Plan Review Stops For Permit 09090597 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2010-02-19 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2010-02-19 |
Time |
08:36 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2010-02-19 |
Time |
08:36 |
Sent To |
|
|
Notes |
2010-02-19 08:38:01 | ORIGINAL BUILDING REVIEW DONE UNDER 09070567. PROVISO | | NOTES ATTACHED TO PLANS. | | WIND LOAD CALCULATIONS FOR POLES WIHT EFFECTIVE | | PROJECTED AREA OF LIGHT FIXTURES SHALL BE SUBMITTED | | BEFORE INSPECTION OF POLES. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2009-10-11 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2009-10-11 |
Time |
07:57 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2009-10-11 |
Time |
07:57 |
Sent To |
|
|
Notes |
2009-10-11 08:00:34 | TEMP FAILED | | | | ORIGINAL REVIEW DONE UNDER 09070567. BUILDING REVIEW | | GAVE PROJECT A PROVISO FOR SIGNED, DATED AND SEALED | | WIND LOAD POLE CALCULATIONS TO BE SUBMITTED BY A | | FLORIDA LICENSE PE. | | THESE WOULD INCLUDE CALCULATIONS SHOWING THE EFFECTIVE | | PROJECTED AREA OF FIXTURES COORDINATING WITH THE TYPE | | OF FIXTURES ON PLANS. | | ALL WIND LOADS SHALL MEET FBC 1605, 140MPH 3SECOND GUST | | (MINIMUM). |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2010-02-19 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2010-02-19 |
Time |
08:40 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2010-02-19 |
Time |
07:57 |
Sent To |
|
|
Notes |
2010-02-19 08:46:18 | ** PROVISO ** | | | | 1) NOTE: BUILDING PROVISO FOR SIGNED AND SEALED WIND | | LOAD CALCULATIONS PER BUILDING REVIEW. NOTES ATTACHED. | | | | 2) NOTE: LIGHTING SPECS CUT SHEETS FOR FIXTURE AND | | SHIELD ARE TO BE SUBMITTED. THE SPECS SUBMITTED VIA | | E-MAIL DID NOTE INCLUDE THE EHSS. (SHIELDS). | | LIGHTING LEVEL TESTING IS REQUIRED TO BE SUBMITTED | | BEFORE FINALS. THIS IS AT THE RISK OF CONTRACTOR. IF | | LIGHTING LEVELS EXCEED THE MAXIMUM LEVELS PERMITTED PER | | ZONING, ADJUSTMENT WILL BE REQUIRED. | | | | IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT | | TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO | | CONTACT THIS REVIEWER. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW II | | CONSTRUCTION SERVICES DEPARTMENT | | CITY OF WEST PALM BEACH | | 561-805-6717 | | [email protected] | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2009-10-11 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2009-10-11 |
Time |
07:57 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2009-10-11 |
Time |
07:46 |
Sent To |
|
|
Notes |
2009-10-11 07:57:37 | | | ** DENIED ** | | | | | | 1) NOTE: BASED ON ZONING REVIEW COMMENTS LOCATIONS OF | | FIXTURES, TYPES OF FIXTURES ETC WILL MOST LIKELY | | CHANGE. | | AS ALL INFORMATION IS ON ONE SHEET PLANS CAN NOT BE | | STAMPED AT THIS TIME. | | | | | | | | IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT | | TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO | | CONTACT THIS REVIEWER. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW II | | CONSTRUCTION SERVICES DEPARTMENT | | CITY OF WEST PALM BEACH | | 561-805-6717 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2010-02-09 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2010-02-09 |
Time |
11:01 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2010-02-09 |
Time |
10:57 |
Sent To |
|
|
Notes |
2010-02-17 10:19:07 | ******************EXPEDITED******************* | | FORM SUBMITTED ON 2/16/10 | 2010-02-09 11:02:48 | TO ZONING IN BOX./WRT. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2009-10-11 |
Time |
|
Rev Time |
0.00 |
Received By |
shill |
Date |
2009-09-29 |
Time |
10:34 |
Sent To |
|
|
Notes |
2009-09-29 10:34:19 | TO ZONING | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2010-02-17 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2010-02-17 |
Time |
09:03 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2010-02-17 |
Time |
09:03 |
Sent To |
|
|
Notes |
2010-02-17 09:03:45 | PROVISO: FPL TRANSFORMER AND MAIN ELECTRICAL PANEL | | SHALL BE SCREENED BY A HEDGE. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2009-10-09 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2009-10-09 |
Time |
14:54 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2009-10-09 |
Time |
14:54 |
Sent To |
|
|
Notes |
2009-10-09 16:07:50 | CITYPLACE IS A COMMERCIAL PLAN DEVELOPMENT AND SHALL | | COMPLY WITH PROVISION OF SECTION 94-207(D)(8) WICH | | STATES THAT ANY SOURCE OF ILLUMINATION LOCATED WITHIN A | | CPD SHALL NOT EXCEED ONE FOOTCANDLE AT OR BEYOND THE | | BOUNDARIES OF SUCH DEVELOPMENT. |
|
|