Plan Review Stops For Permit 05050382 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2005-07-07 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2005-07-07 |
Time |
12:13 |
Rev Time |
0.50 |
Received By |
lsmith |
Date |
2005-07-07 |
Time |
12:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2005-06-01 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2005-06-01 |
Time |
12:09 |
Rev Time |
0.75 |
Received By |
lsmith |
Date |
2005-06-01 |
Time |
12:09 |
Sent To |
|
|
Notes |
2005-06-01 00:00:00 | BUILDING PLAN REVIEW FAILED: | | | | 1. APPLICATION SAID "CONSTRUCT POOL & | | SPA ONLY"PLANS SHOW THERE IS A 405000 | | BTU GAS HEATER & 4" CONCRETE DECK. | | | | 2. SHOW ON PLANS THE SQ. FOOTAGE OF THE | | DECK. | | | | 3. 104.6.5 BUILDING PERMIT VALUATION. IF | | IN THE OPINION OF THE BUILDING OFFICIAL | | THE CLAIMED VALUATION OF BUILDING, AL- | | TERATION, STRUCTURE, ELECTRICAL, GAS, | | MECHANICAL OR PLUMBING SYSTEMS APPEARS | | TO BE UNDERESTIMATED ON THE APPLICATION, | | THE PERMIT SHALL BE DENIED, UNLESS THE | | APPLICANT CAN SHOW DETAILED ESTIMATES | | AND/OR BONA FIDED SIGNED CONTRACTS (EX- | | CLUDING LAND VALUE) TO MEET THE APPROVAL | | OF THE BUILDING OFFICIAL. FOR PERMITTING | | PURPOSES, VALUATION FOR BUILDINGS AND | | SYSTEMS SHALL BE FOUND IN MARSHALL AND | | SWIFT OR THE SOUTHERN BUILDING CODE | | CONGRESS INTERNATIONAL VALUATION TABLES, | | LATEST EDITION, AND SHALL BE BASED ON | | TOTAL REPLACEMENT VALUE TO INCLUDE | | STRUCTURAL, ELECTRIC, PLUMBING, MECHAN- | | ICAL, INTERIOR FINISH, NORMAL SITE WORK | | (EXCAVATION AND BACKFILL FOR BUILDINGS), | | ARCHITECTURAL AND DESIGN FEES, OVERHEAD | | AND PROFIT, EXCLUDING ONLY LAND VALUE. | | | | ANY QUESTIONS PLEASE CALL: | | LEA SMITH, BUILDING PLANS EXAMINER | | 805-6713 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2005-05-09 |
|
|
Cont ID |
|
Sent By |
ptjomsto |
Date |
2005-05-09 |
Time |
15:15 |
Rev Time |
0.00 |
Received By |
ptjomsto |
Date |
2005-05-09 |
Time |
15:15 |
Sent To |
|
|
Notes |
2005-05-09 00:00:00 | HISTORIC APPROVED 5/9/05 BY N F |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2005-06-23 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2005-06-23 |
Time |
11:06 |
Rev Time |
0.33 |
Received By |
btrobaug |
Date |
2005-06-23 |
Time |
10:38 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2005-05-20 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2005-05-20 |
Time |
17:52 |
Rev Time |
0.33 |
Received By |
btrobaug |
Date |
2005-05-20 |
Time |
17:39 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2005-06-01 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2005-06-01 |
Time |
12:08 |
Rev Time |
0.00 |
Received By |
lsmith |
Date |
2005-06-01 |
Time |
12:08 |
Sent To |
|
|
Notes |
2005-06-01 00:00:00 | HISTORIC APPROVAL NOTES TYPED INTO | | BUILDING REVIEW BOX IN ERROR BY PT. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2005-06-08 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2005-06-08 |
Time |
10:09 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2005-06-08 |
Time |
10:09 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2005-05-20 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-05-20 |
Time |
13:28 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-05-20 |
Time |
13:28 |
Sent To |
E |
|
Notes |
2005-05-20 00:00:00 | TO "E" BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2005-05-10 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-05-10 |
Time |
12:02 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-05-10 |
Time |
12:02 |
Sent To |
Z |
|
Notes |
2005-05-10 00:00:00 | TO "Z" BOX |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2005-06-22 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2005-06-22 |
Time |
18:01 |
Rev Time |
0.50 |
Received By |
jleech |
Date |
2005-06-22 |
Time |
18:01 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2005-05-27 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2005-05-27 |
Time |
16:30 |
Rev Time |
0.55 |
Received By |
kstevens |
Date |
2005-05-27 |
Time |
16:30 |
Sent To |
B |
|
Notes |
2005-05-27 00:00:00 | DENIED | | REFERENCE: FBC-2001 424.2 SWIMMING POOLS | | | | 1. FBC-2001 424.2.9 WATER SUPPLY, LOCAL | | ORD. #2853-95, BACKFLOW REQUIRED ON THE | | WATER SERVICE. (ADD TO NOTES) | | 2. FBC-2001 424.2.12.1 PRESSURE TESTS. | | PER MANUFACTURE RECOMMENDATIONS, NO AIR | | TEST SHALL BE APPROVED FOR PVC PIPE AND | | FITTINGS. (ADD TO NOTES) | | 3. FBC-2001 424.2.13.2 JOINTS AND | | CONNECTIONS, FBC PLMG. SEC 605.21 PURPLE | | PRIMER REQUIRED ON PVC PIPING. (ADD TO | | NOTES). | | 4. MANUF. SPECIFICATION SHEETS DO NOT | | SHOW POSITIVE MEANS TO RETAIN WATER | | SHOULD THE PUMP SHUT OFF. AN EXTERIOR | | HARTFORD LOOP IS REQUIRED. SECTION | | 424.2.14.2 | | 5. FBC-2001 424.2.15 GAS PIPING SHALL | | COMPLY WITH FBC FUEL GAS. SEPARATE PLANS | | AND PERMIT REQUIRED. (ADD TO NOTES) | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2005-05-19 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2005-05-19 |
Time |
11:39 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2005-05-19 |
Time |
11:39 |
Sent To |
I |
|
Notes |
|
|