|
 |
 |
 |
 |
 |
Plan Review Details - Permit 09080073
Plan Review Stops For Permit 09080073 |
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2009-08-10 |
|
|
Cont ID |
|
Sent By |
efabian |
Date |
2009-08-10 |
Time |
14:42 |
Rev Time |
1.00 |
Received By |
efabian |
Date |
2009-08-10 |
Time |
15:00 |
Sent To |
|
|
Notes |
2009-08-10 14:59:47 | PASSED WITH (3) PROVISOS: | | | | 1. PROVIDE DOCUMENTATION TO CONFIRM ADEQUATE PRESSURE | | EXISTS FROM RECENT FLOW TEST IN EXISTING 4 INCH WATER | | MAIN IN THE ALLEY TO THE SYSTEM. | | | | 2. PROVIDE DRAWING OF PROPOSED CROSS CONNECTIONS | | THROUGH THE ALLEY BETWEEN THE 4 INCH WATER MAIN AND THE | | BUILDING, INCLUDING BY-PASS OF EXISTING UTILITIES IN | | THE ALLEY. | | | | 3. PROVIDE THE LOCATION OF THE D.D.C.V. IS BEHIND THE | | BUILDING AND ACCESSIBLE. | | | | | | PLEASE CONTACT THE REVIEWER WITH ANY QUESTIONS OR | | COMMENTS: | | | | EMERY P. FABIAN, PROJECT COORDINATOR | | CITY OF WEST PALM BEACH | | ENGINEERING SERVICES DEPARTMENT | | 401 CLEMATIS STREET, 4TH FLOOR | | WEST PALM BEACH FL 33401 | | (561)-494-1048 OFFICE | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2009-08-05 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2009-08-05 |
Time |
15:14 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2009-08-05 |
Time |
14:55 |
Sent To |
ENG |
|
Notes |
2009-08-17 11:46:57 | *****FIRE-STAMPED W/PROVISO | | | | | | PLAN SHEETS FP-1 AND FP-2 WERE FIRE-STAMPED ACCORDINGLY | | WITH ATTACHED PROVISO FROM BOTH FIRE AND ENGINEERING; | | READY FOR PERMIT ISSUANCE. | 2009-08-05 15:13:59 | 313 CLEMATIS STREET | | INSTALL NEW FIRE SPRINKLER SYSTEM IN EXISTING BUILDING | | | | 1. THE FIRE DEPARTMENT CONNECTION (FDC) SHALL BE | | EQUIPPED WITH KNOX LOCKING CAPS TO PREVENT VANDALISM OR | | THEFT. | | | | 2. A CHAIN AND LOCK IS REQUIRED ON THE BACKFLOW DEVICE. | | | | 3. THE ENTIRE BUILDING IS REQUIRED TO BE COMPLETELY | | FIRE SPRINKLER PROTECTED. THE INSTALLATION IS TO COMPLY | | WITH NFPA 13, THE STANDARD FOR THE INSTALLATION OF | | AUTOMATIC FIRE SPRINKLERS. | | | | 4. A SPARE SPRINKLER BOX, SPARE SPRINKLERS, AND WRENCH | | IS TO BE PROVIDED. | | | | 5. A GUAGE IS TO BE PROVIDED ON THE RISER. | | | | 6. THE ENTIRE FIRE SPRINKLER SYSTEM IS TO BE PRESSURE | | TESTED AT 200 PSIG FOR A MINIMUM OF AT LEAST TWO HOURS. | | | | 7. THE FIRE DEPARTMENT CONNECTION IS TO BE WITHIN 150 | | FEET OF A FIRE HYDRANT. | | | | 8. A FLOW TEST IS TO BE SCHEDULED AS SOON AS SOON | | POSSIBLE TO VERIFY STATIC AND RESIDENTIAL READINGS. | | | | 9. PLEASE SUBMIT CUT-SHEETS ON THE QUICK RESPONSE | | SPRINKLER HEADS PLANNED FOR USE. | | | | 10. ENSURE THAT HYDRAULIC CALCULATION PLATES AND VALVE | | SIGNS ARE INSTALLED. | | | | | | APPROVED PROVISO | | | | MIKE CARSILLO, BATTALION CHIEF | | BUREAU OFFIRE PREVENTION | | 804-4709 PHONE | | 804-4774 FAX |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |