Plan Review Details - Permit 06080671
Plan Review Stops For Permit 06080671
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2006-09-23 Cont ID  
Sent By rnuquist Date 2006-09-23 Time 14:33 Rev Time 0.00
Received By rnuquist Date 2006-09-23 Time 14:33 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-10-17 Cont ID  
Sent By btrobaug Date 2006-10-17 Time 15:26 Rev Time 0.50
Received By btrobaug Date 2006-10-17 Time 15:22 Sent To M
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2006-09-01 Cont ID  
Sent By btrobaug Date 2006-09-01 Time 09:12 Rev Time 0.33
Received By btrobaug Date 2006-09-01 Time 09:12 Sent To M
Notes
2006-09-01 00:00:00 
  
  
 NONCOMPLIANT
  
 PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
 1} THERE MUST BE A DISCONNECT FROM THE
 GENERATOR WHERE THE CONDUCTORS ENTER THE
 BUILDING. IF ALL DISCONNECTS CANNOT BE
 GROUPED PER 230.72, SEE THAT ALL
 ARTICLES FROM 225.31 THROUGH 225.39, ARE
 COMPLIED WITH.
  
 2} 700.15 LOADS ON EMERGENCY BRANCH
 CIRCUITS.
 NO APPLIANCES AND NO LAMPS, OTHER THAN
 THOSE SPECIFIED AS REQUIRED FOR
 EMERGENCY USE, SHALL BE SUPPLIED BY
 EMERGENCY LIGHTING CIRCUITS. PROVIDE A
 PANEL SCHEDULE FOR THE
 EMERGENCY/GENERATOR PANEL.
  
 3} THE PERSON TAKING RESPONSIBILITY FOR
 THE PLAN/DRAWINGS, SHALL PRINT AND SIGN
 THEIR NAME ON THE SHEETS THEY DRAW.
 PLEASE DO THIS PRIOR TO RESUBMITTING.
  
 4} PLEASE LOCATE ALL SERVICE EQUIPMENT
 ON THE PLAN, METER ENCLOSURE,
 DISCONNECTS AND PANELS, SO THAT
 COMPLIANCE WITH ARTICLES 225 AND 230 CAN
 BE REVIEWED.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2006-09-06 Cont ID  
Sent By mperson Date 2006-09-06 Time 13:42 Rev Time 0.15
Received By mperson Date 2006-09-06 Time 13:42 Sent To B
Notes
2006-09-06 00:00:00CONTRACTOR INFORMATION
 NOTE: GAS PERMIT REQUIRED. GAS CONTRAC-
 TOR TO SUBMIT PLANS WITH PERMIT APPLICA-
 TION. ALL GAS INSPECTIONS TO BE COMPLETE
 BEFORE FINAL GEN/RES INSPECTION.
  
 ******IMPROTANT INFORMATION******
 AS OF 8/25/06 GENERATOR (GEN/RES AND
 GEN/COM) PERMIT APPLICATIONS SHALL NOT
 BE ACCEPTED UNLESS THE ELECTRICAL INFOR-
 MATION AND GAS (OR DIESEL) INFORMATION
 IS ALL SUBMITTED AT THE SAME TIME. THE
 GENERATOR, ELECTRICAL AND GAS/DIESEL IN-
 FORMATION WILL BE ROUTED TOGETHER. THIS
 WILL ENSURE THAT ALL OF THE INFORMATION
 (PARTICULARLY THE MANUFACTURER'S SPECI-
 FICATIONS AND INSTALLATION INSTRUCTIONS)
 ARE AVAILABLE TO ALL PLAN REVIEWERS.
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2007-01-18 Cont ID  
Sent By adarroug Date 2007-01-18 Time 10:49 Rev Time 0.00
Received By adarroug Date 2007-01-18 Time 10:49 Sent To M
Notes
2007-01-18 10:49:35TO "M" BOX/RESUB--NO SPAMP ON PLANS

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2007-01-10 Cont ID  
Sent By adarroug Date 2007-01-10 Time 11:24 Rev Time 0.00
Received By adarroug Date 2007-01-10 Time 11:24 Sent To Z
Notes
2007-01-10 11:24:33TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-10-14 Cont ID  
Sent By adarroug Date 2006-10-14 Time 16:18 Rev Time 0.00
Received By adarroug Date 2006-10-14 Time 16:18 Sent To E
Notes
2006-10-14 16:18:39TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-10-06 Cont ID  
Sent By adarroug Date 2006-10-06 Time 14:10 Rev Time 0.00
Received By adarroug Date 2006-10-06 Time 14:10 Sent To Z
Notes
2006-10-06 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-08-21 Cont ID  
Sent By adarroug Date 2006-08-21 Time 09:57 Rev Time 0.00
Received By adarroug Date 2006-08-21 Time 09:57 Sent To E
Notes
2006-08-21 00:00:00TO "GEN-RES" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-09-23 Cont ID  
Sent By rnuquist Date 2006-09-23 Time 14:33 Rev Time 0.00
Received By rnuquist Date 2006-08-11 Time 17:55 Sent To  
Notes
2006-08-11 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2007-01-18 Cont ID  
Sent By tgordon Date 2007-01-18 Time 12:23 Rev Time 0.15
Received By tgordon Date 2007-01-18 Time 12:23 Sent To B
Notes
2007-01-18 12:24:28NEW PAGES SUBMITTED (RE-STAMP).

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2006-10-18 Cont ID  
Sent By tgordon Date 2006-10-18 Time 13:49 Rev Time 0.20
Received By tgordon Date 2006-10-18 Time 13:49 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2006-09-05 Cont ID  
Sent By tgordon Date 2006-09-05 Time 15:54 Rev Time 0.15
Received By tgordon Date 2006-09-05 Time 15:54 Sent To G
Notes
2006-09-05 00:00:00*** DENIED ***
 1) SEE ZONING REVIEW NOTES.
  
 2) ALSO SHOW ON SURVEY LOCATION OF
 UNDER-GROUND PROPANE TANK (NOTE TANK
 MUST BE A MINIMUM OF 10 FT. FROM
 GENERATOR).
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.

Review Stop Z ZONING
Rev No 3 Status P Date 2007-01-16 Cont ID  
Sent By mmclean Date 2007-01-16 Time 11:23 Rev Time 0.00
Received By mmclean Date 2007-01-16 Time 11:23 Sent To I
Notes
2007-01-16 11:24:20NOTE: THE PROPOSED GENERATOR WILL NOT PROJECT INTO THE
 REQUIRED REAR SETBACK.

Review Stop Z ZONING
Rev No 2 Status F Date 2006-10-13 Cont ID  
Sent By eschneid Date 2006-10-13 Time 10:10 Rev Time 0.00
Received By eschneid Date 2006-10-13 Time 10:10 Sent To  
Notes
2006-10-13 10:13:12FAILED
  
 COMMENTS FROM AUG. 18 ZONING REVIEW NOT ADDRESSED.
  
 ADDITIONALLY, THE LOCATION OF THE PROPOSED GENERATOR,
 WITH SETBACK DIMENSIONS SHALL BE SHOWN ON THE NEW
 SURVEY.

Review Stop Z ZONING
Rev No 1 Status F Date 2006-08-18 Cont ID  
Sent By mmclean Date 2006-08-18 Time 15:44 Rev Time 0.00
Received By mmclean Date 2006-08-18 Time 15:44 Sent To I
Notes
2006-08-18 00:00:00DENIED,
 1. NEED TO PROVIDE A CURRENT SURVEY,
 SHOWING ALL THAT'S LOCATED WITHIN THE
 PROPERTY. SURVEY MUST PROVIDE THE
 SETBACKS OF THE STRUCTURE FROM PROPERTY
 LINE (FRONT/SIDES/REAR)
 2. SURVEY MUST SHOW THE EXISTING SHED
 AND SETBACKS.
 3. NEED TO PROVIDE THE DISTANCE OF THE
 PROPOSED GENERATOR FROM THE PROPERTY
 LINE.
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved