2007-11-16 10:49:34 | FAILED FOR FOLLOWING REASONS: |
| |
| 1. DUMPSTER LOCATION MUST BE ACCESSIBLE FOR PICKUP |
| TRUCK. |
| 2. PLEASE SHOW ON CALCULATION THAT YOU HAVE CONSIDERED |
| FLOOD ZONE AREA, & 5,10, 25, 100 YEAR FLOOD CRITERIA |
| AND CROWN OF THE ROAD WHEN YOU DETERMINE THE FIRST |
| FLOOR ELEVATION. |
| 3. PLEASEMAKE SURE THESE AREAS SHOWN ON DRAINAGE |
| DRAWINGS MUST MATCH WITH AND USED IN STORM WATER |
| QUALITY CALCULATIONS. PLEASE PROVIDE A COPY OF THESE |
| CALCULATIONS. |
| 4. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE |
| SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM |
| ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE |
| CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING |
| ELEVATION, ETC ON DRAWINGS, CALCULATION FOR |
| EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET |
| DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL |
| THESE. |
| 5. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET |
| FLOODED AND HAVE ENOUGH DRAINS. |
| 6. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, &STORM |
| WATER QUALITY CALCULATIONS. STORM WATER CALS MUST BE |
| APPROVED FROM 100045TH STREET ENGINEERING SERVICES. |
| 7. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION |
| PLAN SHOWING SILT FENCE AROUND THE SITE & CATCH BASINS |
| DURING CONSTRUCTION AND ALL DEMOLITION PHASE.HEIGHT |
| OF FENCE SHOULD BE HIGH ENOUGH PER FDEP TO STOP DUST |
| PARTICLES. |
| 8. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED. |
| 9. YOUR PLANS NOT ORIGINALLY SIGNED & SEALED.PLANS |
| MUST BE SEAL & SIGNED BY FLORIDA P.E. |
| |
| PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| PERMITTING PROCESS |
| |
| RASIK CHOKSHI805-6723 |