Plan Review Details - Permit 05060651
Plan Review Stops For Permit 05060651
Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2006-02-28 Cont ID  
Sent By jgomez Date 2006-02-28 Time 13:39 Rev Time 0.33
Received By jgomez Date 2006-02-28 Time 13:39 Sent To P
Notes
2006-02-28 00:00:00DRAWING A-1.0 SUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2006-02-14 Cont ID  
Sent By jgomez Date 2006-02-14 Time 15:28 Rev Time 0.00
Received By jgomez Date 2006-02-14 Time 15:28 Sent To P
Notes
2006-02-14 00:00:00BUILDING REVISION CHECKLIST:
 1- PLUMBING RISER DIAGRAM WAS CROSSED
 OUT TO AVOID ROUTINGFOR PLUMBING
 REVIEW. THE PLUMBING RISER DIAGRAM IS
 PART OF THE CONSTRUCTION DOCUMENTS
 SUBMITTED BY THE ARCHITECT AND IT CAN'T
 BE CROSSED OUT. PROVIDE CLEAN COPY TO
 ROUTE TO PROPER REVIEW TRADES.
  
 2- APPLY FOR SHUTTERS AS AGREED ON
 PROVISO AS SOON AS POSSIBLE TO AVOID
 DELAYS OR CONFLICTS.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2006-01-30 Cont ID  
Sent By jgomez Date 2006-01-30 Time 17:35 Rev Time 0.50
Received By jgomez Date 2006-01-30 Time 17:23 Sent To PC
Notes
2006-01-30 00:00:00ENERGY CALCULATIONS REVISION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2006-01-18 Cont ID  
Sent By jgomez Date 2006-01-18 Time 18:51 Rev Time 0.00
Received By jgomez Date 2006-01-18 Time 17:23 Sent To PC
Notes
2006-01-18 00:00:00BUILDING REVISION CHECKLIST:
 1- DRAWING A-1.0 INCLUDES PLUMBING RISER
 DIAGRAM AND IT WAS CROSS OUT. PLUMBING
 RISER DIAGRAM IS PART OF THE
 CONSTRUCTION DOCUMENTS AND IT CAN'T BE
 CROSSED OUT. RE-SUBMIT CLEAN DRAWINGS.
  
 2- PROVIDE INFORMATION REQUESTED ON
 CHECKLIST DATED 1-10-06 TO AVOID
 CONFLICTS OR DELAYS.SEE ATTACHED COPY.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-12-12 Cont ID  
Sent By dpalmer Date 2006-01-10 Time 08:58 Rev Time 0.75
Received By jgomez Date 2005-12-12 Time 12:16 Sent To PC
Notes
2005-12-12 00:00:00BUILDING REVIEW CHECKLIST:
 1- APPLY FOR SHUTTERS UNDER A SEPARATE
 PERMIT AS AGREED ON PROVISO:
 APPLY NOW TO AVOID DELAYS OR CONFLICTS
 GIVEN THE HIGH VOLUME OF PERMIT
 APPLICATIONS THE CITY IS RECEIVING.
  
 2- ENERGY CALCULATIONS SUBMITTED ARE FBC
 2004 FORMS. NEED TO PROVIDE FBC 2001
 FORMS, SINCE PLANS WERE REVIEWED UNDER
 FBC 2001.
  
 3- OWES $80.00 REVISION FEES.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-07-25 Cont ID  
Sent By jgomez Date 2005-07-25 Time 10:05 Rev Time 2.00
Received By jgomez Date 2005-07-25 Time 10:05 Sent To PC
Notes
2005-07-25 00:00:00BUILDING REVIEW PROVISO:
 1- SHUTTERS UNDER A SEPARATE PERMIT.
 2- NEED WORST CASE SCENARIO ENERGY CALCS
 3- CLARIFY DOOR/WINDOW SCHEDULE. DON'T
 MIX TOGETHER DOOR/WINDOW SYMBOLS.
 4- REVISE DETAIL 5/D1: CONNECTOR HTS20
 CAN'T SUPPORT BEAM.
 5- UPDATE HUS26 NAIL SIZE.SEE CATALOGUE
 6- REVISE CONNECTOR SPECIFIED AT ENTRY
 PORCH TO MATCH DETAILS 5/D1 AND 6/D1.
 7- RE-SUBMIT PRODUCT APPROVAL FOR:
 A)ROOF TILE. B)SINGLE HUNG WINDOWS.
 C)FIXED WINDOWS.
 8- SHEET A-5 SHEAR VALUES NOTE: PROVIDE
 HAND CALCULATIONS. WHY USING TIMBER
 CONSTRUCTION MANUAL FOR TAPCON VALUES?

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2006-02-09 Cont ID  
Sent By dpalmer Date 2006-02-09 Time 07:18 Rev Time 0.00
Received By dpalmer Date 2006-02-09 Time 07:17 Sent To B
Notes
2006-02-09 00:00:00** REDLINED **
  
 VERIFY OCP FOR CU, SHOWS 9.8KW, 40A OCP
  
 MIN 8' GROUND ROD REQUIRED PER 250.52A
  
 VERIFY MIN OCP FOR AHU#2, PER 424.3B,
 MIN OCP 125%.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-02-03 Cont ID  
Sent By dpalmer Date 2006-02-03 Time 18:56 Rev Time 0.00
Received By dpalmer Date 2006-02-03 Time 18:56 Sent To PC
Notes
2006-02-03 00:00:00REDLINED.
  
 MIN OCP FOR AHU #2 , PER 424.3B, 125%
 MIN. (60A)
  
 PLEASE SEE MIN GRND ROD 8' PER
 250.52A5
  

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2006-01-10 Cont ID  
Sent By dpalmer Date 2006-01-10 Time 08:37 Rev Time 0.00
Received By dpalmer Date 2006-01-10 Time 08:37 Sent To B
Notes
2006-01-10 00:00:00********* UNSAT **********
  
  
 1)NOTE: PLEASE SEE PANEL "A" IS MISSING
 LOAD FROM PANEL "B"AND "C".
 PLEASE ALSO SEE LOADS ON PANEL "B" AND
 "C". SOME ARE SHOWN WITH 83 KW, 96, KW
 ETC.
 PLEASE ADJUST LOADS AND CALCUALTIONS.
 220, 215.5
  
 2)NOTE: PLEASE SEE MISSING RECEPT PER
 210.52
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-06-24 Cont ID  
Sent By dpalmer Date 2005-06-24 Time 09:15 Rev Time 0.25
Received By dpalmer Date 2005-06-24 Time 09:15 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-02-01 Cont ID  
Sent By adarroug Date 2006-02-01 Time 18:14 Rev Time 0.00
Received By adarroug Date 2006-02-01 Time 18:14 Sent To E
Notes
2006-02-01 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-01-27 Cont ID  
Sent By adarroug Date 2006-01-27 Time 15:54 Rev Time 0.00
Received By adarroug Date 2006-01-27 Time 15:54 Sent To E
Notes
2006-01-27 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2006-01-22 Cont ID  
Sent By adarroug Date 2006-01-22 Time 12:50 Rev Time 0.00
Received By adarroug Date 2006-01-22 Time 12:50 Sent To B
Notes
2006-01-22 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-12-30 Cont ID  
Sent By adarroug Date 2005-12-30 Time 09:33 Rev Time 0.00
Received By adarroug Date 2005-12-30 Time 09:33 Sent To E
Notes
2005-12-30 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-11-15 Cont ID  
Sent By adarroug Date 2005-11-15 Time 14:10 Rev Time 0.00
Received By adarroug Date 2005-11-15 Time 14:10 Sent To B
Notes
2005-11-15 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-06-21 Cont ID  
Sent By adarroug Date 2005-06-21 Time 10:36 Rev Time 0.00
Received By adarroug Date 2005-06-21 Time 10:36 Sent To E
Notes
2005-06-21 00:00:00TO "SFR" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-07-25 Cont ID  
Sent By shill Date 2005-07-25 Time 10:54 Rev Time 0.00
Received By jgomez Date 2005-06-10 Time 09:39 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-07-25 Cont ID  
Sent By jgomez Date 2005-07-25 Time 10:54 Rev Time  
Received By jgomez Date   Time   Sent To  
Notes
2005-07-25 00:00:00APPROVED BY PATTY KRAUSS. SEE PLANS.

Review Stop P PLUMBING
Rev No 3 Status P Date 2006-02-28 Cont ID  
Sent By jleech Date 2006-02-28 Time 17:49 Rev Time 0.00
Received By jleech Date 2006-02-28 Time 17:49 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2006-02-17 Cont ID  
Sent By jleech Date 2006-02-17 Time 07:02 Rev Time 0.25
Received By jleech Date 2006-02-17 Time 07:02 Sent To B
Notes
2006-02-17 00:00:00PLEASE DO NOT "X" OUT PARTS OF THE PLAN.
 IF REVISIONS ARE REQUIRED THE PLANS NEED
 TO REVIEWED AND RESTAMPED BY ALL TRADES
 INVALVED.
 JOHN LEECH
 805-6695

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-06-25 Cont ID  
Sent By jleech Date 2005-06-25 Time 07:07 Rev Time 0.25
Received By jleech Date 2005-06-25 Time 07:07 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-06-20 Cont ID  
Sent By jgomez Date 2005-07-25 Time 10:55 Rev Time 0.00
Received By mmclean Date 2005-06-20 Time 16:39 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved