|
 |
 |
 |
 |
 |
Plan Review Details - Permit 10010149
Plan Review Stops For Permit 10010149 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2010-01-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-01-28 |
Time |
06:56 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-01-28 |
Time |
06:56 |
Sent To |
|
|
Notes |
2010-01-28 09:57:54 | REVISION REQUIRED | | | | 1) THE SPAN OF APPROXIMATLY 8 FEET FOR THE 3-5/8" 24 | | GAGE METAL STUDS AT 16" OC FOR THE CEILING JOISTS IS | | NOT ADEQUATE. MID-SPAN BRACING OR 20 GAGE STUDS ARE | | REQUIRED. FBC R804.3.1 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2010-01-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-01-19 |
Time |
13:16 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-01-19 |
Time |
13:16 |
Sent To |
|
|
Notes |
2010-01-19 14:49:01 | 2007 FBC W/2009 REVISIONS | | | | DENIED BY BUILDING | | | | 1) SUBMIT TWO COPIES OF FRAMING PLANS FOR THE PROPOSED | | NEW CEILING. SPECIFY THE MATERIALS THAT WILL BE USED, | | THE SPACING OF THE JOISTS, THE FASTENERS, THE | | ATTACHMENTS TO THE STRUCTURE, ETC. FBC 1604 | | | | 2) SPECIFY THE THICKNESS OF THE DRYWALL THAT WILL BE | | INSTALLED ON THE CEILING ON THE PLANS. FBC 1604 | | | | NOTE: COMBUSTIBLE MATERIALS ARE NOT PERMITTED FOR ROOF | | FRAMING IN TYPE I AND II CONSTRUCTION OR IN CONCEALED | | SPACES. SEE FBC 603 AND 717.5. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2010-01-14 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2010-01-14 |
Time |
11:59 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2010-01-14 |
Time |
11:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2010-01-27 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2010-01-26 |
Time |
10:49 |
Rev Time |
0.00 |
Received By |
lmartine |
Date |
2010-01-26 |
Time |
10:48 |
Sent To |
|
|
Notes |
2010-01-27 10:49:30 | GAVE TO ROBBIE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2010-01-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-01-19 |
Time |
14:49 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-01-12 |
Time |
12:20 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2010-01-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2010-01-19 |
Time |
14:49 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2010-01-19 |
Time |
14:49 |
Sent To |
|
|
Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |