Plan Review Details - Permit 10050602
Plan Review Stops For Permit 10050602
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2010-06-09 Cont ID  
Sent By jgomez Date 2010-06-09 Time 17:09 Rev Time 0.00
Received By jgomez Date 2010-06-09 Time 17:09 Sent To  
Notes
2010-06-09 17:11:11APPROVED WITH PROVISO:
  
 1- ENGINEER TO REVISE MEMBRANE ATTACHMENT CALCULATIONS.
 SYSTEM DESIGN PRESSURE IS -45PSF NOT -60PSF.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2010-05-24 Cont ID  
Sent By jgomez Date 2010-05-24 Time 11:33 Rev Time 0.00
Received By jgomez Date 2010-05-24 Time 11:33 Sent To  
Notes
2010-05-24 11:58:25RESIDENTIAL (R2) RE-ROOF, BUILDING REVIEW CHECKLIST:
  
 1- THERE ARE TWO DIFFERENT ASSEMBLIES SUBMITTED. ONE IS
 ON PAGE 7 OF 14 AND THE OTHER ONE IS ON PAGE 9 OF 14.
 ENGINEERING CALCULATIONS ONLY SPECIFY SYSTEM ON PAGE 7
 OF 14. ALSO, THERE ARE SOME HAND WRITTEN CALCULATIONS
 ON SHEET 9 OF 14. THESE CALCULATIONS ARE INCORRECT
 BECAUSE THIS BUILDING IS LOCATED ON EXPOSURE "C". NEED
 TO REVISE ENGINEERING CALCULATIONS TO REFLECT
 INFORMATION SUBMITTED. PROVIDE CALCULATIONS WITH
 ENGINEER'S ORIGINAL SEAL AND SIGNATURE TO FILE ON
 MASTER PERMIT..
  
 2- REMAINDER: NEED THE TESTING APPLICATION STANDARD TAS
 105 AS REQUIRED BY CONCRETE DECK SYSTEM LIMITATION ON
 LAST PAGE OF NOA SUBMITTED.
  
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2010-05-24 Cont ID  
Sent By jgomez Date 2010-05-24 Time 11:33 Rev Time 0.00
Received By jgomez Date 2010-05-24 Time 11:33 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved