2009-04-28 17:25:26 | 1515 DEMOLITION |
| 1515 SOUTH FLAGLER DRIVE |
| PHASE I FOR PERMITTING |
| |
| 1. ALL DEMOLITION ACTIVITIES SHALL COMPLY WITH NFPA |
| 241, THE STANDARD FOR SAFEGUARDING CONSTRUCTION, |
| ALTERATION, AND DEMOLITION OPERATIONS. |
| |
| 2. THE REMOVAL OF VERTICAL AND HORIZONTAL FIRE CUT-OFFS |
| FOR THE BUILDING SHALL REMAIN UNTIL THE END OF THE |
| DEMOLITION ACTIVITIES. BOTH EXIT STAIRS SHALL REMAIN |
| CLEAR AND USEABLE DURING THE DEMOLITION ACTIVITIES. |
| |
| 3. THE BUILDING DURING DEMOLITION ACTIVITIES WILL BE |
| CONSIDERED NON-SMOKING AND NO SMOKING PLANS SHALL BE |
| INSTALLED AND MAINTAINED DURING DEMOLITION ACTIVITIES. |
| |
| 4. ALL INTERIOR SHAFTWAYS SHALL BE ADEQUATELY PROTECTED |
| TO PREVENT PERSONS FROM FALLING INTO AN UNPROTECTED |
| SHAFT. SHAFTS SHALL BE PROPERLY IDENTIFIED. |
| |
| 5. GASOLINE POWERED GENERATORS SHALL NOT BE USED IN |
| ENCLOSED AREAS OF THE BUILDING DUE TO THE POSSIBILITY |
| OF CARBON MONOXIDE (CO) ACCUMULATION. CARBON MONOXIDE |
| IS A COLORLESS, ODORLESS, GAS THAT DISPLACES OXYGEN. |
| CARBON MONOXIDE CAN ALSO BE A FLAMMABLE MIXTURE IN THE |
| CORRECT CONCENTRATION. |
| |
| 6. THE EXISTING STANDPIPE SYSTEM SHALL REMAIN IN |
| SERVICE AS THE INTERIOR OF THE BUILDING IS BEING |
| DEMOLISHED. NO FIRE SPRINKLERS CURRENTLY EXIST AT THIS |
| LOCATION. |
| |
| 7. PORTABLE FIRE EXTINGUISHING EQUIPMENT SHALL BE |
| PROVIDED DURING DEMOLITION ACTIVITIES. |
| |
| 8. THE PLANS INDICATE THAT HANDRAILS AND GUARDRAILS ARE |
| TO BE REMOVED. TEMPORARY HANDRAILS AND GUARDRAILS ARE |
| NECESSARY IF THE PERMANENT ONES ARE REMOVED. |
| |
| 9. EMERGENCY CONTACT NUMBERS ARE TO BE PROVIDED TO THE |
| APPROPRIATE EMERGENCY SERVICES ORGANIZATIONS (ESO'S). |
| |
| 10. TRASH AND DEBRIS SHALL BE REMOVED DAILY FROM THE |
| SITE. |
| |
| 11. DID NOT LOCATE ANY UTILITY COMPANY SIGN-OFFS |
| RELATED TO THE DISCONNECTION OF SERVICES. |
| |
| 12. A FIRE SAFETY PLAN AND PROGRAM SHALL BE DOCUMENTED |
| TO THE APPROPRIATE EMERGENCY SERVICE ORGANIZATIONS |
| (ESO'S) |
| |
| 13. SUITABLE ACCESS WILL BE NECESSARY FOR THE |
| APPROPRIATE EMERGENCY SERVICE ORGANIZATIONS (ESO'S) |
| |
| 14. ALL EMERGENCIES ON THE SITE ARE TO BE REPORTED. |
| |
| 15. A COMMAND POST NEEDS TO BE ESTABLISHED SHOULD ANY |
| EMERGENCIES OCCUR ON THE SITE. |
| |
| 16. ALL ASBESTOS RELATED MATERIALS SHALL BE REMOVED, |
| HANDLED, AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, |
| STATE, AND LOCAL REQUIREMENTS. |
| |
| 17. THE PROPOSED IMPLOSION SHALL COMPLY WITH NFPA 495, |
| THE EXPLOSIVES MATERIALS CODE. AN INCIDENT ACTION PLAN |
| (IAP) SHALL BE DEVELOPED FOR THIS ACTIVITY. A UNIFIED |
| COMMAND SYSTEM AND INCIDENT COMMAND POST WILL BE |
| ESTABLISHED FOR THIS ACTIVITY. ALL REQUIREMENTS OF THE |
| VARIOUS CITY DEPARTMENTS SHALL BE MET PRIOR TO THIS |
| ACTIVITY RECEIVING FINAL APPROVAL. INSURANCE |
| CERTIFICATES NAMING THE CITY OF WEST PALM BEACH AND ITS |
| AGENTS AS ADDITIONAL INSURED SHALL BE SUBMITTED AS PART |
| OF THE OVERALL COMPREHENSIVE REQUEST PACKAGE. |
| SUFFICIENT PERSONNEL FROM THE APPROPRIATE EMERGENCY |
| SERVICE ORGANIZATIONS (ESO'S) WILL BE REQUIRED FOR |
| EMERGENCY STANDBY ACTIVITIES PRIOR TO, DURING AND AFTER |
| THE PROPOSED IMPLOSION SHOULD THIS ACTIVITY RECEIVE |
| FINAL APPROVAL. ALL APPROPRIATE SAFETY PROCEDURES AND |
| BENCHMARKS SHALL BE FOLLOWED. |
| |
| 18. ADDITIONAL MEETINGS WILL BE NECESSARY FOR ANY |
| PROPOSED IMPLOSION ACTIVITIES. |
| |
| 19. PROPER CLEARANCES TO COMBUSTIBLE MATERIALS SHALL BE |
| PROVIDED WHEN ANY CUTTING OR WELDING ACTIVITIES OCCUR. |
| |
| |
| MIKE CARSILLO, BATTALION CHIEF |
| BUREAU OF FIRE PREVENTION |
| 804-4709 PHONE |
| 804-4774 FAX |
| |