Plan Review Details - Permit 06090389
Plan Review Stops For Permit 06090389
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2006-09-25 Cont ID  
Sent By kconrad Date 2006-09-25 Time 16:54 Rev Time 0.00
Received By kconrad Date 2006-09-25 Time 16:54 Sent To I
Notes
2006-09-25 00:00:00PREINSPECT OK TO ISSUE AS STATED. THERE
 APPEARED TO BE NO ROOF FRAMING DAMAGE
 BUT THERE WILL BE DEMOLITION AND DRYWALL
 REPAIR. THE ELECTRICAL SYSTEM WILL BE
 CHECKED BY THE ELECTRICAL CONTRACTOR. A
 SEPARATE MECHANICAL PERMIT WILL BE
 REQUIRED AND PLANS SUBMITTED FOR NEW
 DUCT WORK.THE EXISTING BUILDING CODE
 WILL REQUIRE ENERGY CALCULATIONS.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2006-12-05 Cont ID  
Sent By btrobaug Date 2006-12-05 Time 17:16 Rev Time 0.50
Received By btrobaug Date 2006-12-05 Time 16:46 Sent To PC
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-11-30 Cont ID  
Sent By adarroug Date 2006-11-30 Time 13:19 Rev Time 0.00
Received By adarroug Date 2006-11-30 Time 13:19 Sent To M
Notes
2006-11-30 13:19:50TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-11-29 Cont ID  
Sent By spalmer Date 2006-11-29 Time 18:06 Rev Time 0.00
Received By spalmer Date 2006-11-29 Time 18:06 Sent To E
Notes
2006-11-29 18:07:31ELEC REV/SENT TO BTROBAUGH'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-11-15 Cont ID  
Sent By adarroug Date 2006-11-15 Time 13:02 Rev Time 0.00
Received By adarroug Date 2006-11-15 Time 13:02 Sent To M
Notes
2006-11-15 13:02:37TO "M" BOX/REV

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2006-12-01 Cont ID  
Sent By tgordon Date 2006-12-01 Time 14:02 Rev Time 0.30
Received By tgordon Date 2006-12-01 Time 14:01 Sent To  
Notes
2006-12-01 14:02:59MECH. PLANS SUBMITTED AS REVISION.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2006-11-15 Cont ID  
Sent By tgordon Date 2006-11-15 Time 14:14 Rev Time 0.30
Received By tgordon Date 2006-11-15 Time 14:14 Sent To  
Notes
2006-11-15 14:23:29** MECHANICAL REVISION **
 *** DENIED ***
 1) THE RETURN AIR TRANSFER DUCTS TO THE BEDROOMS ARE
 UNDER-SIZED, SEE NOTE #2.
  
 2) BALANCED RETURN AIR.
 MAY BE ACHIEVED BY.
 (A)TRANSFER DUCTS MAY ACHIEVE THIS BY
 INCREASING THE RETURN TRANSFER ONE AND
 ONE HALF TIMES THE CROSS SECTIONAL AREA
 (SQUARE INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM OR SPACE IT'S SERVING
 AND THE DOOR HAVING AT LEAST AN
 UNRESTRICTED 1 INCHUNDERCUT TO ACHIEVE
 PROPER RETURN AIR BALANCE.
 (B)TRANSFER GRILLES SHALL USE 50
 SQUARE INCHES (OF GRILLE AREA) TO 100
 CFM (OF SUPPLY AIR) FOR SIZING
 THROUGH-THE-WALL TRANSFER GRILLES AND
 USING AN UNRESTRICTED 1-INCH
 UNDERCUTTING OF DOORS TO ACHIEVE PROPER
 RETURN AIR BALANCE
 (C)HABITABLE ROOMS ONLY SHALL BE
 REQUIRED TO MEET THESE REQUIREMENTS FOR
 PROPER BALANCED RETURN AIR EXCLUDING
 BATHROOMS, CLOSETS, STORAGE ROOMS AND
 LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY
 AIR INTO THE MASTER SUITE SHALL BE
 INCLUDED. PER 2004 FBC/R M1602.4 .
  
 3) ENGINEER LUIS A. LOPEZ NEEDS TO SIGN AND SEAL THE
 PLANS AS HIS NAME IS THE TITLE BLOCK, PER FAC
 61G1-16.003.
  
 4) A MECHANICAL PERMIT WILL BE REQUIRED FOR THE A/C
 WORK. PLEASE RESUBMIT MECHANICAL PLANS WITH APPLICATION
 FOR MECHANICAL PERMIT.
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.