Plan Review Stops For Permit 06090782 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2006-10-05 |
|
|
Cont ID |
|
Sent By |
amorse |
Date |
2006-10-05 |
Time |
07:31 |
Rev Time |
0.00 |
Received By |
amorse |
Date |
2006-10-05 |
Time |
07:31 |
Sent To |
PC |
|
Notes |
2006-10-05 00:00:00 | | | | | DENIED | | | | 1) PLEASE BE SURE TO PROVIDE 2 COPIES OF | | ALL SUBMITTALS THIS INCLUDES THE PLANS | | AND INSTALLATION SCHEDULE (I HAVE MADE | | COPIES) | | | | 2) PROVIDE 2 COPIES OF THE CORRECT | | DRAWINGS THAT ARE APPROVED BY THE STATE | | (SEE PAGE 2 OF THE STATE SHEET) | | IF YOU ARE NOT USING THE .50 ALUMINUM | | PANELS FROM THE STATE SHEETS PLEASE | | CHECK THE WEB SITE AS FL# 419-R COVERS | | THE 24 GAUGE GALV PANELS UNDER DRAWING | | NUMBER 05-271 | | | | 3) PLEASE SEE THAT PANELS ON THE FRONT | | (SOUTH) AND THE BACK (NORTH) ELEVATIONS | | SHOW PANEL MATES ON THE SIDES OF THE | | OPENINGS THIS WOULD REQUIRE THE PANEL | | SPANS TO RUN HORIZONTALLY PLEASE CONFIRM | | THAT THEY ARE INSTALLED VERTICALLY AS ON | | THE INSTALLATION SCHEDULE. ALSO THERE IS | | NO PANEL FOR THE 24X24 OPENING ON THE | | EAST ELEVATION | | | | BLDG PLAN REVIEW | | ADRIAN MORSE | | 561-805-6716 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2006-10-05 |
Time |
|
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-09-23 |
Time |
17:52 |
Sent To |
|
|
Notes |
2006-09-23 00:00:00 | TO "MISC" BOX#1 |
|
|
|