Plan Review Stops For Permit 09010445 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2009-02-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2009-02-03 |
Time |
06:36 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2009-02-03 |
Time |
06:36 |
Sent To |
|
|
Notes |
2009-02-03 06:38:03 | CONTRACTOR HAS ELECTED TO USE SHINGLES ON 2/12 SLOPE | | RATHER THAN TORCH DOWN |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2009-01-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2009-01-29 |
Time |
07:11 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2009-01-29 |
Time |
07:11 |
Sent To |
|
|
Notes |
2009-01-29 07:35:15 | 2004 FBC W/2007 REVISIONS | | REROOF 3/12 SLOPE AND FLAT | | | | DENIED BY BUILDING | | | | 1) SPECIFY WHICH ONE OF THE APPROVED ASSEMBLIES AND | | FASTENING OPTIONS LISTED IN THE GAF MODIFIED ROOF | | PRODUCT APPROVAL (07-1203.01) WILL BE INSTALLED. CIRCLE | | THE APPROPRIATE ITEMS ON THE NOA. | | | | 2) SUBMIT RAS 117 CALCULATIONS FOR ENHANCED FASTENING | | FROM AN ENGINEER, ARCHITECT OR REGISTERED ROOF | | CONSULTANT AS REQUIRED BY LIMITATION NUMBER 7 ON PAGE | | 30 OF THE GAF MODIFIED ROOF NOA. TWO SIGNED AND SEALED | | COPIES ARE REQUIRED. | | | | 3) A RECORDED COPY OF THE NOTICE OF COMMENCEMENT WILL | | BE REQUIRED. FS 713 | | | | ROBERT MC DOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|
|
|