Plan Review Details - Permit 10020554
Plan Review Stops For Permit 10020554 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2010-03-01 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2010-02-25 |
Time |
11:55 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2010-03-01 |
Time |
09:53 |
Sent To |
|
|
Notes |
2010-03-01 10:11:04 | PROVISO - PROVIDE ORIGINAL STRUCTURAL ENGINEERING | | | 2010-02-25 11:55:09 | | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2010-02-25 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2010-02-25 |
Time |
|
Rev Time |
2.00 |
Received By |
mgonzale |
Date |
2010-02-25 |
Time |
|
Sent To |
B |
|
Notes |
2010-02-25 16:21:36 | PASSED WITH PROVISOS 02/25/2010: | | | | 1. EOR HAS REVISED PLAN RELATED TO SOIL DENSITY. | | 2. PIPE MATERIAL FOR STORM WORK IN THE BUILDING HAS | | BEEN IDENTFIED AS PVC. | | 3. SHOP DRAWINGS HAVE BEEN PROVIDED. | | (MANHOLE COVER AND FRAME MUST BE HINGE DESIGN AS SHOWN | | ON CWPB DETAIL ST-2) | | (SEE DETAIL ATTACHED) | | 4. CWPB STANDARD DETAILS HAVE BEEN ATTACHED ALONG WITH | | GENERAL NOTES. | | 5. EOR HAS INCLUDED CWPB DETAIL GS-2 IN AN EFFORT TO | | ILLUSTRATE PIPE TO MANHOLE CONNECTION. | | 6. 15" RCP STORM PIPE IN CONFLICT HAS ALSO BEEN SHOWN | | AND ELEVATION OF NEW 24" PVC PIPE WAS CHANGE TO AVOID | | CONFLICT. | | | | MANUEL JULIAN GONZALEZ | | ESD ENGINEERING REVIEW | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | MOBILE: (561) 644-7301 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | | | | | | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2010-02-25 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2010-02-25 |
Time |
|
Rev Time |
3.00 |
Received By |
mgonzale |
Date |
2010-02-25 |
Time |
|
Sent To |
B |
|
Notes |
2010-02-25 11:56:21 | SHEET C-9: | | | | 1.NOTE 3 DENSITY SPECIFICATION FOR T-180 IS 98% | | 2.PIPE MATERIAL NOT APPROVED FOR PROPOSED USE. PER FBC | | PLUMBING CODE, SECTION 1102. | | 3.SHOP DRAWING, MATERIAL SUBMITTALS, AND SPECIFICATIONS | | REQUIRED. | | 4.PROVIDE STRUCTURE CONNECTION DETAIL FOR PIPE, RWL, | | AREA DRAINS, AND CONDENSATE LINES. | | | | MANUEL JULIAN GONZALEZ | | ESD ENGINEERING REVIEW | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | MOBILE: (561) 644-7301 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2010-03-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2010-03-01 |
Time |
10:10 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2010-02-24 |
Time |
16:23 |
Sent To |
|
|
Notes |
2010-02-24 16:24:10 | TO MANNY GONZALEZ DESK | | |
|
|
|