Plan Review Stops For Permit 05080595
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2005-11-18 Cont ID  
Sent By jgomez Date 2005-11-18 Time 17:45 Rev Time 0.50
Received By jgomez Date 2005-11-18 Time 17:41 Sent To PC
Notes
2005-11-18 00:00:00BUILDING REVIEW APPROVED WITH PROVISO
 (PROVIDE INFO. PRIOR TO INSTALLATION TO
 AVOID DELAYS OR CONFLICTS):
  
 1- PROVIDE COMPLETE INFORMATION FOR
 STORM SHUTTERS AND 8'-0"HIGH 1 HR FIRE
 RATED "INSWING" DOOR AS SHOWN ON PLANS
 AT ATRIUM UNDER A SEPARATE PERMIT AS
 AGREED WITH CONTRACTOR.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-11-18 Cont ID  
Sent By jgomez Date 2005-11-16 Time 12:06 Rev Time 1.00
Received By jgomez Date 2005-11-16 Time 12:06 Sent To  
Notes
2005-11-16 00:00:0011-15-05 CALLED ANDY TO SUBMIT CORRECT
 ENERGY CALCS TO PROCEED WITH PERMIT
 APPLICATION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-09-14 Cont ID  
Sent By jgomez Date 2005-09-14 Time 11:52 Rev Time 2.00
Received By jgomez Date 2005-09-14 Time 11:52 Sent To PC
Notes
2005-09-14 00:00:00BUILDING REVIEW CHECKLIST:
 1- NEED RECORDED NOTICE OF COMMENCEMENT.
  
 2- IMPACT FEES PAID RECEIPT SUBMITTED
 PR#05040709 DOESN'T MATCH PR# STAMPED ON
 PLANS. REVISE AS REQUIRED.
  
 3- ENERGY CALCS ARE GETTING THE CEILING
 FAN CREDIT. THEREFORE, NEED TO SPECIFY
 CEILING FAN SIZES IN THE ELECTRICAL
 PLAN, INCLUDING FANS REQUIRED IN THE
 GREAT ROOM. SEE TABLE 6-6 CHAPTER 13 FBC
  
 4- ROOF FRAMING PLAN NEEDS TO BE REVISED
 AT ENTRY PORCH AREA. CONCRETE BM DOESN'T
 EXTEND ALL THE WAY BACK TO THE FOYER.
 ALSO, REVISE THE KNEEWALL AT THE LEFT
 HAND SIDE OF THE ROOF. IT'S NOT CONCRETE
 BEAM. SEE PLANS AND REVISE FRAMING PLAN
 AS REQUIRED AND SPECIFY CORRESPONDING
 CONNECTOR. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 5- TRUSS ANCHOR SCHEDULE: REVISE NUMBER
 OF NAILS FOR HUS26. SEE 2005 CATALOGUE.
  
 6- PROVIDE PRODUCT APPROVAL FOR:
 A)INSWING 1HR FIRE RATED DOOR AS SHOWN
 AT ATRIUM.PRODUCT APPROVAL SUBMITTED IS
 FOR "OUTSWING" APPLICATION.
  
 B) WINDOW MULLION SPECIED @ GREAT RM
 FIXED WINDOWS.
  
 C) 12'-0" SLIDING GLASS DOORS.
  
 7- SPECIFY MULLION SIZE AND ANCHORS FOR
 FIXED WINDOWS AT GREAT ROOM. . SIZE
 SPECIFIED ON WINDOW SCHEDULE DOESN'T
 MEET THE CALCULATED DESIGN PRESSURES.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-02-03 Cont ID  
Sent By dpalmer Date 2006-02-03 Time 18:45 Rev Time 0.00
Received By dpalmer Date 2006-02-03 Time 18:45 Sent To PC
Notes
2006-02-03 00:00:00 
  
 PLEASE SEE MIN GRND ROD 8' PER
 250.52A5
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-08-15 Cont ID  
Sent By dpalmer Date 2005-08-15 Time 20:47 Rev Time 0.20
Received By dpalmer Date 2005-08-15 Time 20:47 Sent To M
Notes
2005-08-15 00:00:00NOTED 210.52C1
  
 ELECTRICAL PLANS STAMPED, OK.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-01-27 Cont ID  
Sent By adarroug Date 2006-01-27 Time 15:53 Rev Time 0.00
Received By adarroug Date 2006-01-27 Time 15:53 Sent To E
Notes
2006-01-27 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-11-08 Cont ID  
Sent By adarroug Date 2005-11-08 Time 09:17 Rev Time 0.00
Received By adarroug Date 2005-11-08 Time 09:17 Sent To B
Notes
2005-11-08 00:00:00TO "JGOMEZ" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-08-15 Cont ID  
Sent By adarroug Date 2005-08-15 Time 10:04 Rev Time 0.00
Received By adarroug Date 2005-08-15 Time 10:04 Sent To E
Notes
2005-08-15 00:00:00TO "SFR" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-09-14 Cont ID  
Sent By jgomez Date 2005-09-14 Time 12:19 Rev Time 0.00
Received By jgomez Date 2005-08-10 Time 18:20 Sent To  
Notes
2005-08-10 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-08-16 Cont ID  
Sent By prafter Date 2005-08-16 Time 07:52 Rev Time 0.50
Received By prafter Date 2005-08-16 Time 07:52 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-08-17 Cont ID  
Sent By jleech Date 2005-08-17 Time 08:51 Rev Time 0.25
Received By jleech Date 2005-08-17 Time 08:51 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-08-11 Cont ID  
Sent By mmclean Date 2005-08-11 Time 17:59 Rev Time 0.00
Received By mmclean Date 2005-08-11 Time 17:59 Sent To I
Notes
***NONE***