Plan Review Details - Permit 08100178
Plan Review Stops For Permit 08100178
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2008-12-17 Cont ID  
Sent By shill Date 2008-12-17 Time 16:04 Rev Time 0.00
Received By shill Date 2008-12-17 Time 16:04 Sent To  
Notes
2008-12-17 16:37:33****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
  
 FBC FLORIDA BUILDING CODE 2004
 FBC EB FLORIDA BUILDING CODE 2004 EXISTING BUILDING
 CODE
 FBC R FLORIDA BUILDING CODE 2004 RESIDENTIAL
 FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004
 FAC FLORIDA ADMINISTRATIVE CODE
 FS FLORIDA STATUTE
  
 FROM PREVIOUS LIST:
  
 1. USE OF REMOVABLE IMPACT PROTECTION ON COMMERCIAL
 BUILDINGS IS TO BE APPROVED BY THE BUILDING OFFICIAL
 THROUGH A PRESTORM PREPARATION PLAN; SEE WIND-BORNE
 DEBRIS IMPLEMENTATION STANDARD, ITEM 13. IMPACT ON THE
 SECOND FLOOR IS GENERALLY REQUIRED. HTTP://WWW.CITYOFWP
 B.COM/CONSTRUCTION/PDF/WIND-BORNE_DEBRIS_IMPLEMETATION.
 PDF
  
 2ND REVIEW - A PRESTORM PREPARATION PLAN WAS SUBMITTED.
 PLEASE REVISE AS FOLLOWS:
  
 A. THE PLAN IS TO BE SIGNED BY THE OWNER.
  
 B. THE PLAN STATES THAT THIS IS A SINGLE FAMILY
 RESIDENCE. A SITE VISIT HAS BEEN DONE; THERE ARE FOUR
 ELECTRIC SERVICES TO THIS ADDRESS. THIS APPEARS TO BE
 MULTI FAMILY, CONSISTENT WITH PAPA RECORDS. PLEASE
 REVISE OR CONTACT ME TO RESOLVE THIS INCONSISTENCY.
  
 C. THE PLAN STATES THAT THE SHUTTERS WILL BE INSTALLED
 BY THE OWNER, HER HUSBAND, AND "ANY OTHERS THEY DEEM
 NECESSARY". PROVIDE CONTRACTS OR OTHER DOCUMENTATION
 FOR THE OTHER INDIVIDUALS. PROVISIONS MUST BE MADE IN
 THE EVENT THAT THE OWNER IS ON VACATION, ILL, OR
 OTHERWISE UNABLE TO DO THE INSTALLATION.
  
 D. WHO HAS ACCESS TO THE GARAGE WHERE THE SHUTTERS WILL
 BE STORED? HOW WILL THEY BE SECURED FROM THEFT?
  
 E. THE PLAN STATES THAT SHUTTESR WILL BE INSTALLED
 "UPON NOTIFICATION OF AN APPROACHING HURRICANE". THERE
 IS VERY SPECIFIC LANGUAGE IN ITEM #13 REGARDING
 INSTALLATION; THE OWNER MUST AGREE TO INSTALL THE
 SHUTTERS WITHIN OR EXCEEDING THESE PARAMETERS.
  
 F. THE PLAN SUBMITTED STATES THAT SHUTTERS WILL BE
 INSTALLED ON THE SECOND FLOOR. PER CONTRACTOR
 INFORMATION, PLEASE REVISE THIS AS IT IS MY
 UNDERSTANDING THAT IMPACT WILL BE INSTALLED ON THE
 SECOND FLOOR.
  
 THE PLAN CAN BE SUBMITTED FOR PRELIMINARY REVIEW VIA
 EMAIL, [email protected].
  
 2. IF USE OF REMOVABLE STORM PANELS IS APPROVED, AN
 INSTALLATION SCHEDULE IS REQUIRED TO DEMONSTRATE
 COMPLIANCE WITH FBC R301 (WIND). TWO SETS REQUIRED. HTT
 P://WWW.CITYOFWPB.COM/CONSTRUCTION/PDF/SCHEDULE_FOR_INS
 TALLATION.PDF
  
 2ND REVIEW, PLEASE REVISE THE INSTALLATION SCHEDULE AS
 SHUTTERS WILL BE INSTALLED ON THE FIRST FLOOR ONLY.
  
 3. ELECTRIC PERMIT REQUIRED. THIS IS REQUIRED PRIOR TO
 ISSUANCE OF THIS PERMIT.
  
 4. THE PERMIT APPLICATION SCOPE INCLUDES REPAIR OF A
 STAIRWAY. PLEASE NOTE LOCATION AND SCOPE (2 PLANKS PER
 CONTRACTOR) ON THE FLOOR PLAN SO THAT THIS ALTERATION
 CAN BE INCLUDED IN THIS PERMIT PACKAGE. FIRST REVIEW
 REQUESTED A DETAIL; DUE TO LIMITED SCOPE THIS WILL NOT
 BE REQUIRED BUT THE PLAN NEEDS TO BE REVISED TO NOTE
 THE WORK PROPOSED AS WELL AS THE LIMITATION IN SCOPE.
  
 5. DECLARE GOVERNING CODE, INCLUDING 2007
 REVISIONS/SUPPLEMENTS.
  
 2ND REVIEW, RESPONSE LETTER STATES "SEE ATTACHED
 LETTER". NO LETTER ATTACHED, BUT THIS NEEDS TO BE
 INCORPORATED INTO THE ENGINEER'S PLAN. PLEASE REVISE.
  
 6. DECLARE WIND DESIGN CRITERIA, FBC R301.
  
 2ND REVIEW, RESPONSE LETTER STATES 'SEE ATTACHED
 DOCUMENT". THIS NEEDS TO BE INCORPORATED INTO THE
 ENGINEER'S DESIGN. THE WIND LOAD CHARTS PROVIDED WERE
 PREPARED BY A DIFFERENT ENGINEER. THE ENGINEER WHO
 PREPARED THE DRAWINGS IS REQUIRED TO STATE HIS WIND
 DESIGN CRITERIA FBC R301.
  
 7. DECLARE LEVEL OF ALTERATION FBC EB 301.5.
  
 2ND REVIEW, RESPONSE LETTER ANSWERED THE QUESTION BUT
 THIS NEEDS TO BE INCORPORATED INTO THE PLAN. RESPONSE
 LETTERS ARE USEFUL IN EXPEDITING PLAN REVIEW BUT DO NOT
 IN THEMSELVES SHOW CODE COMPLIANCE AS THEY ARE NOT A
 PART OF THE PERMIT PACKAGE.
  
 8. STRUCTURAL DETAILS PREPARED BY AN ENGINEER WERE
 SUBMITTED. THIS IS NOT INCLUDED IN THE SCOPE OF WORK ON
 THE APPLICATION. IT IS NOT CLEAR WHY THESE DETAILS HAVE
 BEEN PROVIDED. THE DETAIL STATES THAT THE 2X4 IS "AS
 NEEDED FOR REINFOCEMENT". REINFORCEMENT - STRUCTURAL
 FOR THE WALL, OR BLOCKING FOR THE DRYWALL? THE
 APPLICATION STATES "REPAIR SHEETROCK FOR UPDATED
 ELECTRICAL". CLARIFY EXTENT OF DRYWALL REPAIR.
  
 PLEASE REVISE PLAN TO ADDRESS THE COMMENT.
  
 9. INSULATION IS NOT SHOWN, WALL AND TENANT SEPARATION
 (FLOOR/CEILING), FBC13. AS SCOPE IS NOT CLEAR,
 COMPLIANCE AND REQUIREMENTS NOT CLEAR AT THIS TIME.
  
 2ND REVIEW, PLEASE SUBMIT PLANS TO SHOW SCOPE OF WORK
 FBC*106.
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2008-10-16 Cont ID  
Sent By shill Date 2008-10-16 Time 09:21 Rev Time 0.00
Received By shill Date 2008-10-16 Time 09:21 Sent To  
Notes
2008-10-16 09:23:00****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
  
 FBC FLORIDA BUILDING CODE 2004
 FBC EB FLORIDA BUILDING CODE 2004 EXISTING BUILDING
 CODE
 FBC R FLORIDA BUILDING CODE 2004 RESIDENTIAL
 FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004
 FAC FLORIDA ADMINISTRATIVE CODE
 FS FLORIDA STATUTE
  
 1. USE OF REMOVABLE IMPACT PROTECTION ON COMMERCIAL
 BUILDINGS IS TO BE APPROVED BY THE BUILDING OFFICIAL
 THROUGH A PRESTORM PREPARATION PLAN; SEE WIND-BORNE
 DEBRIS IMPLEMENTATION STANDARD, ITEM 13. IMPACT ON THE
 SECOND FLOOR IS GENERALLY REQUIRED. HTTP://WWW.CITYOFWP
 B.COM/CONSTRUCTION/PDF/WIND-BORNE_DEBRIS_IMPLEMETATION.
 PDF
  
 THIS DOCUMENT IS ALSO AVAILABLE IN THE LOBBY OF
 CONSTRUCTION SERVICES.
  
 2. IF USE OF REMOVABLE STORM PANELS IS APPROVED, AN
 INSTALLATION SCHEDULE IS REQUIRED TO DEMONSTRATE
 COMPLIANCE WITH FBC R301 (WIND). TWO SETS REQUIRED. HTT
 P://WWW.CITYOFWPB.COM/CONSTRUCTION/PDF/SCHEDULE_FOR_INS
 TALLATION.PDF
  
 3. THE ELECTRIC PERMIT 07010976 FOR THIS PROPERTY (AND
 ASSOCIATED WITH WORK FOR THIS PERMIT), IS EXPIRED.
 PLEASE ADVISE AS TO STATUS. NOTE THAT THIS IS AN
 APPLICATION TO REPAIR SHEETROCK ASSOCIATED WITH THE
 ELECTRIC PERMIT.
  
 4. THE PERMIT APPLICATION SCOPE INCLUDES REPAIR OF A
 STAIRWAY. PROVIDE A STRUCTURAL DETAIL AND SITE PLAN
 WHICH CLEARLY SHOWS SCOPE, LOCATION, AND METHOD OF
 REPAIR, FBC*106, FBC R301.
  
 5. DECLARE GOVERNING CODE, INCLUDING 2007
 REVISIONS/SUPPLEMENTS.
  
 6. DECLARE WIND DESIGN CRITERIA, FBC R301.
  
 7. DECLARE LEVEL OF ALTERATION FBC EB 301.5.
  
 8. STRUCTURAL DETAILS PREPARED BY AN ENGINEER WERE
 SUBMITTED. THIS IS NOT INCLUDED IN THE SCOPE OF WORK ON
 THE APPLICATION. IT IS NOT CLEAR WHY THESE DETAILS HAVE
 BEEN PROVIDED. THE DETAIL STATES THAT THE 2X4 IS "AS
 NEEDED FOR REINFOCEMENT". REINFORCEMENT - STRUCTURAL
 FOR THE WALL, OR BLOCKING FOR THE DRYWALL? THE
 APPLICATION STATES "REPAIR SHEETROCK FOR UPDATED
 ELECTRICAL". CLARIFY EXTENT OF DRYWALL REPAIR.
  
 9. INSULATION IS NOT SHOWN, WALL AND TENANT SEPARATION
 (FLOOR/CEILING), FBC13. AS SCOPE IS NOT CLEAR,
 COMPLIANCE AND REQUIREMENTS NOT CLEAR AT THIS TIME.
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2008-12-05 Cont ID  
Sent By adarroug Date 2008-12-05 Time 11:01 Rev Time 0.00
Received By adarroug Date 2008-12-05 Time 11:01 Sent To B
Notes
2008-12-05 11:01:51TO "SHILL" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2008-10-16 Cont ID  
Sent By shill Date 2008-10-16 Time 15:22 Rev Time 0.00
Received By shill Date 2008-10-08 Time 16:46 Sent To  
Notes
2008-10-08 16:47:19TO "MISC" BOX#1