Plan Review Stops For Permit 08100212 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2008-10-11 |
|
|
Cont ID |
|
Sent By |
amorse |
Date |
2008-10-11 |
Time |
07:53 |
Rev Time |
0.50 |
Received By |
amorse |
Date |
2008-10-11 |
Time |
07:53 |
Sent To |
PC |
|
Notes |
2008-10-11 08:02:35 | | | | | PASSED | | | | 1) PLEASE BE AWARE THAT A CHANGE WAS MADE TO THE ON | | CENTER SPACING OF FASTENERS FOR OPENING #2, SEE SHEET | | 13 IN DRAWINGS. IF THIS IS INDEED A "D" CONNECTION 7" | | WOULD BE REQUIRED BUT JUDGING ON THE OPENING (FRONT | | ENTRY) IT MAY BE A DOOR AND THE "I" CONNECTION AS USED | | ON OPENING 10 COULD BE USED AND THE 9" THAT WAS | | ORIGINALLY STATED WOULD BE OK. | | | | BLDG PLAN REVIEW | | ADRIAN MORSE | | 561-805-6716 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2008-10-11 |
Time |
|
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2008-10-10 |
Time |
08:35 |
Sent To |
|
|
Notes |
2008-10-10 08:35:58 | TO "MISC"BOX#1 |
|
|
|