Plan Review Details - Permit 10030222
Plan Review Stops For Permit 10030222
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2010-04-08 Cont ID  
Sent By jwitmer Date 2010-04-08 Time 09:32 Rev Time 0.77
Received By jwitmer Date 2010-04-08 Time 09:32 Sent To Z
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2010-03-30 Cont ID  
Sent By btrobaug Date 2010-03-30 Time 10:00 Rev Time 0.00
Received By btrobaug Date 2010-03-25 Time 11:29 Sent To ENG
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2010-04-07 Time   Rev Time 0.00
Received By   Date 2010-04-02 Time   Sent To B
Notes
2010-04-07 15:27:28REVIEWER:
 DEAN S. LAUDERMILK, PROJECT COORDINATOR,
 DIRECT DIAL: (561) 494-1083
 FAX: (561) 494-1116
 EMAIL: [email protected]
  
 PASSED WITH PROVISOS:
 THE LIGHT POLES WILL NEED TO HAVE BANNER POLES ON THEM.
 THE LIGHT POLE COME WITH THE BANNER POLE WITH A
 THREADED OPENING PRE-MADE IN THE POLE FOR THE BANNER
 POLE TO SCREW INTO, THEN 3-4' BELOW THIS IS ANOTHER
 MALE THREAD OPENING (3/4") FOR A LOOP TO BE INSTALLED
 TO HOLD THE BOTTOM OF THE BANNER STEADY. THE POLES WILL
 NEED TO BE RESUBMITTED WITH THE OPENINGS AND THE BANNER
 POLES WITH THE LOOPS. THIS MAY ALSO AFFECT THE WIND
 LOAD CALCULATIONS, CHECK WITH THE MANUFACTURER TO SEE
 IF THE WIND LOAD CALCULATIONS WILL NEED TO BE CHANGED
 AND RESUBMITTED.
  
 THE DETAILS ON E-05 SHOW THE PULL BOXES BETWEEN THE
 POLES AND CURBS. THE PULL BOXES SHOULD BE ON ONE SIDE
 OR THE OTHER (EAST OR WEST SIDE) SO PEDESTRIAN TRAFFIC
 IS NOT BLOCKED, NOT AS SHOWN.
  
 SHEET E-04 HAS A TABLE STATING THAT THE POLES WILL BE
 EITHER 3'-1", 6', 10' OR 9' FROM BACK OF CURB. I THINK
 SOME OF THESE DISTANCES WILL BLOCK THE ADA COMPLIANCE
 ON THE SIDEWALKS. BE SURE NOT TO SET A POLE WITHOUT THE
 PROPER ADA CLEARANCE.
  
 SHEET E-05 SHOWS A 30" CONCRETE COLLAR AROUND THE POLE
 BASE, WHILE THE WIND LOADS SHOW NO CONCRETE. WHICH IS
 IT?
  
 THE PLAN CALLS TO TIE IN TO A POWER POLE ON THE SOUTH
 SIDE OF THE ALLEY. THE ONLY POWER POLE IN THE ALLEY
 WEST OF SPRUCE IS ON THE NORTH SIDE OF THE ALLEY,
 BETWEEN 24TH AND 25TH. THE ADDITIONAL PROBLEM IS THAT
 THIS IS AN AREA WHERE EVERYTHING IS TO BE REMOVED TO
 BUILD A CONDO ON BOTH SIDES OF THE ALLEY AND RELOCATE
 THE ALLEY. RELOCATE THE POWER CONNECTION TO THE EAST
 SIDE OF SPRUCE OR AT A POINT NORTH OF 25TH STREET.
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2010-04-12 Cont ID  
Sent By shill Date 2010-04-12 Time 09:39 Rev Time 0.00
Received By shill Date 2010-03-16 Time 08:49 Sent To PC
Notes
2010-04-12 11:00:06TO PROCESSING
2010-03-16 08:49:44TO ELECTRIC

Review Stop Z ZONING
Rev No 1 Status N Date 2010-04-08 Cont ID  
Sent By ajones Date 2010-04-08 Time 17:02 Rev Time 0.00
Received By ajones Date 2010-04-08 Time 17:02 Sent To B
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved