Plan Review Stops For Permit 09070279 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2009-08-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2009-08-03 |
Time |
10:54 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2009-08-03 |
Time |
10:54 |
Sent To |
|
|
Notes |
2009-08-03 10:55:41 | REVISED INSTALLATION SCHEDULE | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2009-07-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2009-07-20 |
Time |
17:21 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2009-07-20 |
Time |
17:21 |
Sent To |
|
|
Notes |
2009-07-20 17:26:46 | ****PROVISO**** | | | | REVISION REQUIRED BEFORE INSPECTION | | | | 1. ALL OPENINGS, FLOOR CONNECTION, REQUIRE8.5" SPACING | | FOR SPANS 5' - 8'6", SPANS 8'6-MAX ALLOWED REQUIRE 6" | | ANCHOR SPACING. INSTALLATION SCHEDULE ANCHOR SPACING | | COLUMN IS TO BE REVISED TO REFLECT CORRECT REQUIRED | | ANCHOR SPACING. | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2009-07-24 |
|
|
Cont ID |
|
Sent By |
rregueir |
Date |
2009-07-24 |
Time |
16:43 |
Rev Time |
0.00 |
Received By |
rregueir |
Date |
2009-07-24 |
Time |
16:43 |
Sent To |
B |
|
Notes |
2009-07-24 16:43:48 | TO SHILL DESK |
|
|
|