Plan Review Details - Permit 06041010
Plan Review Stops For Permit 06041010
Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-06-05 Cont ID  
Sent By adarroug Date 2006-06-05 Time 14:58 Rev Time 0.00
Received By adarroug Date 2006-06-05 Time 14:58 Sent To M
Notes
2006-06-05 00:00:00TO "M" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-05-08 Cont ID  
Sent By adarroug Date 2006-05-08 Time 16:11 Rev Time 0.00
Received By tgordon Date 2006-05-09 Time 10:22 Sent To M
Notes
2006-05-08 00:00:00TO "M" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-05-02 Cont ID  
Sent By adarroug Date 2006-05-02 Time 14:50 Rev Time 0.00
Received By tgordon Date 2006-05-03 Time 10:21 Sent To M
Notes
2006-05-02 00:00:00TO "M" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-05-02 Cont ID  
Sent By adarroug Date 2006-04-27 Time 14:50 Rev Time 0.00
Received By adarroug Date 2006-04-26 Time 08:53 Sent To  
Notes
2006-04-26 00:00:00TO "M" BOX

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2006-06-06 Cont ID  
Sent By tgordon Date 2006-06-06 Time 08:18 Rev Time 0.25
Received By tgordon Date 2006-06-06 Time 08:18 Sent To  
Notes
2006-06-06 00:00:00*** PROVISO ***
 1)THE DWELLING WILL BE REQUIRED TO HAVE
 SMOKE ALARMS INSTALLED IF NOT ALREADY
 PRESENT, PER 2004 FBC/R 313.1.1, AND SEE
 2004 FEBC 303.1 LEVEL ONE ALTERATION
 INCLUDE REPLACEMENT OF EQUIPMENT.
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2006-05-09 Cont ID  
Sent By tgordon Date 2006-05-09 Time 10:23 Rev Time 0.30
Received By tgordon Date 2006-05-09 Time 10:23 Sent To  
Notes
2006-05-09 00:00:00*** DENIED ***
 1) AS REQUESTED IN LAST 2 REVIEWS JOB
 ADDRESS NEEDS TO BE ON ALL PLANS (SEE
 MECHANICAL PLANS AS I PUT THE ADDRESS ON
 THEM AND HIGHLIGHTED IT TO SHOW WHAT I
 AM REFERRING TO.
  
 2) AS REQUESTED IN PAST REVIEWALL
 DUCTS NEED TO BE SIZED, AS I AM NOT
 GOING TO DESIGN THE SYSTEM FOR YOU I
 HAVE HIGHLIGHTED THE DUCTS THAT NEED TO
 BE SIZED ON THE MECHANICAL PLANS.
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2006-05-03 Cont ID  
Sent By tgordon Date 2006-05-03 Time 10:21 Rev Time 0.35
Received By tgordon Date 2006-05-03 Time 10:21 Sent To  
Notes
2006-05-03 00:00:00*** DENIED ***
 1)CONSTRUCTION DOCUMENTS SHALL BE OF
 SUFFICIENT CLARITY. PER 2004 FBC 106.1.1
 . PLEASE NOTE SUFFICIENT CLARITY MEANS
 THAT I SHOULD BE ABLE TO TELL WHAT WORK
 AND MATERIALS ARE TO BE USED BY THE
 PLANS SUBMITTED.
  
 2) AS NOTED IN LAST REVIEW 4-27-06 #2,
 PLANS NEED JOB ADDRESS ON ALL SHEETS
 (PLEASE SHOW THE CORRECT ADDRESS).
  
 3) AS NOTED IN LAST REVIEW 4-27-06 #3
 DESIGN, ARE THE T'S, Y'S, AND +'S MIXING
 BOXES, SEE NOTE #1.
  
 4) CFM'S HAVE BEEN WHITED OUT, CFM'S
 NEED TO BE ON PLANS AT EACH GRILL.
  
 5) SHOW SIZE OF EACH RETURN AIR TRANSFER
 GRILL ON PLANS.
  
 6) SHOW SIZE OF RETURN AIR GRILL TO AHU
 AND DUCT SIZE IF USED.
  
 7) PLEASE SEE NOTE #1, THANK YOU.
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2006-04-27 Cont ID  
Sent By tgordon Date 2006-04-27 Time 08:34 Rev Time 0.30
Received By tgordon Date 2006-04-27 Time 08:34 Sent To  
Notes
2006-04-27 00:00:00*** DENIED ***
 1) ENERGY CALCULATIONS NEED TO BE SIGNED
 BY OWNER/AGENT.
  
 2) PLANS NEED JOB ADDRESS, CONTRACTOR'S
 INFORMATION WITH LISENSE NUMBER ON ALL
 PAGES.
  
 3) FROM THE DESIGN OF YOURR SUBMITTED
 PLANS IT CAN NOT BE DETERMINED IF THE
 DUCT SYSTEM IS A TRUNK LINE, FLEX, OR
 WATER LINES, PLEALE CORRECT.
  
 4) WHEN DESIGNING THE DUCT SYSTEM SHOW
 THE SIZE OF ALL DUCTS.
  
 5) PORVIDE RETURN AIR FOR BEDROOMS.
 BALANCED RETURN AIR.
 THIS MAY BE ACHIEVED BY.
 (A)TRANSFER DUCTS MAY ACHIEVE THIS BY
 INCREASING THE RETURN TRANSFER ONE AND
 ONE HALF TIMES THE CROSS SECTIONAL AREA
 (SQUARE INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM OR SPACE IT'S SERVING
 AND THE DOOR HAVING AT LEAST AN
 UNRESTRICTED 1 INCHUNDERCUT TO ACHIEVE
 PROPER RETURN AIR BALANCE.
 (B)TRANSFER GRILLES SHALL USE 50
 SQUARE INCHES (OF GRILLE AREA) TO 100
 CFM (OF SUPPLY AIR) FOR SIZING
 THROUGH-THE-WALL TRANSFER GRILLES AND
 USING AN UNRESTRICTED 1-INCH
 UNDERCUTTING OF DOORS TO ACHIEVE PROPER
 RETURN AIR BALANCE
 (C)HABITABLE ROOMS ONLY SHALL BE
 REQUIRED TO MEET THESE REQUIREMENTS FOR
 PROPER BALANCED RETURN AIR EXCLUDING
 BATHROOMS, CLOSETS, STORAGE ROOMS AND
 LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY
 AIR INTO THE MASTER SUITE SHALL BE
 INCLUDED. PER 2004 FBC/R M1602.4 .
  
 6) SUBMIT TWO COPYS OF ALL PAPER WORK.
  
 7) CONSTRUCTION DOCUMENTS SHALL BE OF
 SUFFICIENT CLARITY. PER 2004 FBC 106.1.1
 .
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved