Plan Review Details - Permit 07080029
Plan Review Stops For Permit 07080029
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2008-02-27 Cont ID  
Sent By shill Date 2008-02-27 Time 09:14 Rev Time 0.00
Received By shill Date 2008-02-27 Time 09:14 Sent To  
Notes
2008-02-27 09:15:18REVISION OK

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2008-02-11 Cont ID  
Sent By shill Date 2008-02-11 Time 11:51 Rev Time 0.00
Received By shill Date 2008-02-11 Time 11:51 Sent To  
Notes
2008-02-11 11:52:49****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
  
 FBCFLORIDA BUILDING CODE 2004
 FBC EBFLORIDA BUILDING CODE 2004 EXISTING BUILDING
 CODE
 FBC RFLORIDA BUILDING CODE 2004 RESIDENTIAL
 FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004
  
 FAC FLORIDA ADMINISTRATIVE CODE
 FSFLORIDA STATUTE
  
  
 1.SHUTTER CONNECTION MOUNTING TYPE SHOULD CORRELATE
 WITH THE ANCHOR SCHEDULE ON THE PRODUCT APPROVAL; IN
 THIS CASE, C1 THROUGH C3.NOTE THAT THE ANCHORING
 SPECIFIED IS NOT COMPLIANT FOR ALL CONNECTION TYPES.
 ALSO NOTE THAT "SCHEDULE 3" IS REFERENCED, BUT IT
 APPEARS THAT YOU WILL BE USING SCHEDULE 2 (FOR CONCRETE
 SUBSTRATE).
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2007-08-06 Cont ID  
Sent By shill Date 2007-08-06 Time 17:08 Rev Time 0.00
Received By shill Date 2007-08-06 Time 17:08 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2007-08-01 Cont ID  
Sent By shill Date 2007-08-01 Time 10:11 Rev Time 0.00
Received By shill Date 2007-08-01 Time 10:11 Sent To  
Notes
2007-08-01 10:17:30****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
  
 FBCFLORIDA BUILDING CODE 2004
 FBC EBFLORIDA BUILDING CODE 2004 EXISTING BUILDING
 CODE
 FBC RFLORIDA BUILDING CODE 2004 RESIDENTIAL
 FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004
 FAC FLORIDA ADMINISTRATIVE CODE
 FSFLORIDA STATUTE
  
  
 1.)YOU HAVE STATED THAT THE SUBSTRATE ISCBS, BUT
 HAVE USED THE CHART FOR CONCRETE.YOU MUST USE ANCHOR
 SCHEDULE 3 FOR A BLOCK SUBSTRATE (FILLED CELL OR HOLLOW
 BLOCK).CONCRETE IS FOR A POURED CONCRETE SUBSTRATE
 ONLY (LINTEL, TIE BEAM, POURED SILL).PLEASE REVISE.
  
  
 2.)PLEASE PROVIDE TWO SETS OF ALL PERMIT DOCUMENTS.
 ONLY ONE INSTALLATION SCHEDULE WAS PROVIDED.
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2008-02-26 Cont ID  
Sent By adarroug Date 2008-02-26 Time 16:10 Rev Time 0.00
Received By adarroug Date 2008-02-26 Time 16:10 Sent To B
Notes
2008-02-26 16:12:07TO "SHILL" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2008-02-20 Cont ID  
Sent By adarroug Date 2008-02-20 Time 09:30 Rev Time 0.00
Received By adarroug Date 2008-02-20 Time 09:30 Sent To B
Notes
2008-02-20 09:30:57TO "SHILL" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2008-02-01 Cont ID  
Sent By adarroug Date 2008-02-01 Time 14:34 Rev Time 0.00
Received By adarroug Date 2008-02-01 Time 14:34 Sent To B
Notes
2008-02-01 14:34:28TO "LMARTINEZ" DESK/REV