2006-12-21 18:31:08 | ** UNSAT ** |
| |
| |
| ** PLEASE SEE PLANS ARE BEING ROUTED TO PLUMBING FOR |
| REVIEW AS ELECTRICAL AND PLUMBING WERE SUBMITTED |
| TOGETHER. CALLED CATALFUMO REP TO LET THEM KNOW |
| ELECTRICAL COMMENTS WERE ONLINE. |
| |
| 1) NOTE: PLEASE SEE 240.21C AS TAPPED CONDUCTORS ON THE |
| SECONDARY SIDE OF THE TRANSFORMERS SHALL TERMINATE IN A |
| SINGLE MEANS OF OVER CURRENT PROTECTION. |
| PLEASE SEE ALL TAPS GOING INTO GUTTERS AS SHOWN ARE NOT |
| PERMITTED. |
| |
| 2) NOTE: PLEASE INDICATE TWO GROUND RODS ON THE |
| SECONDARY SIDE OF ALL TRANSFORMER FOR THE SD SYSTEM PER |
| 250.20, 250.30, 250.56 |
| |
| 3) NOTE: PLEASE SEE MISSING COLD WATER AS PART OF THE |
| GROUNDING ELECTRODE SYSTEM. |
| 250.50 |
| |
| 4) NOTE: PLEASE PROVIDE INFORMATION ON TYPE OF DB CABLE |
| BEING INSTALLED. |
| PLEASE SEE 590.4 |
| CONDUCTORS SHALL BE PERMITTED WITHIN CABLE ASSEMBLIES |
| OR WITHIN MULTI-CONDUCTOR CORDS OR CABLES OF A TYPE |
| IDENTIFIED IN TABLE 400.4 FOR HARD USAGE OR EXTRA-HARD |
| USAGE. |
| PLEASE ALSO SEE SECTION WHICH SPEAKS OF CABLE. |
| |
| 5) NOTE: PLEASE SEE LOAD CALCULATIONS FOR MAIN 4 OF 5 |
| ARE NOT COMPLETE. PLEASE THERE IS A PANEL WHICH FEEDS |
| LIGHTING, CRANE LIGHTS ETC WHICH IS NOT FIGURED OR |
| SHOWN. PLEASE ALSO SEE PREVIOUS COMMENTS WITH RESPECT |
| TO TAPS. |
| |
| 6) NOTE: PLEASE SEE NO HAND DRAWN CHANGES MAY BE DONE |
| TO PLANS WHICH ARE SIGNED, DATED AND SEALED BY AN |
| ENGINEER. |
| FS 471.025 |
| |
| 7) NOTE: PLEASE SEE POWER AS SHOWN WHICH WILL BE ON THE |
| SECONDARY SIDES OF THE CITY HALL, LIBRARY AND GARAGE |
| TRANSFORMER IS BEING SHOWN FOR FUTURE PANELS ETC, |
| HOWEVER NO MEANS OF DISCONNECT AND OCP IS BEING SHOWN |
| ON THE SECONDARY SIDE. |
| PLEASE TERMINATE IN A SINGLE MEANS OF OCP WHICH LIMITS |
| THE OCP ON THE CONDUCTORS, TRANSFORMER ETC. |
| PLEASE SEE 240.21C ETC |
| |
| 8) NOTE: PLEASE SEE 250.66 FOR SIZING OF THE GROUNDING |
| ELECTRODE CONDUCTOR(S) ON THE TRANSFORMER. MOST ARE |
| OK. |
| |
| 9) NOTE: PLEASE SEE 450.3B FOR THE MAX OCP ON THE |
| PRIMARY SIDE OF TRANSFORMERS. PLEASE SEE TRANS #1 AS |
| THE OCP IS TOO HIGH. ( OR ) PLEASE SEE EXCEPTIONS AND |
| PROVIDE INFORMATION ON THE TYPE OF UNIT BEING |
| INSTALLED. |
| |
| 10) NOTE: PLEASE PROVIDE A LAYOUT/SITE PLANS WHICH |
| INDICATES THE LOCATIONS OF ALL SERVICE EQUIPMENT BEING |
| INSTALLED AND PROPOSED. |
| FBC 106.1.2 ADMIN SECTION |
| |
| 11) NOTE: PLEASE SEE THE VALUE FOR COMPLETE SCOPE OF |
| WORK FOR THE SERVICE AS SHOWN AND BEING PROPOSED SHALL |
| INCLUDE ALL LABOR AND MATERIALS, EVEN IF MATERIALS WERE |
| OWNER SUPPLIED. PLEASE KNOW IF NOT ADJUSTED FOR VALUE, |
| ONE WILL BE ADJUSTED USING MARSHALL?S AND SWIFT GUIDE |
| AS ADOPTED PER THE FBC 108.3 ADMIN SECTION. |
| |
| 12) NOTE: PLEASE SUPPLY INFORMATION ON TRAILERS BEING |
| INSTALLED FOR LOADS. THE LOAD AS SHOWN ON RISER CAN NOT |
| BE VERIFIED AS THE TRAILERS THEMSELVES ARE NOT |
| PERMITTED. |
| 220, 215.5, ETC |
| |
| 13) NOTE: PLEASE INDICATE CONTINUOUS LOADS AT 125%. |
| PLEASE SEE LOAD AS SHOWN IS EXACTLY AT THE RATING OF |
| THE SEC?S WHICH ARE BEING INSTALLED. PLEASE AS |
| CONTINUOUS LOADS AND OTHER FACTORS HAVE NOT BEEN TAKEN |
| OR SHOWN INTO CONSIDERATION THE SIZE OF THE SEC?S DO |
| NOT SUPPLY ANY ROOM FOR ANY FUTURE LOADS.? |
| 215.3, 230.42 , 310.16, 240.4, ETC |
| |
| 14) NOTE:PLEASE SEE RISER SEEMS TO IDENTIFY A |
| "GROUND" "G" FROM FPL TO GUTTER AND FROM GUTTER TO ALL |
| FIRST MEANS OF DISCONNECTS? PLEASE SEE THIS IS THE SAME |
| SYMBOL BEING USED ON ALL OTHER LOCATIONS FOR GROUNDS |
| ALSO. PLEASE CLARIFY AS THIS SHOULD BE SHOWN AS THE |
| NEUTRAL OR "GROUNDED" CONDUCTOR AS THERE ARE NO |
| EQUIPMENT GROUNDING CONDUCTORS BEFORE THE FIRST MEANS |
| OF DISCONNECT. 250.6, 250.24B. |
| PLEASE PROVIDE COMPLETE NEUTRAL LOAD CALCULATIONS AS |
| THE NEUTRAL CONDUCTOR(S) FOR THE SERVICE ENTRANCE |
| CONDUCTORS AND FEEDERS ARE SUBSTANTIALLY DECREASED. |
| PLEASE INDICATE HOW AND WHERE THE LOAD FOR THE NEUTRAL |
| WAS DERIVED AND SHOW ON PLANS IN ORDER TO VERIFY THE |
| CORRECT SIZING OF THE CONDUCTORS AS SHOWN. |
| |
| 15) NOTE: PLEASE SEE LABELING OF MAINS SHALL BE AS |
| FOLLOWS, 1 OF 5, 2 OF 5 ETC. |
| PLEASE SEE RISER NOW SHOWS WHAT APPEARS TO BE A |
| MISPRINT OF 105,205,305, ETC |
| |
| 16) NOTE: PLEASE SEE BASED ON THE NUMBER OF CONDUCTORS |
| BEING SHOWN ON THE SECONDARY SIDE OF THE TRANSFORMER TO |
| GUTTER THESE ARE ONLY SINGLE PHASE BEING BROUGHT TO |
| GUTTERS??? |
| PLEASE SEE PANEL FROM GUTTER WHICH INDICATES A THREE |
| PHASE FEED?? |
| PLEASE KNOW AS THIS TIME THE RISER IS VERY CONFUSING AS |
| THREE PHASES ARE BEING BROUGHT TO TRANSFORMERS AND ONLY |
| SINGLE PHASE BEING BROUGHT OUT? |
| THERE ARE TOO MANY CODE SECTIONS TO PLACE FOR THIS |
| NOTE, PLEASE SEE NEC 2005. |
| |
| 17) NOTE: PLEASE SEE THE MINIMUM SIZE OF THE GROUNDING |
| ELECTRODE CONDUCTOR SHALL BE SIZED PER 250.66. |
| |
| ** PLEASE KNOW AS THERE ARE ITEMS ON RISER WHICH WILL |
| BE CHANGING, THERE MAY BE COMMENTS ON FUTURE ELECTRICAL |
| RISER. |
| |
| * ** IMPORTANT** |
| ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| PICKED UP FOR CORRECTIONS, PLEASE BE |
| SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| SHEETS AND ONLY INSERT NEW REVISED |
| SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| AND STAMPING. DO NOT LEAVE ANY |
| OLD/VOIDED SHEETS IN SETS. |
| PLEASE KNOW ONLY ONE SET OF THE |
| OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| FOR REFERENCE. |
| THIS WILL HELP IN THE REVIEW PROCESS AND |
| AVOID ANY DELAYS. |
| |
| ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| REVIEWER. |
| |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| CONSTRUCTION SERVICES DEPT. |
| CITY OF WEST PALM BEACH |
| 561-805-6717 |
| [email protected] |