2007-02-07 16:59:17 | BUILDING REVIEW CHECKLIST: |
| |
| ***NOTE:PROVIDE ALL THE INFORMATION REQUIRED BY CITY |
| POLICY FOR ROOFING PERMITS. SEE ATTACHED COPY. |
| |
| 1-WOOD DECK: |
| A) FROM NOA SUBMITTED,CLEARLY IDENTIFY WHICH |
| APPROVED ASSEMBLY IS GOING TO BE INSTALLED. |
| |
| B) FROM NOA SUBMITTED, CLEARLY IDENTIFYSPECIFIC |
| BASE SHEET FASTENING OPTION. |
| |
| B) FROM NOA SUBMITTED. PROVIDERAS 117 CALCULATIONS |
| FOR NAIL ENHANCING AT PERIMETER AND CORNER AREAS AS |
| REQUIRED BY GENERAL LIMITATION #7. SEE LAST PAGE OF |
| NOA. |
| |
| 2- CONCRETE DECK: |
| A) FROM NOA SUBMITTED, CLEARLY IDENTIFY WHICH |
| APPROVED ASSEMBLY IS GOING TO BE INSTALLED. |
| |
| B) IF SELECTED ASSEMBLY IS LIMITED BY GENERAL |
| LIMITATION #7, THEN PROVIDE RAS 117 CALCULATIONS FOR |
| NAIL ENHANCING AT PERIMETER AND CORNER AREAS IF |
| ASSEMBLY IS DESIGNED FOR DESIGN PRESSURES LESS THAN |
| THOSE SPECIFIED ON TABLE 1609.6.2.1(2) 2004 FBC. SEE |
| LAST PAGE OF NOA. |
| |
| C) IF SELECTED ASSEMBLY IS LIMITED BY GENERAL |
| LIMITATION #9, THEN IT MAY NOT BE USED IN THIS AREA IF |
| ASSEMBLY IS DESIGNED FOR DESIGN PRESSURES LESS THAN |
| THOSE SPECIFIED ON TABLE 1609.6.2.1(2) 2004 FBC 2004. |
| NAIL ENHANCING IS NOT ALLOWED IN GENERAL LIMITATION #9. |
| SEE LAST PAGE OF NOA. |
| |
| 3- SEPARATE PERMITS REQUIRED TO REMOVE AND RE-INSTALL |
| ALL ROOF EQUIPMENT. |
| |
| JULIO GOMEZ |
| BUILDING PLANS EXAMINER |
| (561)805-6712 |
| |