Plan Review Details - Permit 07080660
Plan Review Stops For Permit 07080660
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2007-10-03 Cont ID  
Sent By mperson Date 2007-10-03 Time 14:35 Rev Time 0.00
Received By mperson Date 2007-10-03 Time 14:35 Sent To PC
Notes
2007-10-03 14:38:29****************PROVISO****************
 A} PER FBC-2004 FUEL GAS, SECTION 409.4 MP REGULATOR
 VALVES: A LISTED SHUTOFF VALVE SHALL BE INSTALLED
 IMMEDIATELY AHEAD OF EACH MP REGULATOR.
  
 B) FBC-2004 FUEL GAS SEC. 404.12 OUTLET
 CLOSURES: GAS OUTLETS THAT DO NOT CON-
 NECT TO APPLIANCES SHALL BE CAPPED GAS
 TIGHT.
  
 REVIEW BY: MIKE PERSON
 PLUMBING PLANS EXAMINER
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL: [email protected]

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2007-09-13 Cont ID  
Sent By mperson Date 2007-09-13 Time 08:44 Rev Time 0.00
Received By mperson Date 2007-09-13 Time 08:44 Sent To PC
Notes
2007-09-13 09:04:01DENIED
 REFERENCE:
 ** FBC-2004 FUEL GAS WITH 2006 REVISIONS.
 ** THE CITY OF WEST PALM BEACH GAS PERMIT APPLICATION
 REQUIREMENTS.
 ** FBC-2004 CHAPTER 1, THE CITY OF
 WEST PALM BEACH AMENDMENTS.
 ** FLORIDA ADMINISTRATIVE CODE.
 ** FLORIDA STATUTES.
  
 THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR
 GAS PLAN REVIEW TO MEET CODE COMPLIANCE:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
 NOTE: NOT ALL CUT SECTIONS OF PIPE ARE INDICATING THE
 CORRESPONDING LENGTHS.
  
 2. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 NOTE: PLEASE INDICATE THE PRESSURE FROM THE METER TO
 THE 2ND STAGE REGULATOR. WOULDN'T THE METER REDUCE THE
 PRESSURE? PLEASE CLARIFY THIS ON THE RESUBMITTAL.
  
 3. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 NOTE: NEED MANUFACTURER SPECIFICATION CUT SHEET OF THE
 2ND STAGE REGULATOR INDICATING THE MAKE, MODEL NUMBER,
 BTU LOAD CAPACITY AND A LISTING FROM A NATIONALLY
 RECOGNIZED TESTING LABORATORY (NRTL).
  
 4. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
  
 5. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 6.1.1.
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 PLUMBING PLANS EXAMINER
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL: [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2007-09-18 Cont ID  
Sent By adarroug Date 2007-09-18 Time 12:11 Rev Time 0.00
Received By adarroug Date 2007-09-18 Time 12:11 Sent To G
Notes
2007-09-18 12:12:24TO "G" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2007-09-13 Cont ID  
Sent By mperson Date 2007-09-13 Time 09:04 Rev Time 0.00
Received By mperson Date 2007-08-24 Time 14:17 Sent To  
Notes
2007-08-24 14:17:44TO "G" BOX