Plan Review Details - Permit 08100660
Plan Review Stops For Permit 08100660
Review Stop E ELECTRICAL
Rev No 2 Status F Date 2009-02-04 Cont ID  
Sent By btrobaug Date 2009-02-04 Time 12:41 Rev Time 0.00
Received By btrobaug Date 2009-02-04 Time 10:15 Sent To PC
Notes
2009-02-04 10:30:08 
  
 THIS REVIEW WAS DONE UNDER THESE CURRENT CODE CYCLES:
  
 THE 2004 FLORIDA RESIDENTIAL BUILDING CODE, 2007
 REVISIONS, 2005 NEC, 2004 FBC AS AMENDED, CHAPTER 1.AND
 FOUND NONCOMPLIANT WITH THE FOLLOWING:
  
 1} THE ADDRESS ON THE PLAN DOES NOT MATCH THE ADDRESS
 ON THE APPLICATION, CORRELATE SAME. 106.1 FBC
  
 2} THE PLAN SUBMITTED DOES NOT SEEM TO BE THE SAME PLAN
 AS WAS SUBMITTED 11/14/08 AS THE COMMENTS MADE DO NOT
 RELATE TO THIS PLAN.SEE COMMENT #1.
  
 3} PLEASE LOCATE ALL SERVICE EQUIPMENT ON A SITE OR
 FLOOR PLAN, METER ENCLOSURE, DISCONNECTS AND PANELS, SO
 THAT COMPLIANCE WITH ARTICLES 225 AND 230 CAN BE
 REVIEWED. A DISCONNECT MAY BE REQUIRED PER
 230.70(A)(1).
  
 4} PER 110.9 AND 110.10: OBTAIN THE AVAILABLE FAULT
 CURRENT AT THE UTILITY AND CALCULATE THE SAME AT THE
 EQUIPMENT. INDICATE THE AIC RATING FOR THE EQUIPMENT IS
 EQUAL TO OR GREATER THAN THE AVAILABLE FAULT.*** THIS
 COMMENT IS MADE BECAUSE THE NEW PANEL WITH WOULD BE
 SUBJECT TO LINE FAULT CURRENT AS THE FIRST MEANS OF
 DISCONNECT.
  
 5} PROVIDE CONDUIT AND CONDUCTOR SIZE AND TYPE FOR THE
 EQUIPMENT TO BE INSTALLED.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 561/805-6718
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2008-11-18 Cont ID  
Sent By dpalmer Date 2008-11-18 Time 08:42 Rev Time 0.00
Received By dpalmer Date 2008-11-18 Time 08:42 Sent To PC
Notes
2008-11-18 08:43:03 
  
  
 ** FAILED REVIEW **
  
  
 1) NOTE: PLEASE INDICATE THE LOCATION OF THE PANEL.
 110.26,240.24, 408.36
  
 2) NOTE: PLANS SUBMITTED CONTAIN A TITLE BLOCK FROM AN
 ENGINEERING FIRM. PLANS MUST BE SIGNED, DATED AND
 SEALED FORM THAT ENGINEERING FIRM PER FS 471.025, FAC
 61G15-23.002.
  
 3) NOTE: MISSING EQUIPMENT GROUNDING AFTER THE FIRST
 MEANS OF DISCONNECT PER 250.110,250.122.
  
 4) NOTE: NEEDS TO HAVE TWO GROUND RODS. 250.50, 250.56
  
 5) NOTE: RISER INDICATES AN OVER HEAD SERVICE HOWEVER
 THE NOTE ON RISER MENTIONS TO BASE OF POLE WHICH WOULD
 LEND TO AN UNDERGROUND SERVICE.
 PLEASE COORDINATE WHICH ONE IT WILL BE AND REVISE AS
 NEEDED.
  
 **IMPORTANT**
 ONCE AUDIT/REVIEWS ARE COMPLETE AND PLANS ARE PICKED UP
 FOR CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE
 ALL OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING.
 DO NOT LEAVE ANY OLD/VOIDED SHEETS IN SETS.
 PLEASE DO NOT ATTACH SUPPORTING DOCUMENTS TO PLANS. ANY
 ADDITIONAL DOCUMENTATION SUCH AS PRODUCT APPROVALS,
 SPEC/CUT SHEETS, CALCULATIONS ETC. SHOULD BE PLACED
 INTO TWO SETS/FOLDERS/BINDERS ETC.
 PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE.
 THIS WILL HELP IN THE AUDIT/REVIEW PROCESS AND AVOID
 ANY DELAYS.
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  