Plan Review Stops For Permit 10090833 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2010-10-29 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2010-10-29 |
Time |
12:48 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2010-10-29 |
Time |
12:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2010-10-15 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2010-10-15 |
Time |
16:08 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2010-10-15 |
Time |
16:08 |
Sent To |
|
|
Notes |
2010-10-15 16:10:40 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 2007 | | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL | | | | 1. CONCRETE SUBSTRATE SPECIFIED ON THE INSTALLATION | | SCHEDULE. AS HORIZONTAL INSTALLATION OF PANELS IS | | PROPOSED, IT IS LIKELY THAT THE SUBSTRATE IS FILLED | | BLOCK, WHICH REQUIRES USE OF THE CONCRETE BLOCK | | (MASONRY) SUBSTRATE CHARTS. PLEASE REVISE OR PROVIDE | | EVIDENCE THAT FORMED AND POURED COLUMNS EXIST ON BOTH | | SIDES OF EACH OPENING. | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2010-10-15 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2010-10-15 |
Time |
16:10 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2010-09-30 |
Time |
16:32 |
Sent To |
|
|
Notes |
2010-09-30 16:33:20 | UNDER 5 K BUILDING |
|
|
|