Plan Review Details - Permit 08080446
Plan Review Stops For Permit 08080446 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2008-08-29 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2008-08-29 |
Time |
11:32 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2008-08-29 |
Time |
11:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2008-08-29 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2008-08-29 |
Time |
08:24 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2008-08-29 |
Time |
08:24 |
Sent To |
PC |
|
Notes |
2008-08-29 08:29:23 | RESIDENTIAL (R3) SHUTTERS BUILDING REVIEW SECOND | | CHECKLIST. | | REVIEW UNDER FBC 2004 WITH 2007 REVISIONS. | | | | 1- REQUESTED INSTALLATION SCHEDULE WAS NOT SUBMITTED. | | NEED TO PROVIDE COMPLETE INSTALLATION SCHEDULE OR ANY | | OTHER FORMAT THAT WILL ALLOW TO VERIFY COMPLIANCE WITH | | THE PROPOSED INSTALLATION AND LIMITATION OF PRODUCT | | APPROVAL. SEC. 106.1.2 CITY AMENDMENTS TO FBC 2004 TO | | VERIFY COMPLIANCE WITH DESIGN LOADS OF SEC. R301 OF | | 2004 FLORIDA RESIDENTIAL CODE. | | | | JULIO GOMEZ | | BUILDING PLANS EXAMINER | | (561)805-6712 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2008-08-26 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2008-08-26 |
Time |
09:58 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2008-08-26 |
Time |
09:57 |
Sent To |
PC |
|
Notes |
2008-08-26 10:12:45 | RESIDENTIAL (R3) SHUTTERS, BUILDING REVIEW CHECKLIST. | | | | REVIEW UNDER FBC 2004 WITH 2007 REVISIONS. | | | | 1- THERE ARE TWO DIFFERENTDESIGN PRESSURES | | CALCULATIONSSUBMITTEDBY TWO DIFFERENT ENGINEERS. | | PROVIDE TWO COPIES OF ENGINEERING CALCULATIONS FROM ONE | | ENGINEER ONLY. | | NOTE: ENGINEERCALCULATIONS ARE NOT REQUIRED. | | CONTRACTORMAY USE TABLE R301.2(2) OF 2004 FLORIDA | | RESIDENTIALCODE TO OBTAIN THE DESIGN PRESSURES. | | | | 2- PROVIDE A COMPLETE INSTALLATION SCHEDULE AS REQUIRED | | BYTHE CITY IMPLEMENTATION STANDARD FOR WIND-BORNE | | DEBRIS IMPACT PROTECTION.SEE ATTACHED SAMPLE. | | ***NOTE:WHEN FILLING UPTHE INSTALLATION SCHEDULE | | MAKE SURE CORRECT ANCHOR SCHEDULE IS REFERENCED.FOR | | EXAMPLE, CONCRETE ANCHOR SCHEDULE MAY NOT BE USED FOR | | CONCRETE BLOCK CONSTRUCTION UNLESS PROPER TESTING IS | | PROVIDED SHOWING THATTHE SUBSTRATETORECEIVE THE | | ACCORDIONSHUTTERS IS POURED CONCRETE WITH MIN. 3,100 | | PSI STRENGTH. | | | | JULIO GOMEZ | | BUILDING PLAN EXAMINER | | (561)805-6712 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2008-08-26 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2008-08-26 |
Time |
10:28 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2008-08-26 |
Time |
09:58 |
Sent To |
|
|
Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |