Plan Review Stops For Permit 07040115 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2007-06-27 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2007-06-27 |
Time |
13:07 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2007-06-27 |
Time |
13:07 |
Sent To |
|
|
Notes |
2007-06-27 13:08:25 | REVISED SHEETS 1 AND 2 ARE OK. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2007-06-15 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2007-06-15 |
Time |
14:34 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2007-06-15 |
Time |
14:34 |
Sent To |
|
|
Notes |
2007-06-15 14:50:18 | REVISIONS TO SHEETS 1 AND 2 ARE DENIED | | | | 1) MOST OF THE CHANGES THAT WERE MADE ARE NOT | | IDENTIFIED BY CLOUDING AND NUMBERING. SEE RED MARKS ON | | THE RETURNED PLAN. | | | | 2) ON SHEET 1 THE ELEVATION TO THE TOP OF THE BOND BEAM | | WAS CHANGED TO 9'-0" IN TWO PLACES AND LEFT AT 9'-5" IN | | THE OTHER TWO. PLEASE CORRECT. | | | | 3) SPECIFY THE FL NUMBERS FOR THE LINTELS AND TRUSS | | ANCHORS ON THE PLANS. | | | | 4) ON SHEET 2 THE WRONG CODE SECTION IS SPECIFIED FOR | | NUMBER 1 UNDER PRE-ENGINEERED WOOD TRUSSES. IT SHOULD | | BE R 802.1.6. | | | | 5) THE UPLIFT AND ANCHOR SPECIFIED FOR THE GIRDER TRUSS | | IS NOT ADEQUATE. SEE COMMENTS FOR TRUSS DRAWING | | SUBMITTALS. | | | | IN ORDER TO SPEED PLAN REVIEW, PLEASE RETURN THE DENIED | | REVISED PAGES THAT WERE REDLINED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2007-06-14 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2007-06-14 |
Time |
16:31 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2007-06-14 |
Time |
16:31 |
Sent To |
|
|
Notes |
2007-06-15 11:20:14 | TRUSS LAYOUT AND DRAWINGS IS DENIED | | | | 1) THE TRUSS LAYOUT IS REQUIRED TO BE SIGNED AND SEALED | | BY THE TRUSS ENGINEER AND REVIEWED AND APPROVED IN | | WRITING BY THE DESIGNER OF RECORD FOR THE STRUCTURE. | | FAC 61G-15-23.002 AND FS471. | | | | 2) THE TRUSS DRAWING COVER SHEET IS REQUIRED TO BE | | SIGNED BY THE TRUSS ENGINEER. A SIGNATURE STAMP IS NOT | | ACCEPTABLE. FAC 61G-15-23.002 AND FS471. | | | | 3) THE UPLIFT FOR THE 2 PLY GIRDER (A05)TRUSS IS -2366 | | PSF WHICH EXCEEDS THE CAPACITY OF THE HETAL 20 | | SPECIFIED ON THE PLANS. SUBMIT REVISED ROOF FRAMING | | PLANS. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2007-05-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2007-05-02 |
Time |
07:45 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2007-05-02 |
Time |
06:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2007-04-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2007-04-19 |
Time |
07:59 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2007-04-19 |
Time |
07:59 |
Sent To |
|
|
Notes |
2007-04-19 08:31:03 | DENIED BY BUILDING | | | | 1) THE WALL SECTION ON SHEET 1 SHOWS A 3'-9" OVERHANG | | AND THE ELEVATIONS SPECIFY 2'-0". PLEASE CORRECT. | | | | 2) ON SHEET 2 UNDER PREFABRICATED TRUSS NOTES, NUMBER 1 | | REFERS TO FBC 2309. THIS SECTION IS NO LONGER USED IN | | THE 2004 FBC. PLEASE REVISE. | | | | 3) ON SHEET THE ROOF SHEATHING IS REQUIRED TO BE | | FASTENED WITH RING SHANK NAILS. SEE LATEST REVISIONS TO | | 2004 FBC RESIDENTIAL CODE SECTION R803.2.3.1. | | | | 4) ON SHEET 2 THERE IS A TYPO ON SHEET 2 ON THE | | SHEATHING FASTENING NOTES. "CDK" PLYWOOD IS SPECIFIED | | AND IT SHOULD BE CDX. | | | | 5) SPECIFY THE ATTACHMENT FOR THE CONCRETE ROOF TILE. | | CIRCLE THE FASTENER TYPE OR ADHESIVE THAT WILL BE USED | | ON THE NOA. MAKE SURE THAT THE ATTACHMENT RESISTANCE | | FOR THE ATTACHMENT IS ADEQUATE. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2007-07-19 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2007-07-19 |
Time |
15:26 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2007-07-19 |
Time |
15:26 |
Sent To |
PC |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2007-04-18 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2007-04-18 |
Time |
07:59 |
Rev Time |
0.33 |
Received By |
btrobaug |
Date |
2007-04-18 |
Time |
07:46 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2007-07-12 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-07-12 |
Time |
13:47 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-07-12 |
Time |
13:47 |
Sent To |
E |
|
Notes |
2007-07-12 13:48:15 | TO "BTROBAUG" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2007-06-22 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-06-22 |
Time |
15:24 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-06-22 |
Time |
15:24 |
Sent To |
Z |
|
Notes |
2007-06-22 15:24:21 | TO "Z" BOX/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2007-05-30 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-05-30 |
Time |
09:22 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-05-30 |
Time |
09:22 |
Sent To |
B |
|
Notes |
2007-05-30 09:22:57 | TO "RMCDOUGAL" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2007-05-30 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-05-30 |
Time |
09:20 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-05-30 |
Time |
09:20 |
Sent To |
B |
|
Notes |
2007-05-30 09:20:32 | TO "RMCDOUGAL" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2007-04-30 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-04-30 |
Time |
14:49 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-04-30 |
Time |
14:49 |
Sent To |
B |
|
Notes |
2007-04-30 14:49:50 | TO "RMCDOUGAL" DESK/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2007-04-24 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-04-24 |
Time |
13:07 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-04-24 |
Time |
13:07 |
Sent To |
Z |
|
Notes |
2007-04-24 13:07:50 | TO "Z" BOX/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2007-04-16 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-04-16 |
Time |
14:49 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-04-16 |
Time |
14:48 |
Sent To |
E |
|
Notes |
2007-04-16 14:49:12 | TO "E" BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2007-04-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2007-04-19 |
Time |
07:59 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2007-04-04 |
Time |
17:45 |
Sent To |
|
|
Notes |
2007-04-04 17:45:38 | TO ZONING |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
N |
Date |
2007-06-25 |
|
|
Cont ID |
|
Sent By |
choops |
Date |
2007-06-25 |
Time |
11:58 |
Rev Time |
0.00 |
Received By |
choops |
Date |
2007-06-25 |
Time |
11:58 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2007-04-27 |
|
|
Cont ID |
|
Sent By |
choops |
Date |
2007-04-27 |
Time |
16:27 |
Rev Time |
0.00 |
Received By |
choops |
Date |
2007-04-27 |
Time |
16:26 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2007-04-13 |
|
|
Cont ID |
|
Sent By |
adavila |
Date |
2007-04-13 |
Time |
11:45 |
Rev Time |
0.00 |
Received By |
adavila |
Date |
2007-04-11 |
Time |
11:45 |
Sent To |
I |
|
Notes |
2007-04-13 11:46:23 | PLANNING AND ZONING DEPARTMENT | | | | ***FAILED*** | | | | 1. ACCORDING TO THE BUILDING ELEVATIONS ON SHEET 1/3, | | THE ROOF OVERHANG EXTENDS TWO (2) FEET.HOWEVER, | | ACCORDING TO THE WALL SECTION ON SHEET 1/3, THE ROOF | | OVERHANG EXTENDS THREE (3) FEET NINE (9) INCHES. | | PLEASE CLARIFY.ELEVATIONS AND WALL SECTION SHALL | | REFLECT ACTUAL DIMENSIONS. | | | | COMMENTS/QUESTIONS, CONTACT ANDREINA DAVILA Q. OR ERIC | | SCHNEIDER, PRINCIPAL PLANNER, AT 822-1435. |
|
|