Plan Review Details - Permit 10080328
Plan Review Stops For Permit 10080328
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2010-08-23 Cont ID  
Sent By jwitmer Date 2010-08-23 Time 07:45 Rev Time 0.25
Received By jwitmer Date 2010-08-23 Time 07:30 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2010-08-23 Cont ID  
Sent By jleahy Date 2010-08-23 Time 07:59 Rev Time 0.00
Received By jleahy Date 2010-08-23 Time 07:59 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2010-08-19 Cont ID  
Sent By lwagner Date 2010-08-19 Time 15:54 Rev Time 0.00
Received By mcarsill Date 2010-08-19 Time 15:30 Sent To  
Notes
2010-08-19 15:54:081000-45TH STREET
 HOMELESS RESOURCE CENTER
 PERMIT NUMBER 10080328
 "INTERIOR DEMOLITION OF 3 EXISTING BUILDINGS, DRYWALL,
 FRAMING, ACOUSTIC, FLOORING, A/C, PLUMBING, ELECTRIC"
  
  
 1. ALL CONSTRUCTION, DEMOLITION, AND RENOVATION TO
 COMPLY WITH NFPA 241.
  
 2. DEBRIS SHALL BE REMOVED FROM THE STRUCTURES DAILY.
  
 3. SUITABLE EXIT ACCESS AND EXITS SHALL BE PROVIDED
 DURING DEMOLITION ACTIVITIES.
  
 4. ALL CUTTING AND WELDING OPERATIONS SHALL COMPLY WITH
 NFPA 51B. WHEN CUTTING OR WELDING OPERATIONS OCCUR, A
 MINIMUM OF AT LEAST THIRTY FIVE (35) FEET OF CLEARANCE
 TO COMBUSTIBLES IS REQUIRED. IF NOT POSSIBLE TO ACHIEVE
 THIS SEPARATION, FIRE RATED MATERIALS MUST BE USED TO
 SHIELD THE COMBUSTIBLE MATERIALS FROM THE CUTTING OR
 WELDING OPERATIONS. PAY CLOSE ATTENTION TO WALL AND
 FLOOR OPENINGS SHOULD THIS ACTIVITY OCCUR.
  
 5. SHOULD GASOLINE POWERED SAWS BE USED INSIDE, PROPER
 VENTILATIONS CONTROLS SHALL BE USED. CARBON MONOXIDE IS
 A COLORLESS, ODORLESS, AND TASTELESS GAS AND IS ALSO
 FLAMMABLE IN THE CORRECT CONCENTRATION. PROPER
 VENTILATION IS NECESSARY TO PREVENT CARBON MONOXIDE
 POISONING.
  
 6. SUITABLE FIRE EXTINGUISHERS SHALL BE AVAILABLE FOR
 USE SHOULD THE NEED ARISE.
  
 7. SUITABLE COMMUNICATION EQUIPMENT SHALL BE AVAILABLE
 TO REPORT EMERGENCIES TO EMERGENCY SERVICE
 ORGANIZATIONS.
  
 8. DEMOLITION OF ELECTRICAL EQUIPMENT, SYSTEMS, AND
 DEVICES SHALL BE PERFORMED IN AN APPROVED AND IN A SAFE
 MANNER.
  
 9. FIRE SEPARATION MATERIALS OR SYSTEMS SHOULD BE
 REMOVED TOWARDS THE END OF THE DEMOLITION TO PROVIDE
 FIRE CONTROLS SHOULD AN UNWANTED FIRE OCCUR.
  
 10. WET FIRE HYDRANTS ARE REQUIRED PRIOR TO, DURING,
 AND AFTER CONSTRUCTION.
  
 APPROVED PROVISO
  
  
 MIKE CARSILLO, BATTALION CHIEF
 BUREAU OF FIRE PREVENTION

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2010-08-23 Cont ID  
Sent By jwitmer Date 2010-08-23 Time 08:09 Rev Time 0.00
Received By jwitmer Date 2010-08-11 Time 14:32 Sent To  
Notes
2010-08-11 14:32:33INCOMING SENT TO C-13

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2010-08-23 Cont ID  
Sent By jwitmer Date 2010-08-23 Time 08:00 Rev Time 0.25
Received By jwitmer Date 2010-08-23 Time 07:45 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2010-08-18 Cont ID  
Sent By lwagner Date 2010-08-18 Time 08:26 Rev Time 0.00
Received By lwagner Date 2010-08-18 Time 08:14 Sent To  
Notes
***NONE***