Plan Review Details - Permit 05060458
Plan Review Stops For Permit 05060458
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2006-02-07 Cont ID  
Sent By jgomez Date 2006-02-07 Time 12:54 Rev Time 0.00
Received By jgomez Date 2006-02-07 Time 12:53 Sent To  
Notes
2006-02-07 00:00:00ENERGY CALCS AND ATRIUM DOOR REVISION
 AND PRODUCT APPROVAL.
 NEED STORM SHUTTERS PERMIT AS AGREED ON
 PROVISO.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-12-06 Cont ID  
Sent By jgomez Date 2005-12-06 Time 16:42 Rev Time 0.50
Received By jgomez Date 2005-12-06 Time 16:42 Sent To PC
Notes
2005-12-06 00:00:00BUILDING REVIEW CHECKLIST:
 1- ENERGY CALCULATIONS SUBMITTED ARE FBC
 2004 FORMS. NEED FBC 2001 FORMS SINCE
 PLANS WERE REVIEWED UNDER FBC 2001.
  
 2- APPLY FOR STORM SHUTTERS UNDER A
 SEPARATE PERMIT AS AGREED ON PROVISO.
 AVOID DELAYS OR CONFLICTS SINCE WE ARE
 EXPERIENCING A LARGE VOLUME OF PERMIT
 APPLICATIONS.
  
 3- MISSING REVISED SHEET A-5 THAT
 ADDRESSES ROOF FRAMING PLAN COMMENTS.
  
 4- PROVIDE PRODUCT APPROVAL FOR ATRIUM
 DOOR. SEE PLANS FOR SIZE AND DOOR SWING
 SPECIFIED.
  
 5- OWES $60.00 FOR REVISION FEES.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-08-31 Cont ID  
Sent By jgomez Date 2005-08-31 Time 10:50 Rev Time 0.75
Received By jgomez Date 2005-08-31 Time 10:49 Sent To PC
Notes
2005-08-31 00:00:00BUILDING SUBMITTAL CHECKLIST:
 1- SEPARATE PERMIT FOR SHUTTERS HAS NOT
 BEEN APPLIED FOR YET.
  
 2- ENERGY CALCULATIONS WERE REVISED. NOW
 CEILING FAN CREDIT WAS TAKEN. THEREFORE,
 NEED TO REVISE ELECTRICAL PLAN SHOWING
 SIZE OF CEILING FANS, INCLUDING FANS IN
 THE GREAT ROOM AS REQUIRED BY TABLE 6-6
 OF CHAPTER 13 FBC 2001.
  
 3- ROOF FRAMING PLAN NEED TO BE REVISED
 AT ENTRY PORCH AREA TO MATCH FOUNDATION
 PLAN AND FLOOR PLAN. NOTICE THAT
 CONCRETE BEAM DOESN'T EXTEND ALL THE WAY
 INSIDE TO THE FOYER AREA. CONCRETE BEAM
 IS ONLY AT ENTRY PORCH AREA. THEN,
 SPECIFIED TRUSS CONNECTORS AS REQ'D. SEC
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
  
 4- TRUSS ANCHOR SCHEDULE: REVISE NUMBER
 OF NAILS SPECIFIED FOR CONNECTOR HUS26.
 SEE 2005 CATALOGUE.
  
 5- ONE HOUR FIRE RATED DOOR AT ATRIUM
 PRODUCT APPROVAL SUBMITTED IS FOR
 OUTSWING DOOR. PLANS SHOW INSWING DOOR.
 REVISE AS REQUIRED.
  
 6- WINDOW MULLION SIZE SPECIFIED FOR
 FIXED WINDOWS AT GREAT ROOM DOESN'T
 RESIST THE CALCULATED DESIGN PRESSURES.
 SEE PRODUCT APPROVAL AND REVISE SIZE OF
 MULLION AS REQUIRED. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 7- REVISED DRAWINGS WILL BE SUBJECT TO
 THE REVISION FEES. SEE SUBMITTAL FORM
 FOR FEES.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-07-05 Cont ID  
Sent By jgomez Date 2005-07-05 Time 10:16 Rev Time 2.00
Received By jgomez Date 2005-07-05 Time 10:16 Sent To PC
Notes
2005-07-05 00:00:00BUILDING REVIEW PROVISO:
 1- SHUTTERS UNDER A SEPARATE PERMIT.
 2- SUBMIT REVISED ENERGY CALCULATIONS
 FOR WORST CASE SCENARIO.
 3- ROOF FRAMING PLAN: REVISE CONNECTOR
 SPECIFIED AT FRONT PORCH MASONRY BEAMS.
 SEE DETAILS 4/D1 AND 5/D1.
 4- TRUSS ANCHOR SCHEDULE: REVISE NAIL
 SIZE FOR HUS26. SEE CATALOGUE.
 5- PROVIDE FLORIDA PRODUCT APPROVAL FOR:
 A) 1 HR FIRE RATED DOOR EGRESS ASSEMBLY.
 FLORIDA PRODUCT APPROVAL TO MATCH NOA.
 BENCHMARK AND THERMA TRU ARE 2 DIFFERENT
 MODELS.
 B) FIXED WINDOWS MISSING FLORIDA PAGES.
 C) SINGLE HUNG WINDOWS MISSING FL. PAGES
 D) ROOF TILE NEEDS FLORIDA PAGES WITH
 MATCHING REPORT.
 6- WINDOW MULLIONS: CLEARLY SPECIFY SIZE
 OF MULLION AND ANCHORS TO BE USED IN
 FIXED WINDOW AT GREAT ROOM. SE DESIGN
 PRESSURES ON PLANS. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 7- PROVIDE CLEAR WINDOW/DOOR SCHEDULES
 WITH MATCHING SIZES AND SYMBOLS USED.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-02-10 Cont ID  
Sent By dpalmer Date 2006-02-10 Time 08:15 Rev Time 0.00
Received By dpalmer Date 2006-02-10 Time 08:15 Sent To PC
Notes
2006-02-10 00:00:00REDLINED:
  
 * MIN GRND ROD SHALL BE 8', 250.52A5
  
 MIN OCP FOR CU#1 TO BE VIF.9.8KW ON 40A
 OCP.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-02-03 Cont ID  
Sent By dpalmer Date 2006-02-03 Time 14:30 Rev Time 0.00
Received By dpalmer Date 2006-02-03 Time 14:26 Sent To PC
Notes
2006-02-03 00:00:00REDLINED,
  
 CROSSED OUT CIRCUIT #38

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-06-15 Cont ID  
Sent By dpalmer Date 2005-06-15 Time 16:56 Rev Time 0.30
Received By dpalmer Date 2005-06-15 Time 16:56 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-02-07 Cont ID  
Sent By adarroug Date 2006-02-07 Time 12:44 Rev Time 0.00
Received By adarroug Date 2006-02-07 Time 12:44 Sent To E
Notes
2006-02-07 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-02-06 Cont ID  
Sent By adarroug Date 2006-02-06 Time 09:37 Rev Time 0.00
Received By adarroug Date 2006-02-06 Time 09:37 Sent To B
Notes
2006-02-06 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2006-01-27 Cont ID  
Sent By adarroug Date 2006-01-27 Time 12:59 Rev Time 0.00
Received By adarroug Date 2006-01-27 Time 12:59 Sent To E
Notes
2006-01-27 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-10-19 Cont ID  
Sent By adarroug Date 2005-10-19 Time 08:54 Rev Time 0.00
Received By adarroug Date 2005-10-19 Time 08:54 Sent To B
Notes
2005-10-19 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-07-29 Cont ID  
Sent By adarroug Date 2005-07-29 Time 16:33 Rev Time 0.00
Received By adarroug Date 2005-07-29 Time 16:33 Sent To B
Notes
2005-07-29 00:00:00TO "JGOMEZ" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-06-15 Cont ID  
Sent By shill Date 2005-06-15 Time 13:34 Rev Time 0.00
Received By shill Date 2005-06-15 Time 13:34 Sent To  
Notes
2005-06-15 00:00:00TO RES RACK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-07-05 Cont ID  
Sent By shill Date 2005-07-05 Time 10:16 Rev Time 0.00
Received By jgomez Date 2005-06-08 Time 11:53 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-06-17 Cont ID  
Sent By hmoser Date 2005-06-17 Time 17:52 Rev Time 0.00
Received By hmoser Date 2005-06-17 Time 17:38 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-06-18 Cont ID  
Sent By jleech Date 2005-06-18 Time 09:01 Rev Time 0.25
Received By jleech Date 2005-06-18 Time 09:01 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-06-14 Cont ID  
Sent By jgomez Date 2005-07-05 Time 10:16 Rev Time 0.00
Received By mmclean Date 2005-06-14 Time 16:26 Sent To I
Notes
***NONE***