Plan Review Stops For Permit 08040209 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
|
Date |
2008-04-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2008-04-25 |
Time |
17:11 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2008-04-25 |
Time |
17:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2008-04-09 |
|
|
Cont ID |
|
Sent By |
kconrad |
Date |
2008-04-09 |
Time |
15:24 |
Rev Time |
0.00 |
Received By |
kconrad |
Date |
2008-04-09 |
Time |
15:24 |
Sent To |
|
|
Notes |
2008-04-09 15:28:55 | MET WITH ROOFING CONTRACTOR TO VERIFY EXISTING ROOF | | SYSTEM. (PRE-INSPECT) A ROOFING CORE WAS PERFORMED. | | ADVISED THE CONTRACTOR THAT LIMITATIONS #1 AND #2 OF | | THE SUBMITTED NOA SHALL BE SATISFIED. THE PERMIT | | APPLICATION AND DOCUMENTATION WAS GIVEN BACK TO THE | | CONTRACTOR. HE WILL RESUBMIT FOR PLAN REVIEW WHEN HE | | OBTAINS THE ADDTIONAL INFORMATION AS REQUESTED. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2008-04-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2008-04-25 |
Time |
17:10 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2008-04-22 |
Time |
15:06 |
Sent To |
|
|
Notes |
2008-04-25 15:06:17 | TO "SHILL" DESK/RESUB |
|
|
|