Plan Review Details - Permit 09100035
Plan Review Stops For Permit 09100035
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2009-10-07 Cont ID  
Sent By lmartine Date 2009-10-07 Time 10:14 Rev Time 0.00
Received By lmartine Date 2009-10-07 Time 10:14 Sent To  
Notes
2009-10-07 10:18:08****INTERIOR WORK ONLY****I SPOKE W/ CONTRACTOR,
 SEPARATE ELECTRICAL AND PLUMBING PERMITS WILL BE
 REQUIRED BEFORE COMMENCING WORK.
  
 L.MARTINEZ
 805-6710

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2009-10-07 Cont ID  
Sent By tmoore Date 2009-10-07 Time 09:22 Rev Time 0.00
Received By tmoore Date 2009-10-07 Time 09:21 Sent To I
Notes
2009-10-07 09:41:50PREINSPECT DENIED, SENT TO PLAN REVIEW.
2009-10-07 09:21:41MET OWNERS AT SITE. DISCUSSED THE NEED TO
 1) PULL AN ELECTRICAL PERMIT TO SAFE OFF BRANCH
 CIRCUITS IN THE AREAS PROPOSED TO BE DEMOLISHED.
 2) NO CUTTING IN TO NORTH WALL WITHOUT STRUCTURAL
 DETAILS AS TO HEADER REQUIREMENTS, JAMB PREPERATION,
 AND POSSIBLE SHORING IF TO BE LEFT UNFINISHED.
 3) ASBESTOS SURVEY MISSING FROM APPLICATION
  
 TOM AT 805-6669.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved