Plan Review Details - Permit 05081072
Plan Review Stops For Permit 05081072
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2005-11-21 Cont ID  
Sent By jgomez Date 2005-11-21 Time 17:56 Rev Time 0.50
Received By jgomez Date 2005-11-21 Time 17:56 Sent To PC
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-10-04 Cont ID  
Sent By jgomez Date 2005-10-04 Time 07:57 Rev Time 0.50
Received By jgomez Date 2005-10-04 Time 07:57 Sent To PC
Notes
2005-10-04 00:00:00BUILDING REVIEW CHECKLIST:
 1- PERMIT APPLICATION SAYS FOOTER BY
 OTHERS. CONTRACTOR REPLIED BY SAYING
 THAT POOL CONTRACTOR IS DOING THE
 FOOTING. I RESEARCHED THE POOL PERMIT
 AND THERE IS NOT DETAIL FOR FOOTING FOR
 ENCREEN ENCLOSURE. I EVEN RESEARCHED
 THRU THE MAIN HOUSE BUILDING PERMIT AND
 THERE IS NOT INDICATION OR DETAILS FOR
 SCREEN ENCLOSURE FOOTING EITHER. THERE
 IS NOT ENGINEERING DETAILS ANYWHERE FOR
 THIS FOOTING.
 THEREFORE, NEED TO APPLY FOR SEPARATE
 FOOTING PERMIT AND PROVIDE ALL
 SPECIFICATIONS FROM THE DESIGNER
 RESPONSIBLE FOR IT.
 OR, SINCE FOOTERS ARE INCIDENTAL TO THE
 SCOPE OF WORK OF THE SCREEN ENCLOSURE
 CONTRACTOR, THEN, SUCH CONTRACTOR MAY
 INCLUDE THIS WORK IN THE APPLICATION AND
 REVISE VALUATION FEE ACCORDINGLY.
 DRAWINGS AND SPECIFICATIONS FOR FOOTINGS
 ARE STILL REQUIRED.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC
 2001.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-09-19 Cont ID  
Sent By jgomez Date 2005-09-19 Time 14:57 Rev Time 0.33
Received By jgomez Date 2005-09-19 Time 14:57 Sent To PC
Notes
2005-09-19 00:00:00BUILDING REVIEW CHECKLIST:
 1- NEED RECORDED NOTICE OF COMMENCEMENT.
  
 2- DRAWING IN SCREEN ENCLOSURE
 BEAM-COLUMN CALCULATOR DOESN'T MATCH
 LAYOUT SHOWN ON SHEET 1 OF 1. SEE
 DIMENSIONS AND SHAPE OF SCREEN
 ENCLOSURE.
  
 3- REVISE LOADS SHOWN ON CALCULATOR
 SHEET. DESIGN LOAD TO BE 10PSF MIN.AS
 REQUIRED BY SEC. 2002.4 FBC 2001.
  
 4- MISSING SHEET 2 OF 2 OF MASTER PLANS.
 NEED SPAN TABLES TO VERIFY COLUMN AND
 BEAM SPAN. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 5- SHEET 1 OF 2 OF MASTER PLAN SAYS THAT
 "MAX ROOF SPAN=38'-0". CLARIFY AS
 REQUIRED. SEE DIMENSIONS ON PROPOSED
 LAYOUT.
  
 6- PROVIDE DETAILS AND SPECIFICATIONS
 FOR FOOTING TO SUPPORT THE SCREEN
 ENCLOSURE.
  
 7- PERMIT APPLICATION SAYS FOOTER BY
 OTHERS. WHO'S DOING THE FOOTING. IS IT
 GOING TO BE SEPARATE PERMIT?
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-11-18 Cont ID  
Sent By adarroug Date 2005-11-18 Time 15:14 Rev Time 0.00
Received By adarroug Date 2005-11-18 Time 15:06 Sent To B
Notes
2005-11-18 00:00:00TO "JGOMEZ" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-09-29 Cont ID  
Sent By adarroug Date 2005-09-29 Time 18:45 Rev Time 0.00
Received By adarroug Date 2005-09-29 Time 18:45 Sent To B
Notes
2005-09-29 00:00:00TO "JGOMEZ' DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-08-29 Cont ID  
Sent By adarroug Date 2005-08-29 Time 09:00 Rev Time 0.00
Received By adarroug Date 2005-08-29 Time 09:00 Sent To B
Notes
2005-08-29 00:00:00TO "MISC" BOX#2

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-08-17 Cont ID  
Sent By adarroug Date 2005-08-17 Time 09:54 Rev Time 0.00
Received By adarroug Date 2005-08-17 Time 09:54 Sent To Z
Notes
2005-08-17 00:00:00TO "Z" BOX

Review Stop Z ZONING
Rev No 1 Status P Date 2005-08-23 Cont ID  
Sent By mmclean Date 2005-08-23 Time 17:56 Rev Time 0.00
Received By mmclean Date 2005-08-23 Time 17:56 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved