Plan Review Stops For Permit 05081648 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2005-11-21 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-11-21 |
Time |
12:20 |
Rev Time |
0.75 |
Received By |
jgomez |
Date |
2005-11-21 |
Time |
12:20 |
Sent To |
PC |
|
Notes |
2005-11-21 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: | | 1- PROVIDE COMPLETE INFORMATION FOR | | STORM SHUTTERS AND ATRIUM FIRE RATED | | DOOR AS SHOWN ON PLANS UNDER A SEPARATE | | PERMIT AS AGREED WITH ANDY FROM KENCO | | COMMUNITIES. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2005-11-21 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-11-15 |
Time |
17:05 |
Rev Time |
1.00 |
Received By |
jgomez |
Date |
2005-11-15 |
Time |
17:05 |
Sent To |
PC |
|
Notes |
2005-11-15 00:00:00 | BUILDING REVIEW | | 1- CALLED ANDY FROM THE RIF GROUP. NEED | | TO USE FBC 2001 ENERGY CALCS FORMS, NOT | | FBC 2004 FORMS. (CALLED ANDY TO HIS CELL | | PHONE AROUND 5:10PM ON 11-15-05). | | WAITING FOR CONTRACTORS RESPONSE TO | | SUBMIT CORRECT ENERGY CALCULATIONS TO | | PROCESS PERMIT. JG. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2005-09-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-09-16 |
Time |
12:28 |
Rev Time |
2.00 |
Received By |
jgomez |
Date |
2005-09-16 |
Time |
12:28 |
Sent To |
PC |
|
Notes |
2005-09-16 00:00:00 | BUILDING REVIEW CHECKLIST: | | 1- BRING PLANS BACK TO PALM BEACH COUNTY | | TO CORRECT PR NUMBERS. I TALKED TO MRS. | | GIL FROM THE COUNTY SHE SAYS THAT THIS | | IMPACT FEES RECEIPT (PR#: 05042803) | | DOESN'T MATCH THIS PROPERTY. REVISE AS | | REQUIRED. BRING BACK CORRECT PAID | | RECEIPT AND PLANS STAMPED WITH | | CORRESPONDING PR NUMBER. | | | | 2- NEED RECORDED N.O.C. | | | | 3- ENERGY CALCS ARE GETTING THE CEILING | | FANS CREDIT. REVISE ELECTRICAL PLAN TO | | SPECIFY CEILING FAN SIZE IN EACH ROOM | | INCLUDING CEILINGS FANS REQUIRED IN THE | | GREAT ROOM. SEE TABLE 6-6 CHAPTER 13 FBC | | | | 4- REVISE ROOF FRAMING PLAN AT ENTRY | | PORCH ROOF. CONCRETE BEAM DOESN'T EXTEND | | TO THE FOYER AREA. REVISE FRAMING AROUND | | KNEEWALL ON THE LEFT HAND SIDE. THERE IS | | NOT CONCRETE BEAM. REVISE ROOF FRAMING | | PLAN AS REQ'D AND SPECIFY CORRESPONDING | | CONNECTORS. SEC. 104.2.1.2 CITY | | AMENDEMNTS TO FBC 2001. | | | | 5- MULLION SIZE SPECIFIED FOR FIXED | | WINDOWS AT GREAT ROOM AREA DOESN'T | | RESIST THE DESIGN PRESSURES. REVISE AS | | REQ'D. SEC. 104.2.1.2 CITY AMENDMENTS TO | | FBC. | | | | 6- TRUSS ANCHOR SCHEDULE: REVISE NUMBER | | OF NAILS FOR HUS26. SEE 2005 CATALOGUE. | | | | 7- PROVIDE PRODUCT APPROVAL FOR: | | A) "INSWING" 1HR FIRE RATED DOOR AT | | ATRIUM AS SHOWN ON PLANS. | | | | B) MULLION SIZE SPECIFIED FOR FIXED | | WINDOWS AT GREAT ROOM AREA. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | JULIO GOMEZ AT (561)805-6712. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2006-02-03 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-02-03 |
Time |
18:18 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-02-03 |
Time |
18:18 |
Sent To |
PC |
|
Notes |
2006-02-03 00:00:00 | REDLINED 8' MIN GRND ROD 250.52A5 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2005-09-02 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-09-02 |
Time |
15:49 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2005-09-02 |
Time |
15:49 |
Sent To |
M |
|
Notes |
2005-09-02 00:00:00 | 210.52C1? |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2006-01-27 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-01-27 |
Time |
13:08 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-01-27 |
Time |
13:08 |
Sent To |
E |
|
Notes |
2006-01-27 00:00:00 | TO "DPALMER' DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2005-10-22 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-11-15 |
Time |
16:23 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-10-22 |
Time |
11:49 |
Sent To |
B |
|
Notes |
2005-10-22 00:00:00 | TO "JGOMEZ" DESK/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2005-09-02 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-10-22 |
Time |
11:48 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-09-02 |
Time |
10:53 |
Sent To |
E |
|
Notes |
2005-09-02 00:00:00 | TO "SFR" "E" |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2005-09-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-09-16 |
Time |
13:42 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2005-08-29 |
Time |
11:33 |
Sent To |
|
|
Notes |
2005-08-29 00:00:00 | TO "Z" BOX |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2005-09-07 |
|
|
Cont ID |
|
Sent By |
prafter |
Date |
2005-09-07 |
Time |
08:51 |
Rev Time |
1.00 |
Received By |
prafter |
Date |
2005-09-07 |
Time |
08:51 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2005-09-08 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2005-09-08 |
Time |
10:25 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2005-11-15 |
Time |
17:04 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2005-11-15 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2005-09-01 |
Time |
17:34 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2005-09-01 |
Time |
17:34 |
Sent To |
I |
|
Notes |
2005-11-15 00:00:00 | APPROVED BY MICHELLE ON 9-1-05. SEE | | SURVEY |
|
|