Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2007-06-27 Cont ID  
Sent By rmcdouga Date 2007-06-27 Time 13:07 Rev Time 0.00
Received By rmcdouga Date 2007-06-27 Time 13:07 Sent To  
Notes
2007-06-27 13:08:25REVISED SHEETS 1 AND 2 ARE OK.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2007-06-15 Cont ID  
Sent By rmcdouga Date 2007-06-15 Time 14:34 Rev Time 0.00
Received By rmcdouga Date 2007-06-15 Time 14:34 Sent To  
Notes
2007-06-15 14:50:18REVISIONS TO SHEETS 1 AND 2 ARE DENIED
  
 1) MOST OF THE CHANGES THAT WERE MADE ARE NOT
 IDENTIFIED BY CLOUDING AND NUMBERING. SEE RED MARKS ON
 THE RETURNED PLAN.
  
 2) ON SHEET 1 THE ELEVATION TO THE TOP OF THE BOND BEAM
 WAS CHANGED TO 9'-0" IN TWO PLACES AND LEFT AT 9'-5" IN
 THE OTHER TWO. PLEASE CORRECT.
  
 3) SPECIFY THE FL NUMBERS FOR THE LINTELS AND TRUSS
 ANCHORS ON THE PLANS.
  
 4) ON SHEET 2 THE WRONG CODE SECTION IS SPECIFIED FOR
 NUMBER 1 UNDER PRE-ENGINEERED WOOD TRUSSES. IT SHOULD
 BE R 802.1.6.
  
 5) THE UPLIFT AND ANCHOR SPECIFIED FOR THE GIRDER TRUSS
 IS NOT ADEQUATE. SEE COMMENTS FOR TRUSS DRAWING
 SUBMITTALS.
  
 IN ORDER TO SPEED PLAN REVIEW, PLEASE RETURN THE DENIED
 REVISED PAGES THAT WERE REDLINED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2007-06-14 Cont ID  
Sent By rmcdouga Date 2007-06-14 Time 16:31 Rev Time 0.00
Received By rmcdouga Date 2007-06-14 Time 16:31 Sent To  
Notes
2007-06-15 11:20:14TRUSS LAYOUT AND DRAWINGS IS DENIED
  
 1) THE TRUSS LAYOUT IS REQUIRED TO BE SIGNED AND SEALED
 BY THE TRUSS ENGINEER AND REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD FOR THE STRUCTURE.
 FAC 61G-15-23.002 AND FS471.
  
 2) THE TRUSS DRAWING COVER SHEET IS REQUIRED TO BE
 SIGNED BY THE TRUSS ENGINEER. A SIGNATURE STAMP IS NOT
 ACCEPTABLE. FAC 61G-15-23.002 AND FS471.
  
 3) THE UPLIFT FOR THE 2 PLY GIRDER (A05)TRUSS IS -2366
 PSF WHICH EXCEEDS THE CAPACITY OF THE HETAL 20
 SPECIFIED ON THE PLANS. SUBMIT REVISED ROOF FRAMING
 PLANS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2007-05-02 Cont ID  
Sent By rmcdouga Date 2007-05-02 Time 07:45 Rev Time 0.00
Received By rmcdouga Date 2007-05-02 Time 06:49 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2007-04-19 Cont ID  
Sent By rmcdouga Date 2007-04-19 Time 07:59 Rev Time 0.00
Received By rmcdouga Date 2007-04-19 Time 07:59 Sent To  
Notes
2007-04-19 08:31:03DENIED BY BUILDING
  
 1) THE WALL SECTION ON SHEET 1 SHOWS A 3'-9" OVERHANG
 AND THE ELEVATIONS SPECIFY 2'-0". PLEASE CORRECT.
  
 2) ON SHEET 2 UNDER PREFABRICATED TRUSS NOTES, NUMBER 1
 REFERS TO FBC 2309. THIS SECTION IS NO LONGER USED IN
 THE 2004 FBC. PLEASE REVISE.
  
 3) ON SHEET THE ROOF SHEATHING IS REQUIRED TO BE
 FASTENED WITH RING SHANK NAILS. SEE LATEST REVISIONS TO
 2004 FBC RESIDENTIAL CODE SECTION R803.2.3.1.
  
 4) ON SHEET 2 THERE IS A TYPO ON SHEET 2 ON THE
 SHEATHING FASTENING NOTES. "CDK" PLYWOOD IS SPECIFIED
 AND IT SHOULD BE CDX.
  
 5) SPECIFY THE ATTACHMENT FOR THE CONCRETE ROOF TILE.
 CIRCLE THE FASTENER TYPE OR ADHESIVE THAT WILL BE USED
 ON THE NOA. MAKE SURE THAT THE ATTACHMENT RESISTANCE
 FOR THE ATTACHMENT IS ADEQUATE.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2007-07-19 Cont ID  
Sent By btrobaug Date 2007-07-19 Time 15:26 Rev Time 0.00
Received By btrobaug Date 2007-07-19 Time 15:26 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2007-04-18 Cont ID  
Sent By btrobaug Date 2007-04-18 Time 07:59 Rev Time 0.33
Received By btrobaug Date 2007-04-18 Time 07:46 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2007-07-12 Cont ID  
Sent By adarroug Date 2007-07-12 Time 13:47 Rev Time 0.00
Received By adarroug Date 2007-07-12 Time 13:47 Sent To E
Notes
2007-07-12 13:48:15TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2007-06-22 Cont ID  
Sent By adarroug Date 2007-06-22 Time 15:24 Rev Time 0.00
Received By adarroug Date 2007-06-22 Time 15:24 Sent To Z
Notes
2007-06-22 15:24:21TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2007-05-30 Cont ID  
Sent By adarroug Date 2007-05-30 Time 09:22 Rev Time 0.00
Received By adarroug Date 2007-05-30 Time 09:22 Sent To B
Notes
2007-05-30 09:22:57TO "RMCDOUGAL" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2007-05-30 Cont ID  
Sent By adarroug Date 2007-05-30 Time 09:20 Rev Time 0.00
Received By adarroug Date 2007-05-30 Time 09:20 Sent To B
Notes
2007-05-30 09:20:32TO "RMCDOUGAL" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2007-04-30 Cont ID  
Sent By adarroug Date 2007-04-30 Time 14:49 Rev Time 0.00
Received By adarroug Date 2007-04-30 Time 14:49 Sent To B
Notes
2007-04-30 14:49:50TO "RMCDOUGAL" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2007-04-24 Cont ID  
Sent By adarroug Date 2007-04-24 Time 13:07 Rev Time 0.00
Received By adarroug Date 2007-04-24 Time 13:07 Sent To Z
Notes
2007-04-24 13:07:50TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2007-04-16 Cont ID  
Sent By adarroug Date 2007-04-16 Time 14:49 Rev Time 0.00
Received By adarroug Date 2007-04-16 Time 14:48 Sent To E
Notes
2007-04-16 14:49:12TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2007-04-19 Cont ID  
Sent By rmcdouga Date 2007-04-19 Time 07:59 Rev Time 0.00
Received By rmcdouga Date 2007-04-04 Time 17:45 Sent To  
Notes
2007-04-04 17:45:38TO ZONING

Review Stop Z ZONING
Rev No 3 Status N Date 2007-06-25 Cont ID  
Sent By choops Date 2007-06-25 Time 11:58 Rev Time 0.00
Received By choops Date 2007-06-25 Time 11:58 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2007-04-27 Cont ID  
Sent By choops Date 2007-04-27 Time 16:27 Rev Time 0.00
Received By choops Date 2007-04-27 Time 16:26 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2007-04-13 Cont ID  
Sent By adavila Date 2007-04-13 Time 11:45 Rev Time 0.00
Received By adavila Date 2007-04-11 Time 11:45 Sent To I
Notes
2007-04-13 11:46:23PLANNING AND ZONING DEPARTMENT
  
 ***FAILED***
  
 1. ACCORDING TO THE BUILDING ELEVATIONS ON SHEET 1/3,
 THE ROOF OVERHANG EXTENDS TWO (2) FEET.HOWEVER,
 ACCORDING TO THE WALL SECTION ON SHEET 1/3, THE ROOF
 OVERHANG EXTENDS THREE (3) FEET NINE (9) INCHES.
 PLEASE CLARIFY.ELEVATIONS AND WALL SECTION SHALL
 REFLECT ACTUAL DIMENSIONS.
  
 COMMENTS/QUESTIONS, CONTACT ANDREINA DAVILA Q. OR ERIC
 SCHNEIDER, PRINCIPAL PLANNER, AT 822-1435.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved