PLEASE REFER TO PERMIT #10110364 FOR LANDSCAPE PERMIT | | AND PLANS---RAK |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2010-11-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-11-02 |
Time |
15:54 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-11-02 |
Time |
15:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2011-02-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2011-02-02 |
Time |
09:48 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2011-02-02 |
Time |
09:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2011-01-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2011-01-19 |
Time |
07:30 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2011-01-19 |
Time |
07:30 |
Sent To |
|
|
Notes |
2011-01-19 07:58:19 | 2007 FBC W/2009 REVISIONS | | | | DENIED BY PLUMBING | | | | 1) THE PLUMBING RISER DIAGRAM ON A3 ONLY SHOWS ONE OF | | THE TWO LAVATORIES LOCATED IN THE MASTER BATHROOM. | | PLEASE REVISE THE DIAGRAM TO SHOW HOW THE SECOND | | LAVATORY IS CONNECTED TO THE BUILDING DRAIN AND HOW IT | | WILL BE VENTED. | | | | 2) ON A3 THE VENT TO ROOF FOR THE WASHING MACHINE DRAIN | | IS SPECIFIED AS 2" ON THE PLUMBING RISER DIAGRAM AND 3" | | ON THE FLOOR PLAN. PLEASE COORDINATE THE VENT SIZE. | | | | 3) ON A7 IN THE BUILDER NOTES AT THE BOTTOM OF THE | | ELECTRICAL SYMBOL LEGEND THERE IS A NOTE THAT STATES | | ALL PLUMBING SHALL COMPLY WITH THE 2004 FL PLUMBING | | CODE. PLEASE UPDATE THIS NOTE TO THE 2007 FL PLUMBING | | CODE. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2010-11-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-11-02 |
Time |
08:45 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-11-02 |
Time |
08:45 |
Sent To |
|
|
Notes |
2010-11-02 09:52:56 | 2007 FBC W/2009 REVISIONS | | | | DENIED BY PLUMBING | | | | 1) THE PLUMBING RISER DIAGRAM ON A3 IS MISSING THE | | MASTER BATH SHOWER. PLEASE CORRECT. | | | | 2) THE WET VENT FOR BATH #2 DOES NOT COMPLY WITH FBCR | | P3108.2. IN HORIZONTAL WET-VENT SYSTEMS, NOT MORE THAN | | ONE WET-VENTED FIXTURE SHALL DISCHARGE UPSTREAM OF THE | | DRY-VENTED FIXTURE DRAIN CONNECTION. | | | | 3) THE TUB IN BATH #2 IS INCORRECTLY LABELED AS A | | SHOWER. PLEASE CORRECT. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2010-12-29 |
|
|
Cont ID |
|
Sent By |
lfranco |
Date |
2010-12-29 |
Time |
17:36 |
Rev Time |
0.00 |
Received By |
lfranco |
Date |
2010-12-29 |
Time |
17:36 |
Sent To |
ENG |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2010-11-18 |
|
|
Cont ID |
|
Sent By |
lfranco |
Date |
2010-11-18 |
Time |
18:18 |
Rev Time |
0.00 |
Received By |
lfranco |
Date |
2010-11-18 |
Time |
18:18 |
Sent To |
|
|
Notes |
2010-11-18 18:44:25 | PLANNING AND ZONING: **** FAILED **** | | | | | | 1. PLEASE RESPOND TO COMMENTS IN WRITING. | | | | 2. PROVIDE PROPOSED BUILDING (STRUCTURE) ON THE SURVEY | | DEPICTING DIMENSIONS TO ALL PROPERTY LINES. THE REAR | | SETBACK IS NOT SHOWN. | | | | 3. INDICATE SETBACK DIMENSIONS FROM PROPOSED | | A/C/MECHANICAL EQUIPMENT TO ALL PROPERTY LINES. | | PURSUANT TO SECTION 94-305(B)(4) OF THE ZLDR: | | MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN 4 FEET | | INTO A REQUIRED SETBACK. | | | | 4. PURSUANT TO SECTION 94-482 OF THE ZLDR: REQUIRED | | OFF-STREET PARKING SPACES FOR LESS THAN FOUR | | RESIDENTIAL DWELLING UNITS SHALL BE LOCATED ON THE | | PROPERTY ON WHICH THE UNITS ARE CONSTRUCTED. REQUIRED | | PARKING MAY BE LOCATED IN A FRONT YARD; HOWEVER, THE | | LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT | | YARD AREA MUST BE LANDSCAPED. PARKING AREAS LOCATED IN | | THE FRONT YARD SHALL BE SURFACED WITH A SMOOTH, | | NONDUSTING SURFACE IN COMPLIANCE WITH SUBSECTION | | 33-485(E). IT SHALL BE A VIOLATION OF THIS CHAPTER TO | | PARK ON ANY UNPAVED AREAS AS DESCRIBED IN THIS ARTICLE. | | | | PLEASE INDICATE SQUARE FOOTAGE OF ALL IMPERMEABLE | | SURFACES (EXISTING AND PROPOSED) LOCATED WITHIN THE | | FRONT YARD (FROM FRONT PROPERTY LINE TO THE FRONT | | BUILDING FACADE). | | | | 5. PROVIDE TOTAL HEIGHT FROM FINISHED FLOOR TO FINISHED | | ROOF TOP ON SHEET WITH ELEVATIONS. | | | | 6. A SEPARATE LANDSCAPE PERMIT IS REQUIRED. CONTACT | | ROBERT KUSSNER (LANDSCAPE PLANNER) @ 822-1462. | | | | SUBMIT TWO (2) COPIES OF A LANDSCAPE PLAN SHOWING | | COMPLIANCE WITH SECTIONS 94-442 AND 94-445 OF THE ZLDR. | | | | 7. A SEPARATE PERMIT FOR THE PROPOSED DRIVEWAY WILL BE | | REQUIRED FROM THE ENGINEERING DEPARTMENT THROUGH | | CONSTRUCTION SERVICES. | | | | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME. | | | | LINDA MIA FRANCO | | SENIOR PLANNER | | PLANNING AND ZONING DEPARTMENT | | TEL: (561) 822-1443 | | EMAIL: [email protected] | | | | | | |
|
|