Plan Review Details - Permit 10080108
Plan Review Stops For Permit 10080108
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2010-10-01 Cont ID  
Sent By rmcdouga Date 2010-10-01 Time 09:54 Rev Time 0.00
Received By rmcdouga Date 2010-10-01 Time 09:54 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2010-08-31 Cont ID  
Sent By rmcdouga Date 2010-08-31 Time 07:51 Rev Time 0.00
Received By rmcdouga Date 2010-08-31 Time 07:51 Sent To  
Notes
2010-08-31 08:03:292007 FBC W/2009 REVISIONS
  
 DENIED BY BUILDING
  
 1) THE WINDOW SCHEDULE THAT WAS SUBMITTED INDICATES
 OPENINGS THAT ARE 108", 112" AND 204" WIDE. THESE ARE
 WIDER THAN THE WIDTH OF THE WINDOWS LISTED IN THE
 PRODUCT APPROVAL. ARE THESE MULTIPLE WINDOWS THAT ARE
 MULLED TOGETHER? PLEASE CLARIFY.
  
 2) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE
 STRUCTURAL MULLIONS.
  
 3) SHOW COMPLIANCE WITH FBCR 313.2.1 AND 313.4 FOR
 REQUIRED SMOKE ALARMS AND CARBON MONOXIDE PROTECTION.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2010-10-01 Cont ID  
Sent By jleahy Date 2010-10-01 Time 12:10 Rev Time 0.00
Received By jleahy Date 2010-10-01 Time 12:10 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2010-08-24 Cont ID  
Sent By shill Date 2010-08-24 Time 19:14 Rev Time 0.00
Received By shill Date 2010-08-24 Time 19:11 Sent To  
Notes
2010-08-24 19:17:22PERMIT PACKAGE SHOWS NO ELECTRICAL INFO AT ALL,NO PLAN
 OR ANY DISCREPTION OF WORK
  
 JOHN DICKINSON (CONTRACT REVIEWER PX3182)
 561-718-3230
 561-805-6650
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2010-09-28 Cont ID  
Sent By rmcdouga Date 2010-09-28 Time 15:23 Rev Time 0.00
Received By rmcdouga Date 2010-09-28 Time 15:23 Sent To  
Notes
2010-09-28 15:24:36SENT TO R MCDOUGAL'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2010-08-31 Cont ID  
Sent By rmcdouga Date 2010-08-31 Time 08:03 Rev Time 0.00
Received By rmcdouga Date 2010-08-05 Time 11:50 Sent To  
Notes
2010-08-05 11:50:28TO R15.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2010-10-01 Cont ID  
Sent By rmcdouga Date 2010-10-01 Time 10:56 Rev Time 0.00
Received By rmcdouga Date 2010-10-01 Time 10:56 Sent To E
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2010-08-30 Cont ID  
Sent By rmcdouga Date 2010-08-30 Time 15:54 Rev Time 0.00
Received By rmcdouga Date 2010-08-30 Time 15:54 Sent To  
Notes
2010-08-30 16:33:342007 FBC W/2009 REVISIONS
  
 DENIED BY MECHANICAL
  
 1) THE NOTARIZED SIGNATURE OF THE MECHANICAL CONTRACTOR
 ON THE PERMIT APPLICATION IS REQUIRED.
  
 2) ACCORDING TO ITEM NUMBER 53 IN THE SCOPE OF WORK,
 THE AIR-HANDLER IS TO BE RELOCATED. THIS WILL REQUIRE
 THE EXISTING DUCTWORK TO BE RE-CONFIGURED, THEREFORE,
 THIS IS NOT CONSIDERED AN EXACT CHANGE-OUT. SUBMIT TWO
 SETS OF HVAC DRAWINGS. PROVIDE FLOOR PLANS SHOWING THE
 LOCATION OF THE UNITS, SUPPLY AND RETURN DUCT LOCATIONS
 AND SIZES, GRILL SIZES, CFMS AT EACH DROP, TRANSFER
 DUCTS OR GRILLS. SPECIFY THE SIZE AND MODEL NUMBERS OF
 THE HVAC EQUIPMENT ON THE PLANS.
  
 3) SUBMIT TWO COPIES OF MANUAL J CALCULATIONS OR OTHER
 APPROVED HEATING AND COOLING EQUIPMENT SIZING
 CALCULATIONS.
  
 4) INDICATE THE LOCATION OF THE GAS DRYER (ITEM 21).
 SHOW COMPLIANCE WITH FBCR M1701.1 FOR COMBUSTION AIR.
  
 5) THE DRAWINGS CAN BE DONE BY FLORIDA LICENSED DESIGN
 PROFESSIONALS OR A FLORIDA LICENSED HVAC CONTRACTOR. IF
 THEY ARE FROM A HVAC CONTRACTOR, THE NAME AND LICENSE
 NUMBER OF THE CONTRACTOR IS REQUIRED ON THE PLANS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop P PLUMBING
Rev No 2 Status P Date 2010-10-01 Cont ID  
Sent By rmcdouga Date 2010-10-01 Time 09:54 Rev Time 0.00
Received By rmcdouga Date 2010-10-01 Time 09:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2010-08-30 Cont ID  
Sent By rmcdouga Date 2010-08-30 Time 16:34 Rev Time 0.00
Received By rmcdouga Date 2010-08-30 Time 16:34 Sent To  
Notes
2010-08-30 16:47:242007 FBC W/2009 REVISIONS
  
 DENIED BY PLUMBING
  
 1) SUBMIT TWO SETS OF AN ISOMETRIC DRAIN, WASTE AND
 VENT DRAWING. SHOW LOCATION OF THE NEW CLOTHES WASHER
 STANDPIPE.
  
 2) THE DRAWINGS CAN BE DONE BY FLORIDA LICENSED DESIGN
 PROFESSIONALS OR A FLORIDA LICENSED PLUMBING
 CONTRACTOR. IF THEY ARE FROM A PLUMBING CONTRACTOR, THE
 NAME AND LICENSE NUMBER OF THE CONTRACTOR IS REQUIRED
 ON THE PLANS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop Z ZONING
Rev No 1 Status N Date 2010-08-09 Cont ID  
Sent By kdfreema Date 2010-08-09 Time 13:37 Rev Time 0.00
Received By kdfreema Date 2010-08-09 Time 13:37 Sent To  
Notes
2010-08-09 13:37:30VALUE OF JOB DOES NOT EXCEED 50 PERCENT OF PAPA
 IMPROVEMENT VALUE.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved