Review Stop AD ADDRESSING
Rev No 1 Status P Date 2006-11-13 Cont ID  
Sent By lursu Date 2006-11-13 Time 11:43 Rev Time 0.00
Received By lursu Date 2006-11-13 Time 11:43 Sent To  
Notes
2006-11-13 11:47:09A NEW SITE ADDRESS FOR THE PROJECT WAS ASSIGNED FOR THE
 BEGINING POINT OF THE PROJECT AT S DIXE HWY AND
 LAKEVIEW AVE.PERMIT MUST BE ATTACHED TO :726 S DIXIE
 HWY UNDER PCN = 74434328090160010

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2008-02-13 Cont ID  
Sent By rbrown Date 2008-02-13 Time 20:06 Rev Time 0.00
Received By rbrown Date 2008-02-13 Time 20:06 Sent To  
Notes
2008-02-13 20:07:40REVISION SUBMITTED 2/4/08 FOR CABINET HARDENING DETAILS

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2006-11-16 Cont ID  
Sent By rbrown Date 2006-11-16 Time 10:48 Rev Time 0.00
Received By rbrown Date 2006-11-16 Time 10:48 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2008-03-18 Cont ID  
Sent By btrobaug Date 2008-03-18 Time 08:43 Rev Time 0.00
Received By btrobaug Date 2008-03-18 Time 08:43 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2007-02-02 Cont ID  
Sent By btrobaug Date 2007-02-02 Time 12:50 Rev Time 0.75
Received By btrobaug Date 2007-02-02 Time 07:51 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2006-11-15 Cont ID  
Sent By btrobaug Date 2006-11-15 Time 14:32 Rev Time 1.00
Received By btrobaug Date 2006-11-15 Time 06:39 Sent To  
Notes
2006-11-15 13:56:09 
  
  
 NONCOMPLIANT
 THIS PERMIT IS BEING ISSUED TO
 FACILITATE THE START OF THIS PROJECT.
 THE PLANS HOWEVER NEED TO BE REVISED.
  
 PLEASE MAKE THE FOLLOWING CORRECTIONS FOR CODE
 COMPLIANCE AND RESUBMIT FOR REVIEW WITHIN 15 WORKING
 DAYS OF THE PERMIT BEING ISSUED.
  
 1} THE #4 COPPER GROUNDING ELECTRODE CONDUCTORS LOCATED
 AT THE "SERVICE POINTA & BPOWER RISER DIAGRAM", DO
 NOT COMPLY WITH ARTICLE 250.66 NEC. FOR 300MCMA #2
 COPPERGEC WOULD BE REQUIRED. SHEET L-23, LAKEVIEW TO
 PALM BEACH LAKES PLAN, SHEET L-20. PALM BEACH LAKES TO
 26TH, SERVICE POINT "A" SHEET L-24.
  
 2} THERE IS NO SCHEDULE FOR THE 300 AMP "MAIN" FEEDING
 THE CONTACTORS THEN THE 200 AMP PANEL WITH #3/0
 CONDUCTORS. PLEASE PROVIDE A SCHEDULE INDICATING OCP
 FOR THIS FEEDAND THE #12 CONDUCTORS OR INSTALL OCP
 FOR THOSE CONDUCTORS. ALSO THERE IS NO OCP SHOWN FOR
 PANEL "AV".
  
 3} THE METRIC DESIGNATOR USED FOR THE CONDUIT SIZE IS
 INCORRECT. SEE 300.1(C) AND ANNEX "C". ALL SHEETS.
  
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW.
 CITY OF WEST PALM BEACH
 561/805-6718
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2008-03-14 Cont ID  
Sent By adarroug Date 2008-03-14 Time 11:23 Rev Time 0.00
Received By adarroug Date 2008-03-14 Time 11:23 Sent To E
Notes
2008-03-14 11:24:37TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2008-02-04 Cont ID  
Sent By adarroug Date 2008-02-04 Time 12:52 Rev Time 0.00
Received By adarroug Date 2008-02-04 Time 12:52 Sent To B
Notes
2008-02-04 12:52:55TO "RBROWN" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2007-02-01 Cont ID  
Sent By adarroug Date 2007-02-01 Time 10:13 Rev Time 0.00
Received By adarroug Date 2007-02-01 Time 10:13 Sent To E
Notes
2007-02-01 10:14:12TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-11-16 Cont ID  
Sent By btrobaug Date 2006-11-16 Time 12:08 Rev Time 0.00
Received By btrobaug Date 2006-11-13 Time 10:57 Sent To PC
Notes
2006-11-13 10:58:01TO "E" BOX