Plan Review Details - Permit 07050010
Plan Review Stops For Permit 07050010
Review Stop G GAS REVIEW
Rev No 1 Status P Date 2007-05-07 Cont ID  
Sent By mperson Date 2007-05-07 Time 11:48 Rev Time 0.45
Received By mperson Date 2007-05-07 Time 11:47 Sent To PC
Notes
2007-05-07 11:56:29****************PROVISO*****************
 A} PER FBC-2004 FUEL GAS, SECTION 409.4 MP REGULATOR
 VALVES: A LISTED SHUTOFF VALVE SHALL BE INSTALLED
 IMMEDIATELY AHEAD OF EACH MP REGULATOR.
  
 B} PER FBC-2004 FUEL GAS, SECTION 404.13.3AN
 INSULATED COPPER TRACER WIRE SHALL BE INSTALLED
 ADJACENT TO UNDERGROUND NONMETALLIC GAS PIPING. THE
 TRACER WIRE SIZE SHALL NOT BE LESS THAN 18 AWG AND THE
 INSULATION TYPE SHALL BE SUITABLE FOR DIRECT BURIAL.
  
 C} PER FBC-2004 FUEL GAS SECTION 408.4 A SEDIMENT TRAP
 SHALL BE INSTALLED DOWNSTREAM OF THE EQUIPMENT SHUTOFF
 VALVE AS CLOSE TO THE INLET OF THE EQUIPMENT AS
 PRACTICAL.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2007-05-07 Cont ID  
Sent By mperson Date 2007-05-07 Time 11:57 Rev Time 0.00
Received By mperson Date 2007-05-02 Time 16:02 Sent To  
Notes
2007-05-02 16:02:25TO "G" BOX