Plan Review Stops For Permit 10090449 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2010-09-21 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2010-09-21 |
Time |
15:56 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2010-09-21 |
Time |
15:56 |
Sent To |
PC |
|
Notes |
2010-09-21 16:53:01 | BUILDING REVIEW APPROVED WITH PROVISO. | | | | 1- ROOF RECOVERING REQUIRES PRE-INSPECTION TO VERIFY | | CONDITION OF EXISTING ROOF AS REQUIRED BY SEC. 611.3 OF | | 2007 FBC-EXISTING BUILDING. PLEASE SCHEDULE | | PRE-INSPECTION CODE 101 TO MEET INSPECTOR ON THE JOB | | SITE PRIOR TO DOING THE RECOVERY JOB. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
|
Date |
2010-09-16 |
|
|
Cont ID |
|
Sent By |
jpapa |
Date |
2010-09-16 |
Time |
16:07 |
Rev Time |
0.00 |
Received By |
jpapa |
Date |
2010-09-16 |
Time |
16:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2010-09-16 |
|
|
Cont ID |
|
Sent By |
jpapa |
Date |
2010-09-16 |
Time |
16:08 |
Rev Time |
0.00 |
Received By |
jpapa |
Date |
2010-09-16 |
Time |
15:54 |
Sent To |
I |
|
Notes |
|
|
|