Plan Review Stops For Permit 09100070
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2009-10-21 Cont ID  
Sent By shill Date 2009-10-21 Time 14:52 Rev Time 0.00
Received By shill Date 2009-10-21 Time 14:52 Sent To  
Notes
2009-10-21 14:53:35REVISED INSTALLATION AND HIGHLIGHTED PRODUCT APPROVAL
 OK W/REDLINE (PER CONTRACTOR)

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2009-10-07 Cont ID  
Sent By shill Date 2009-10-07 Time 11:34 Rev Time 0.00
Received By shill Date 2009-10-07 Time 11:34 Sent To  
Notes
2009-10-07 12:13:39***ISSUED WITH PROVISO****
 ***REVISED INSTALLATION SCHEDULE REQUIRED PRIOR TO
 FIRST INSPECTION***
  
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
 FBC FLORIDA BUILDING CODE 2007
 FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL
  
 1. THE INSTALLATION SCHEDULE SUBMITTED SHOWS A 3 1/2"
 EDGE DISTANCE, WOOD SUBSTRATE, AND FOR A 60" OPENING,
 63" SPAN. PLEASE REVISE SPANS TO BE CONSISTENT WITH
 OTHER INFORMATION. THE EXAMPLE PROVIDED IS OPENING #1,
 BUT THIS COMMENT APPLIES TO MANY OPENINGS.
  
 2. SHUTTER CONNECTION MOUNTING TYPE SHOULD INCLUDE THE
 SPECIFIC MOUNTING DETAIL PROPOSED. IN THIS CASE, YOU
 HAVE CIRCLED ALTERNATE 4 ON PAGE 8. THIS REQUIRES 6"
 ANCHOR SPACING, BUT YOU'VE PROPOSED 12"/10". PLEASE
 REVISE THE INSTALLATION SCHEDULE TO INCLUDE WHICH
 MOUNTING TYPE YOU PROPOSE TO USE ON EACH OPENING, AND
 REVISE ANCHOR SPACING AS NEEDED.
  
 3. PLEASE VERIFY SUBSTRATE. 3 1/2" EDGE DISTANCE
 PROPOSED; SEE DETAILS ON PRODUCT APPROVAL. ANCHOR MUST
 BE IN CENTER OF SILL; IT APPEARS THAT 3 1/2" EDGE
 DISTANCE WILL NOT COMPLY WITH PRODUCT APPROVAL
 REQUIREMENTS. ON THE PRODUCT APPROVAL, ANCHOR SPACING
 FOR MASONRY IS HIGHLIGHTED ON PAGE 6. PLEASE CONFIRM
 SUBSTRATE AND REVISE EDGE DISTANCE AND/OR SUBSTRATE AS
 REQUIRED.
  
 4. TAPCONS PROPOSED, BUT THE DETAIL HIGHLIGHTED
 REQUIRES LAG SCREWS. PLEASE ADVISE WHERE THE PRODUCT
 APPROVAL SPECIFIES USE OF TAP CONS INTO WOOD SUBSTRATE,
 OR REVISE INSTALLATION SCHEDULE, OR PROVIDE ENGINEERING
 FOR PROPOSED INSTALLATION.
  
 5. THE DEFINITION OF EXPOSURE C HAS CHANGED. PLEASE SEE
 NEW DEFINITION FBC R301.2.1.4. EITHER REVISE EXPOSURE
 AND PRESSURES OR EXPLAIN RATIONALE (WITH AERIALS AND
 WRITTEN EXPLANATION) JUSTIFYING EXPOSURE B. NOTE THAT A
 LARGE PARK IS LOCATED WITHIN 1500' OF THIS JOB.
  
 THE INSTALLATION SCHEDULE IS AVAILABLE IN THE LOBBY OR
 ON THE INTERNET AT HTTP://WWW.CITYOFWPB.COM/CONSTRUCTIO
 N/PDF/SCHEDULE_FOR_INSTALLATION.PDF
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2009-10-19 Cont ID  
Sent By dpalmer Date 2009-10-19 Time 15:54 Rev Time 0.00
Received By dpalmer Date 2009-10-19 Time 15:54 Sent To B
Notes
2009-10-19 15:54:49TO SH'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2009-10-07 Cont ID  
Sent By shill Date 2009-10-07 Time 13:21 Rev Time 0.00
Received By shill Date 2009-10-05 Time 10:03 Sent To  
Notes
2009-10-06 10:04:16GAVE TO SAMANTHA