Plan Review Details - Permit 05120146
Plan Review Stops For Permit 05120146
Review Stop G GAS REVIEW
Rev No 2 Status F Date 2006-01-17 Cont ID  
Sent By mperson Date 2006-01-17 Time 10:58 Rev Time 1.00
Received By mperson Date 2006-01-17 Time 10:58 Sent To PC
Notes
2006-01-17 00:00:00DENIED 2ND TIME
  
 REFERENCE: FBC-2004 FUEL GAS
  
 THE FOLLOWING INFORMATION IS STILL
 REQUIRED FOR GAS PERMIT:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.I HAVE INCLOSED AN EXAMPLE
 OF AN ISOMETRIC DRAWING OF WHICH I THINK
 YOU ARE TRYING TO CONVEY WITH OUT THE
 MEASUREMENTS.IF THIS IS WHAT YOU ARE
 TRYING TO CONVEY FILL IN THE
 MEASUREMENTS ,SIGN, AND PRINT NAME OF
 PERSON WHO DID DRAWING AND RESUBMIT.
 NOTE, 2 COPIES REQUIRED
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 3. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561)805-6730
 FAX (561)805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561)805-6721
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2005-12-29 Cont ID  
Sent By mperson Date 2005-12-29 Time 08:09 Rev Time 1.25
Received By mperson Date 2005-12-29 Time 08:09 Sent To  
Notes
2005-12-29 00:00:00DENIED
  
 REFERENCE: FBC-2004 FUEL GAS
  
 THE FOLLOWING INFORMATION IS REQUIRED
 FOR A GAS PERMIT:
 1.SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS.
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 3. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 4.PLEASE NOTE ON YOUR SUBMITTED DRAWING
 THAT WITH THE TOTAL AMOUNT OF BTU LOAD
 ON SYSTEM WITH THE LONGEST LENGTH METHOD
 THAT THE PIPE TO THE GENERATOR NEEDS TO
 BE 1-1/4" AND THE PIPE FROM THE METER TO
 THE GENERATOR BRANCH TEE NEEDS TO BE
 1-1/2". REFERENCE: FBC-2004 FUEL GAS
 TABLE 402.4(2) AND TABLE 402.4(20)
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-12-30 Cont ID  
Sent By adarroug Date 2005-12-30 Time 16:06 Rev Time 0.00
Received By adarroug Date 2005-12-30 Time 16:06 Sent To G
Notes
2005-12-30 00:00:00TO "G" BOX/RESUB